tegwick 2c2a6073ff feat(portfolio): complete RESOURCE-WP-0003 T06 optimization cases and T07 reporting
T06: optimization-case schema, fail-closed evaluator, cadence and decision
template. Every option including the baseline must present all ten decision
fields; one unknown blocks the comparison. Validated on the storage case
(Hetzner computes and loses to Scaleway by EUR 29.14/month on operator labour;
Host Europe blocks on four named gaps) and on the non-storage reef-railiance
k3s rightsizing case (low utilization is real, but nothing is costable while
the railiance01 price is unknown).

T07: portfolio report over coverage, lifecycle, utilization, cost, renewals,
risks, open cases, and next actions, derived only from committed evidence.
Portfolio spend is reported null rather than as a partial sum, unattributed
cost is a named list rather than a spread, and unmeasurable resources are
reported rather than dropped.

RESOURCE-WP-0003 is finished; both cases remain blocked_on_evidence against
live delegated records in other repositories. RESOURCE-WP-0002 is untouched.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-08-14 09:28:44 +02:00

4 KiB

RESOURCE-WP-0003 portfolio reporting and cadence — 2026-08-14

Result

RESOURCE-WP-0003-T07 established the portfolio view and the operating cadence.

The implementation consists of:

  • tools/portfolio_report.py — coverage, lifecycle, utilization, cost, renewals, risks, open optimization cases, and next actions, derived entirely from committed evidence;
  • docs/portfolio-operating-cadence.md — monthly observation, monthly report, quarterly calibration, pre-renewal review, and event-driven triggers, each with named inputs, consumers, and outputs;
  • make portfolio-report;
  • 22 tests in tests/test_portfolio_report.py, including a suite that renders the real committed portfolio rather than fixtures.

Nothing in the report is typed by hand. It reads data/resources/, the latest data/portfolio-coverage-*.json, and data/optimization/, and it re-validates every record it reads.

Not forcing false precision

T07 requires reporting missing evidence and unapportioned cost rather than forcing false precision. Two decisions carry that requirement:

  • known_monthly_spend_eur is null, never 0. Six of seven resources carry no price evidence and no booked cost has arrived from fin-hub. Summing the one priced resource would report a portfolio spend roughly an order of magnitude below reality while looking authoritative. The field stays unknown, accompanied by a note stating how many resources are unpriced.
  • Unattributed cost is a list of resources, not a spread. Four resources have allocation mode unattributed. They are named, with the repository that owes the allocation driver; their cost is not divided across consumers by a plausible default.

Resources whose capacity cannot be measured appear in utilization.unmeasured with the reason, rather than being dropped from the ratios and thereby flattering the portfolio average.

What the current report tells an operator

T07 is done when an operator can identify material spend, idle or saturated capacity, forecast error, approaching commitments, and the next evidence-backed action. Against the portfolio as committed on 2026-08-14:

Question Answer
Material spend Unknown, explicitly. Only the proposed backup storage carries price evidence; the rest waits on RAIL-HO-WP-0008 and FIN-WP-0004.
Idle capacity resource:hosteurope:railiance01 and resource:railiance:reef-railiance:k3s, idle on every measured metric at 14 percent CPU and 37 percent memory. Five resources are unmeasurable.
Saturated capacity None.
Forecast error Not yet computable. The control-cycle mechanism is proven on paired examples, but no operational actual observation exists, so no variance is reported and none is fabricated.
Approaching commitments None visible within 90 days — and the finding is that six active resources have no renewal or cancellation date at all, so no cancellation window can be respected.
Next action The next_actions list: seven delegated workplans, the booked-cost dependency on fin-hub, and six missing contract-date records, each addressed to its owner.

Structural risk surfaced

The risk section reports concentration mechanically rather than in prose: six of seven resources share host:railiance01 and five share cluster:reef-railiance. That includes every workload the proposed backup storage exists to protect, which is the standing argument against same-provider placement recorded in opt:platform-audit-storage:2026-08. Thresholds are explicit in the tool — idle at or below 35 percent, saturated at or above 85 percent, renewal horizon 90 days, failure-domain concentration above two resources.

Boundaries held

The report reads; it does not write to any other repository. Every unknown it prints is attributed to the repository or authority that owns it, and the next_actions list is the message sent back to those owners on the monthly cadence. No booked financial fact is reproduced here; spend remains fin-hub's authority under docs/fin-hub-resource-control-contract-v0.1.md.