Maintainer (Bernd) accepted 2026-07-30: four rights tiers
(Viewer/Contributor/Operator/Admin) confirmed as proposed. Selected
option (a) - per-human sub-credentials at the Trust Service layer -
over this concept's own recommended option (b), meaning the Trust
Service's signed ledger records can attest to the specific human who
acted, not merely the binky tenant.
This adds a real, firm prerequisite the workplan didn't have before:
extending WP-0006's already-finished licensors/token auth model.
Restructured T02 (was: backend+audit) into T02 (WP-0006 auth
extension, new) + T03 (Control Plane backend, renumbered) + T04
(interactive UI, renumbered) to keep that scope visible as its own
task rather than folding it silently into backend work.
The two deliverables have independent formula/rights decisions and
implementation arcs; keeping them in one workplan blurred that they
can be reviewed and sequenced separately, even though the Control
Plane's Phase-registration flow is expected to consume the
Calculator's output once both exist.
WP-0009 (Target Revenue Control Plane): keeps the original workstream
ID, retitled and re-tasked to 3 focused tasks - rights-model decision
(human gate), backend auth/audit layer, interactive UI flows.
WP-0010 (Development Effort Calculator, new): 3 tasks - formula
decision (human gate), implementation, application to the real
candidate repos already identified in WP-0008. No real Phase
declaration in either workplan's scope.
Updated both concept documents' workplan cross-references and
README.md's summary table accordingly.