source: repo-manager reason: deterministic projection registration Assistant: codex Assistant-Model: gpt-6-astra Assistant-Session: 01a07ff8-19d0-7820-b4d0-1353833cb7fc
2.5 KiB
| id | type | title | domain | repo | status | owner | topic_slug | created | updated | related | state_hub_workstream_id | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| STATE-WP-0091 | workplan | Check release headroom and retain a capacity allocation handoff | infotech | state-hub | ready | codex | infotech | 2026-09-10 | 2026-09-10 |
|
4c64d6a6-554d-5b16-a533-9be407fa6515 |
Residual from STATE-WP-0090: revision 61 failed with Insufficient CPU even though runtime usage was modest. Revision 63 succeeded after a measured same-service MCP request adjustment. The single 4,000m node still reserves 3,895m (97.4%), leaving 105m against a 100m API surge. Existing cluster collection and portfolio contracts are finished inputs, not workplans to reopen. No factory capacity admission follows from this release.
Check scheduling headroom before State Hub promotion
id: STATE-WP-0091-T01
status: todo
priority: high
state_hub_task_id: "f84c0f1b-3354-5466-a239-ef9ef85daa07"
Add a read-only preflight to the existing promotion path. Reuse Kubernetes and railiance-cluster capacity evidence; check effective pod requests, init/overhead, placement constraints, rollout surge and migration-hook ordering. Report observed freshness, remaining CPU/memory and precise insufficient-capacity reasons before starting Helm. Do not claim a scheduling guarantee from an aggregate sum or lower requests automatically. Prove the observed 65m refusal and 105m narrowly sufficient case, including unrelated concurrent demand. Keep atomic rollback.
Review sustained service demand and hand off shared capacity
id: STATE-WP-0091-T02
status: todo
priority: high
state_hub_task_id: "a433e2d3-6fd4-5313-9273-e3769c2cefeb"
State Hub owns its workload demand and release requirement. Check MCP latency, errors, CPU contention and coverage after the 50m-to-10m request change; its 500m limit, memory and replicas remain unchanged. The initial 1,078 five-minute samples are partial coverage, not a full week. Propose a durable release margin and hand any shared allocation or provisioning change to live records with railiance-cluster, railiance-platform and resource-control using their existing authority contracts. Include HFACT T01/T04 factory demand, other zero-request workloads and host usage; current aggregate reservation alone is not capacity admission. No unrelated allocation, procurement or scaling is authorized by this workplan. Close only after the repeatable preflight and explicit receiving work records are verified.
Evidence: docs/evidence/2026-09-10-projection-convergence.json.