Accept Candidate A for WP-0010-T01: labor-cost-anchored calculator formula
Maintainer (Bernd) accepted 2026-07-30: estimated_effort_days/daily_rate driven directly by commit-clustered human interaction time; approved_direct_costs from real metered AI token cost (get_token_summary); workplan/task-volume and file/line-size metrics serve only as a sanity check on the human-time estimate, never their own dollar figure; Target Multiple remains a human classification. Candidate B recorded as the considered, not-adopted alternative.
This commit is contained in:
parent
5e0f39bbc8
commit
660761fc71
3 changed files with 21 additions and 7 deletions
|
|
@ -152,11 +152,13 @@ Candidate A might undervalue it), but introduces a second calibration
|
|||
constant ($-per-complexity-unit) with even less grounding than
|
||||
`daily_rate` has.
|
||||
|
||||
**This document does not choose between A and B** — that is exactly the
|
||||
kind of working default a future task (see workplan T02) should propose
|
||||
and a maintainer should confirm, the same way
|
||||
`specs/TargetDegenerationPolicyResearch.md` handled the degeneration
|
||||
formula fork.
|
||||
**Adopted 2026-07-30** (`workplans/TREV-WP-0010-development-effort-calculator.md`
|
||||
T01, maintainer-accepted): **Candidate A is the confirmed v0 formula.**
|
||||
Candidate B remains recorded here as the considered alternative, not
|
||||
adopted — revisit only if Candidate A's labor-cost anchor proves
|
||||
systematically wrong once real repos produce real data, the same
|
||||
provisional-but-decided treatment `specs/TargetDegenerationPolicyResearch.md`
|
||||
gave the degeneration formula fork.
|
||||
|
||||
## 4. Target Multiple classification (the Nx factor)
|
||||
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue