docs(STATE-WP-0079): retirement freeze policy, close T01
States the four admissible reasons for a change to state-hub during
retirement -- preserve compatibility, enable extraction, reduce scope, fix
operational risk -- and the inadmissible case: establishing new permanent
ownership in the component being retired.

The operative test is 'where does this live after cutover?', not 'is this a
good change?' Most inadmissible changes are good changes; STATE-WP-0080's
retarget to RMGR-WP-0004 is the worked example.

Enforced by review rather than new automation: a freeze-checker built inside
State Hub would itself be new permanent automation here, so the policy would
violate itself. New tables/routes/MCP tools are the one hard stop.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-08-20 07:20:56 +02:00

4.4 KiB
Raw Permalink Blame History

Retirement Freeze Policy

Policy key: retirement-freeze applies_to: every change to state-hub from 2026-08-20 until the archive window closes Assessment outcomes: Freeze-Ok | Freeze-Failed Owner task: STATE-WP-0079-T01 Related: docs/retirement-cutover-slice-plan.md, SHR-INV-0001, decision 747011c6, prj-state-hub-retirement/GOAL.md

Why this exists

State Hub is being retired: its 425 inventoried surfaces move, are replaced, or are retired under STATE-WP-0079. A retiring component attracts a specific failure — work lands here because this is where the code already is, and each such change quietly re-establishes State Hub as the permanent owner of something the program is trying to relocate. Every one of those makes the cutover larger and the archive later.

The freeze does not stop work. It constrains what kind of work is admissible.

The rule

A change to state-hub is admissible only if it does at least one of:

  1. Preserves compatibility — keeps existing callers working across a cutover step (adapters, dual-run shims, writeback reconciliation).
  2. Enables extraction — makes a capability easier to move to its inventoried owner (seam-cutting, dependency untangling, contract extraction).
  3. Reduces scope — deletes, retires, or delegates a surface.
  4. Fixes operational risk — corrects a defect that would cause data loss, corrupt evidence, or break a live caller before cutover.

A change is inadmissible if it establishes new permanent ownership here: a new capability, a new authority, a new durable schema, or new automation whose natural home is one of the receiving owners.

The load-bearing case

The four admissible reasons are deliberately broad, and reason 4 is the one that will be stretched. The test is not "is this a good change?" — most inadmissible changes are good changes. The test is "where does this live after cutover?"

If the answer is "an owner repo," build it there and let State Hub adapt to it. If the answer is "nowhere, it disappears at archive," it is admissible here. If the answer is "State Hub, indefinitely," it is inadmissible regardless of merit.

Worked example, from this program: STATE-WP-0080 was drafted as a full flavor-awareness implementation inside statehub_register.py. It was good work and it fixed a real defect. It was still inadmissible — repository standards land in repo-manager after cutover — so it was retargeted to a guard plus a delegation, and the implementation moved to RMGR-WP-0004.

Enforcement

By review, not by new automation. Building a freeze-checker inside State Hub would be new permanent automation in the component being retired — the policy would violate itself. The gate is applied where changes are already reviewed:

Point Gate
New workplan in workplans/ Goal statement names which of the four reasons applies, or the plan is retargeted to an owner repo
Task marked progress on a non-trivial change Same question, answered in the task body
Cutover slice execution (STATE-WP-0079-T04) Slices are admissible by construction — they are reasons 13
Any new table, route, or MCP tool Presumed inadmissible; requires an explicit note saying why it dies at archive

The last row is the only hard stop. New durable surface is exactly what the freeze exists to prevent, so it carries a presumption against, and the burden sits with the change.

What the freeze does not cover

  • Receiving repos. repo-manager, hub-core, activity-core, ops-hub, and fin-hub are building the successor surfaces; they are unconstrained by this policy and should be where new capability lands.
  • Work records. Workplans, ADRs, decision docs, and evidence files in this repo are the retirement program's own record. Writing them is reason 2 or 3.
  • keep items. The 45 keep-dispositioned surfaces (schema-history, ops-bridge connectivity, and the rest) stay operational until the freeze window; maintaining them is reason 1.

Interaction with the quality gates

Freeze admissibility is orthogonal to DoR/DoD (docs/work-record-quality-gates.md). A workplan can be DoR-Ok and still Freeze-Failed — well-specified work in the wrong repo is the exact failure this policy catches. Assess freeze first: it decides whether the work belongs here, before DoR asks whether it is ready.