Accept Candidate A for WP-0010-T01: labor-cost-anchored calculator formula

Maintainer (Bernd) accepted 2026-07-30: estimated_effort_days/daily_rate
driven directly by commit-clustered human interaction time;
approved_direct_costs from real metered AI token cost
(get_token_summary); workplan/task-volume and file/line-size metrics
serve only as a sanity check on the human-time estimate, never their
own dollar figure; Target Multiple remains a human classification.
Candidate B recorded as the considered, not-adopted alternative.
This commit is contained in:
tegwick 2026-07-30 12:58:53 +02:00
parent 5e0f39bbc8
commit 660761fc71
3 changed files with 21 additions and 7 deletions

View file

@ -152,11 +152,13 @@ Candidate A might undervalue it), but introduces a second calibration
constant ($-per-complexity-unit) with even less grounding than
`daily_rate` has.
**This document does not choose between A and B** — that is exactly the
kind of working default a future task (see workplan T02) should propose
and a maintainer should confirm, the same way
`specs/TargetDegenerationPolicyResearch.md` handled the degeneration
formula fork.
**Adopted 2026-07-30** (`workplans/TREV-WP-0010-development-effort-calculator.md`
T01, maintainer-accepted): **Candidate A is the confirmed v0 formula.**
Candidate B remains recorded here as the considered alternative, not
adopted — revisit only if Candidate A's labor-cost anchor proves
systematically wrong once real repos produce real data, the same
provisional-but-decided treatment `specs/TargetDegenerationPolicyResearch.md`
gave the degeneration formula fork.
## 4. Target Multiple classification (the Nx factor)