Add Intake Definition of Comprehension and work-item Definition of Ready as hub policies with dashboard edit surfaces, document the Definition family and DoX-Ok/Failed badge convention, and mark STATE-WP-0076 finished.
5.4 KiB
Definition of Ready (DoR)
Policy key: work-item-dor
applies_to: task, workplan (separate sections below)
Assessment outcomes: unassessed | DoR-Ok | DoR-Failed
Does not apply to: intake (use DoC), decision, engagement (no DoR yet)
DoR is the quality policy for implementation-readiness of delivery records. “Work-item” in the policy name means the delivery side of the work-record framework (executable units and their plans). In body text:
- task = unit work-item
- workplan = structure (collection/plan over tasks), not “a large task”
Lifecycle status is independent of DoR assessment:
- Workplan
status=readyis a process claim; DoR-Ok means this checklist passed when last assessed. - A workplan may be
readyoractivewithout DoR-Ok (quality debt). - A task may enter
progresswithout DoR-Ok; that is allowed but discouraged for non-trivial work.
Related:
- Comprehension (discovery):
policies/intake-doc.md(DoC) - Completion:
policies/workstream-dod.md(DoD; exit companion) - Model:
docs/work-record-quality-gates.md - Lifecycle:
dashboard/src/docs/workstream-lifecycle.md
Shared criteria (task and workplan)
For DoR-Ok, the following always hold (kind sections add specifics):
- Outcome or done-condition — what “good enough to stop” looks like, or an explicit pointer to DoD / acceptance criteria.
- Scope in / out — what is included and what is explicitly out of scope (or “no material out-of-scope items”).
- Owning repo — delivery repo is known and matches ADR-001 anchoring (or the task’s parent workplan repo).
- Who executes — owner/assignee or named agent role is clear enough to start.
- Dependencies / blockers — known dependencies listed, or an explicit “none.” Unresolved hard blockers mean DoR-Failed until cleared or redesigned.
- Verification signal — how we will know it worked (test, check, manual verification note, or “N/A: pure docs” with reason).
- Lane / autonomy — lane is set or inherited where the record supports it; red/yellow work has human expectation stated if required by autonomy policy.
Section: task (kind: task)
Additional DoR-Ok criteria for a task:
- Parent workplan — task is attached to a workplan (or today’s ADHOC workplan) so execution context is not free-floating.
- Actionable title — describes a completable unit, not a multi-week program (programs belong in a workplan with multiple tasks).
- Status intent — starting
progressis justified (not blocked on missing input that should keep the task inwait).
Tasks that are pure residual cleanup may be thin; still state done-condition and verification, even if one line each.
Section: workplan (kind: workplan)
Additional DoR-Ok criteria for a workplan:
- Goal — one paragraph (or equivalent) for why this plan exists.
- Task decomposition — open work is broken into tasks, or an explicit note that the first task is “decompose further” with a bound.
- Review vs execute — if
status=ready, review metadata is present when the plan claims repo-state review (reviewed_at/reviewed_against_commitor equivalent narrative). Missing review metadata ⇒ prefer DoR-Failed for areadyclaim, or leave unassessed. - Structure role respected — the plan does not substitute for missing
DoC on a vague external spark; if the plan was promoted from intake, origin
link is present when available (
origin: intake:…).
Workplan DoR-Ok does not require all child tasks to be DoR-Ok; it requires the plan itself to be ready to run as a structure. Child tasks should be assessed when they are about to be executed.
Outside-originated profile
When the work-item or plan came from outside structural knowledge (promoted intake with external origin, third-party response work, external demand):
- Origin link —
origin/origin_refor intake id / progress note ties back to the discovery record. - Boundary decision recorded — ecosystem vs true third-party vs external demand into us.
- Our work only — scope describes our deliverable (patch, adapter, doc, decision), not control of an external backlog.
- External reference — issue/PR/URL or “none yet” with reason, when third-party interaction is in scope.
- Residual unknowns — still-open external uncertainties listed; none that would make the first implementation step pure guesswork.
Relationship to DoD and lifecycle
| Gate | When | Policy |
|---|---|---|
| DoC | Discovery understood | intake-doc |
| DoR | Ready to implement | this file |
| DoD | Quality-complete when finishing | workstream-dod |
Finishing a workplan (status=finished) without DoD-Ok is allowed; treat
as quality debt. Prefer DoR-Ok before heavy implementation; prefer DoD-Ok before
calling the outcome high-quality complete.
Assessment practice (convention)
- Assessors: workplan owner, executing agent, or human operator.
- Record
DoR-OkorDoR-Failedwith date and failed criteria if any. - Re-assess after major scope change; stale DoR-Ok after large context shift should be treated as unassessed or re-checked.
- Enforcement is convention only (STATE-WP-0076); no API hard-block.