soul-frame/workplans/SOUL-WP-0007-phase-vi-synthesis.md
tegwick c6a5ee951d Establish Soul Frame research repository and workplans
Scaffold the research layout from the research program, add INTENT/SCOPE,
research instruments, concept stubs, and SOUL-WP-0001–0008 phase workplans.
Register the repo with State Hub under domain agents for hub-synced execution.
2026-08-09 21:38:36 +02:00

1.9 KiB
Raw Blame History

id type title domain repo status owner topic_slug priority created updated depends_on
SOUL-WP-0007 workplan Phase VI — Synthesis: crosswalk, evidence, revised ontology agents soul-frame proposed grok soul-frame medium 2026-08-09 2026-08-09
SOUL-WP-0006

SOUL-WP-0007 — Phase VI Synthesis

Goal

Integrate workstream results into:

  • concept crosswalk
  • evidence register (mature Claims)
  • revised ontology / terminology standard
  • research synthesis document
  • fiction/cultural precedents scan as conceptual laboratory (not evidence)

Also cover remaining WS11 death/legacy and WS13 fiction clusters as needed.

Depends on

  • SOUL-WP-0006 (and earlier phases' synthesis notes)

Tasks

T01 — Full concept crosswalk

id: SOUL-WP-0007-T01
status: todo
priority: high

For each matrix concept in ResearchProgram.md §5, complete adjacent-term crosswalks in concepts/ (or a consolidated research/concept-crosswalk.md).

Done when: every core concept has filled similarity/difference rows.


T02 — Claims & open questions consolidation

id: SOUL-WP-0007-T02
status: todo
priority: high

Advance H1H10 statuses; retire or revise failed concepts; clean OpenQuestions.md.

Done when: no important claim remains without literature notes; revisions logged.


T03 — Fiction & cultural precedents scan

id: SOUL-WP-0007-T03
status: todo
priority: medium

Comparative notes (e.g. Culture Minds and peers) under research/fiction-cultural-precedents/ for conceptual experiments and failure modes only.

Done when: short comparative note exists; no fiction treated as empirical proof.


T04 — Research synthesis document

id: SOUL-WP-0007-T04
status: todo
priority: high

Produce research/research-synthesis.md integrating phases IV and this phase.

Done when: synthesis is paper-ready as input to SOUL-WP-0008.