state-hub/workplans/STATE-WP-0090-projection-task-field-convergence.md
tegwick f767a1a245 fix: preserve source task sections and explicit empty notes
Assistant: codex
Assistant-Model: gpt-6-astra
Assistant-Session: 01a07ff8-19d0-7820-b4d0-1353833cb7fc
2026-09-10 15:11:03 +02:00

2.3 KiB

id type title domain repo status owner topic_slug created updated related
STATE-WP-0090 workplan Preserve task descriptions and explicit empty notes in Forge projection infotech state-hub active codex infotech 2026-09-10 2026-09-10
STATE-WP-0086
RMGR-WP-0017
HFACT-WP-0001

HFACT-WP-0001-T02 repeatedly repairs six of 24 selected task projections after normal sync. Forge derivation truncates nested evidence and converts explicit empty intervention notes into null, disagreeing with file-authoritative deep consistency. Fix the original parser rather than applying another batch patch.

Reproduce and correct task-field derivation

id: STATE-WP-0090-T01
status: done
priority: high

Retain nested task sections, stop at the next peer/ancestor heading or task block, match source-description cleanup and preserve absent/null/empty metadata meaning. Keep task identity, status, collision and retirement rules unchanged. Test parity with the existing consistency parser and real PostgreSQL/API convergence.

Promote the verified correction and prove the selected chain

id: STATE-WP-0090-T02
status: todo
priority: high

Run relevant projection/consistency/API regressions, commit/push, consume the immutable CI image and prepare the existing Helm release with reused values and atomic rollback. Verify the exact promoted image and healthy primary, then sync the three selected repositories using RMGR-WP-0017 and read back all 24 task fields with zero manual task PATCH repairs. Preserve unrelated untracked evidence.

Retain evidence and close the bounded defect

id: STATE-WP-0090-T03
status: todo
priority: medium

Record source/image/Helm revisions, test results and before/after convergence. HFACT T02 retains other selected-backlog readiness work; native admission and factory execution remain their existing owner tasks. Do not mark factory G1/G2 complete or introduce another synchronization service.

Validation: all five new parser cases fail on the previous derivation. The corrected projection/consistency/API suite passes 242 tests on a disposable PostgreSQL database. Actual selected-source comparison reproduces six drifted tasks before the fix and zero afterward across 24 tasks. No production data was used by the tests; live promotion and readback remain T02.