T06: optimization-case schema, fail-closed evaluator, cadence and decision template. Every option including the baseline must present all ten decision fields; one unknown blocks the comparison. Validated on the storage case (Hetzner computes and loses to Scaleway by EUR 29.14/month on operator labour; Host Europe blocks on four named gaps) and on the non-storage reef-railiance k3s rightsizing case (low utilization is real, but nothing is costable while the railiance01 price is unknown). T07: portfolio report over coverage, lifecycle, utilization, cost, renewals, risks, open cases, and next actions, derived only from committed evidence. Portfolio spend is reported null rather than as a partial sum, unattributed cost is a named list rather than a spread, and unmeasurable resources are reported rather than dropped. RESOURCE-WP-0003 is finished; both cases remain blocked_on_evidence against live delegated records in other repositories. RESOURCE-WP-0002 is untouched. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
1.5 KiB
1.5 KiB
RESOURCE-WP-0003 generalized control cycle — 2026-08-11
Result
RESOURCE-WP-0003-T05 generalized the backup-specific forecast-to-actual
method into a provider-neutral portfolio contract.
The implementation consists of:
schemas/resource-control-cycle.schema.jsonfor immutable forecast and actual records;tools/control_cycle.pyfor resource-neutral comparison and controlled variance attribution;- six paired examples covering storage, fixed cluster compute, and a hybrid shared PostgreSQL service;
- tests for the three resource classes, immutable forecast binding, explicit cost attribution, and fail-closed data-quality handling;
- updated operating guidance in
docs/forecast-actual-control.md.
Boundary with fin-hub
Actual records carry booked_cost_refs; resource-control does not reproduce
the ledger fact. Fin-hub message d33f2452-8dc6-4249-a3d2-84fda938103a
confirmed explicit financial_fact_id -> resource_id binding, budget and
constraint signals, and generalized exchange health. The first operational
backup round trip remains correctly gated on RESOURCE-WP-0002 procurement;
that does not invalidate these illustrative contract fixtures.
Verification
make test: 25 tests passed and declarations validated.- All three example pairs completed through
make control-cycle. git diff --check: clean.
The examples are intentionally marked illustrative. Their values must not be reported as actual consumption or booked cost.