A clean review window only proves an interface was silent for that window. For a heavily used interface that is weak evidence -- an infrequent caller can fall outside the window entirely, so the interface reads as retirable while still having consumers. _retirement_state now also requires silence since last_seen_at, scaled by all-time volume (RETIREMENT_QUIET_LADDER): 7d under 100 calls, 30d under 10k, 60d above. Existing guards (retired / manual hold / replacement ref / replacement verified / in-window traffic) still take precedence. On the 2026-08-20 capture this makes 15 of 19 legacy interfaces retirable and holds 4: the three six-figure /workstreams/ read paths, and GET /tasks/?workstream_id which still has live traffic. Unblocks the bulk of Wave E2 in the cutover slice plan. 7 new tests. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
6.6 KiB
| id | type | title | domain | repo | status | owner | topic_slug | created | updated | parent_project | parent_workplan | related | state_hub_workstream_id | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| STATE-WP-0079 | workplan | State Hub retirement strangler and disposition execution | infotech | state-hub | active | codex | infotech | 2026-08-09 | 2026-08-19 | prj-state-hub-retirement | SHR-WP-0001 |
|
749beac6-3c62-4284-aab5-9ed7fce900c2 |
State Hub retirement strangler and disposition execution
Goal
Execute the keep/move/replace/retire dispositions from
prj-state-hub-retirement/inventory via strangler adapters and owner handoffs,
without adding new permanent authorities here. End state: freeze window with no
normal traffic, then archive.
Dual-run handoff (RMGR-WP-0002)
Repo Manager Stage B dual-run is available:
- Flags:
RM_WRITEBACK,RM_RECONCILE,RM_PILOT_REPOS(seerepo-manager/docs/dual-run.md) - SH adapter:
api/services/repo_manager_dual_run.py(PATCH/tasks+ C-15 writeback + reconcile proxy) - Evidence:
repo-manager/docs/evidence/wp0002-completion.md
Expand pilot list here as cutover progresses; do not add new checkout mutators in State Hub.
Freeze policy for new scope
id: STATE-WP-0079-T01
status: todo
priority: high
state_hub_task_id: "375c0b66-98b0-4d5b-98dd-4ad2883a4051"
Document and enforce: changes during retirement must preserve compatibility, enable extraction, reduce scope, or fix operational risk — not establish new permanent ownership (INTENT retirement status).
Capability strangler plan
id: STATE-WP-0079-T02
status: done
priority: high
state_hub_task_id: "595c3936-20b6-453f-92b5-84f86798054a"
Group SHR-INV-0001 items into cutover slices (repo/work → repo-manager; messages/progress/projections → hub-core; catalogs → owners; retire aliases). Per slice: adapter flag, owner API, rollback.
Result (2026-08-19): docs/retirement-cutover-slice-plan.md. All 425
inventory items assigned to 19 slices in five waves plus Keep, computed against
state-hub-disposition.yaml rather than hand-counted. Each slice carries an
RM_SLICE_* flag (off/dual/owner), owner API, and rollback; Wave A reuses the
RMGR-WP-0002/0003 dual-run adapter rather than adding a mechanism.
Owner readiness verified: only Wave A (repo-manager, 165 items) is
executable — RMGR-WP-0001/0002/0003 are finished. Wave B is gated on
HUB-WP-0004 (proposed), D1 on OPS-WP-0003 (proposed), D2 on FIN-WP-0003
(proposed). Recommended first cut is A3 (registers), lowest blast radius.
Two findings for T04/T05: the 9 ops_dependency items carry no capability and
cannot be strangled behind a flag — they resolve at the T06 freeze window; and
the legacy-meter review window is 8 hours despite cadence: weekly, which is
not sufficient evidence to retire high-volume /workstreams/ interfaces (E2).
Register CLI and GOAL.md support
id: STATE-WP-0079-T03
status: done
priority: medium
state_hub_task_id: "55716f12-fb12-4a1e-a770-076c490db111"
Adapt statehub register / scaffolding so prj- repos with GOAL.md and
repo_flavor: project are valid without inventing durable-product INTENT.md
(residual from SHR-WP-0001-T01).
Result (2026-08-19): Implemented by STATE-WP-0080-T01/T02. Project
flavor is detected from classification, GOAL.md, or the prj- slug; a repo
with an existing GOAL.md is registered without durable scaffolding, while a
fresh project delegates scaffolding to rmgr scaffold. The focused State Hub
registration suite passes (20 passed).
Execute move/replace slices
id: STATE-WP-0079-T04
status: todo
priority: high
state_hub_task_id: "db5291f2-3801-40fa-abf2-ceb0e77687c9"
Implement strangler handoffs coordinated with RMGR-WP-0001 and HUB-WP-0004. Compatibility tests for each dispositioned route family.
Inherited (2026-08-19) from STATE-WP-0080-T04: this slice now also owns
deletion of the templating path in statehub_register.py — INTENT.md
generation, the AGENTS.md / CLAUDE.md / .custodian-brief.md templates,
project_rules/, and bootstrap-workplan generation. The code is dead-but-present:
project repos are already routed to rmgr scaffold. Gate the deletion on
RMGR-WP-0004-T06 proving byte-identical durable output and idempotent
re-scaffolding.
Retire legacy surfaces
id: STATE-WP-0079-T05
status: todo
priority: medium
state_hub_task_id: "02e508ed-3cde-4487-907e-d324a8a877d6"
Complete retirement of suggestions, workstream aliases, and other retire
inventory items once meters/callers allow. Keep historical rows archive-readable.
Blocker identified (2026-08-20): the legacy-meter evidence this task gates
on was being captured over an 8-hour band, not a week —
capture_legacy_meter_evidence.py fell back to hours=8 whenever --days was
omitted, so 39 of 40 captures sampled only 06:00Z–14:00Z. Interfaces called
outside that band read as unused. Three candidates on the 2026-08-19 capture had
live callers, including GET /tasks/?workstream_id (seen 2026-08-18).
Script default corrected to days=7; corrected capture
docs/evidence/legacy-meter-weekly-review-20260820.json.
Candidate rule tightened (2026-08-20): _retirement_state now requires a
quiet period scaled to all-time call volume (RETIREMENT_QUIET_LADDER: 7d under
100 calls, 30d under 10 000, 60d above). On the 2026-08-20 capture this makes 15
of 19 legacy interfaces retirable — all workstream MCP tools, the state://
resource, and the low-volume REST aliases — while holding the three six-figure
read paths (GET /workstreams/, GET /workstreams/{id},
GET /workstreams/{id}/dependencies/) and GET /tasks/?workstream_id, which
still has live traffic. Covered by 7 new tests in tests/test_legacy_meter.py.
Remaining work for this task: execute the retirement of the 15 evidenced
interfaces, then re-review the 4 held ones as their quiet counters run. The
ladder is evaluated at review time, so re-capture before deciding. See
docs/retirement-cutover-slice-plan.md § E2.
Stabilization window and archive prep
id: STATE-WP-0079-T06
status: todo
priority: high
state_hub_task_id: "d52c95c6-af3f-4b2c-804e-e07763c9a8ab"
With T06 gates: zero normal read/write window, final dump, backup/restore evidence, stop service, archive repo read-only. Residuals → live owners.
Acceptance
- Freeze policy documented
- Strangler plan covers all inventory capabilities
- prj-/GOAL.md register path works
- Move/replace slices evidenced with tests/counts
- Retire list closed or residual-owned
- Stabilization + archive prep ready for project retirement