# State Hub Workplan Convention
New workplans in this repository use:
```text
STATE-WP-0001-short-title.md
```
Workplan frontmatter should include:
```yaml
id: STATE-WP-0001
type: workplan
title: "Short Title"
domain: custodian
repo: state-hub
status: proposed
owner: custodian
topic_slug: custodian
flavor: planning
depends_on: []
```
`flavor` is `planning` | `implementation` | `refactoring` | `extension` |
`residual`. Unset is not residual. Default State Hub open views omit
`flavor: residual` until demand or risk promotes it (STATE-WP-0092).
`depends_on` lists blocker workplan ids; C-20 indexes that field.
During extraction, legacy `CUST-WP-*` plans may be bridged or migrated with
their existing `state_hub_workstream_id` values. Write files first, then run
State Hub consistency sync after this repo is registered.
When a workplan is `blocked`, record the unblock condition in frontmatter:
```yaml
status: blocked
blocked_on: message-from:llm-connect
```
`blocked_on` uses the `message-from:<agent>` form so fix-consistency can
cross-check unread inbox messages from that counterpart and warn when the
blocker may have cleared.
Canonical workplan/workstream statuses are:
```text
proposed, ready, active, blocked, backlog, finished, archived
```
Use `proposed` for a new plan that still needs review, `ready` after it has
been checked against the current repo state, and `finished` when implementation
is complete. `stalled` and `needs_review` are derived health labels, not stored
frontmatter statuses.
### Residuals when finishing
If work remains after a plan is complete, **do not** leave it only as prose or
in `SCOPE.md`. Before `status: finished`, hand off each actionable residual as
a live work record:
- parkable Green/Blue → **intake** with `origin: residual`, `origin_ref: <WP-id>`
- multi-step → **new workplan** (optional promote from residual intake)
- founder gate/time → **decision** / **engagement**
Canon: `the-custodian/canon/standards/work-record-types_v0.1.md` § Residuals.
Hub index/list: State Hub (not domain-local residual files).
### Task refinement after substantial work (required)
At each substantive checkpoint and before session close, compare the completed
work and new knowledge with the current task structure. If substantial work was
completed while the workplan's task granularity stayed unchanged, **add completed
task records for those evidenced outcomes and refine the remaining tasks**.
A long progress note inside the same broad open task does not satisfy this rule.
- Give each substantial completed deliverable a task with its actual outcome,
completion date, evidence and limits. Retrospective recording is allowed; do
not invent completion dates, deliveries, native acceptance or approvals.
- Split remaining work into independently manageable deliverables with an owner,
next action, completion criteria and real dependencies. Use `todo` for work
that can start; use `wait` only with a concrete prerequisite and unblock condition.
- Preserve existing task IDs, Hub UUIDs and history. When narrowing an umbrella
task, explain the split and map moved scope to the new task IDs. Do not mark
the umbrella done unless its retained scope is complete; preserve externally
referenced acceptance gates until their dependencies are satisfied.
- Keep task counts honest: extracting completed scope must not count the same
outcome twice or imply an effort-based completion percentage. Distinguish
source/fixture proof, actual operational proof and owner acceptance.
- Record new risks and out-of-scope findings as explicit disposition/handoff
tasks or linked live work records; do not silently expand authorization.
Make these changes in the repository source, commit/push, run the repository's
required projection sync, and verify the actual projected task counts, statuses
and dependencies. Progress events supplement the task structure; they do not
replace it. A checkpoint report must show both substantive outcomes and newly
refined remaining work when this rule is triggered.