Scaffold the research layout from the research program, add INTENT/SCOPE, research instruments, concept stubs, and SOUL-WP-0001–0008 phase workplans. Register the repo with State Hub under domain agents for hub-synced execution.
2.9 KiB
| id | type | title | domain | repo | status | owner | topic_slug | priority | created | updated |
|---|---|---|---|---|---|---|---|---|---|---|
| SOUL-WP-0001 | workplan | Research repository foundation and State Hub registration | agents | soul-frame | active | grok | soul-frame | high | 2026-08-09 | 2026-08-09 |
SOUL-WP-0001 — Research repository foundation
Goal
Establish the Soul Frame research repository as operable: layout from the research program, standing INTENT, research instruments, concept stubs, State Hub registration, and hub-synced workplans for the research sequence.
Baseline conceptual draft: SoulFrameIntroduction.md
Research agenda: ResearchProgram.md (from history/260809-SoulFrameResearchProgram.md)
Depends on
- None (founding workplan)
Parallel / follow-on
- SOUL-WP-0002 — Phase I Foundations (starts after instruments exist)
- Later phases remain proposed until prior phase synthesis is sufficient
Tasks
T01 — Repository structure per research program
id: SOUL-WP-0001-T01
status: done
priority: high
Create the layout from ResearchProgram.md §10:
- Root instruments: Terminology, Claims, OpenQuestions, ThoughtExperiments
research/workstream directoriessources/,concepts/,paper/- Seed concept stubs and instrument templates
Done when: tree matches the proposed research repository layout.
T02 — INTENT.md and SCOPE.md
id: SOUL-WP-0001-T02
status: done
priority: high
Write standing purpose (INTENT.md) and operational boundaries (SCOPE.md)
aligned with the research stance (systems framework, not consciousness theory).
Done when: both files exist and are linked from README.md.
T03 — Phase workplans for the research sequence
id: SOUL-WP-0001-T03
status: done
priority: high
Author workplans SOUL-WP-0002 through SOUL-WP-0008 covering research phases
I–VII from ResearchProgram.md §11, with tasks, dependencies, and priorities.
Done when: phase workplan files exist under workplans/.
T04 — Register repo with State Hub
id: SOUL-WP-0001-T04
status: done
priority: high
Register soul-frame under domain agents (classification in
.repo-classification.yaml), host path, agent instruction stubs as needed.
Done when: GET /repos/soul-frame succeeds with local path on this host.
T05 — fix-consistency write-back of hub IDs
id: SOUL-WP-0001-T05
status: todo
priority: high
Commit workplans, run make fix-consistency REPO=soul-frame so C-06 creates
workstreams and writes state_hub_workstream_id / task IDs into files.
Done when: each SOUL-WP file has hub IDs; consistency check is clean or warnings-only.
T06 — README orientation for operators
id: SOUL-WP-0001-T06
status: done
priority: medium
README documents start-here docs, layout, and research phase summary.
Done when: new operator can navigate INTENT → ResearchProgram → workplans without tribal knowledge.