Adds since/until date-range scoping to cluster_commit_hours() and
workplan_task_counts() (threaded through calculate_target_basis()),
needed whenever a candidate is one bounded workplan within a repo
whose overall history spans much more (net-kingdom, railiance-apps)
rather than the whole repo being the candidate (vergabe-teilnahme,
info-tech-canon).
Fixes a real bug found along the way: workplan_task_counts() only
scanned the top level of workplans/, missing net-kingdom's
workplans/archived/ convention entirely - silently reported zero
finished workplans for NK-WP-0002, which lives there. Fixed to scan
recursively; added a regression test.
Updates all three draft pilot-candidate manifests with calculator-
derived target_basis/initial_target values, replacing the hand-picked
placeholders:
net-kingdom-local-identity: 200,000 -> 10,000 EUR (floor + sanity warnings)
railiance-vergabe-teilnahme: 3,500,000 -> 648,800 EUR (no warnings)
info-tech-canon-service-surface: 2,500,000 -> 141,800 EUR (sanity warning)
history/260730-EffortCalculator-CandidateApplication.md records full
derivation, warnings, and the judgment calls made explicit rather than
silently picked (date-scoping windows; measuring vergabe-teilnahme's
own repo rather than railiance-apps' deployment-only wiring, with both
figures shown). Still draft/non-binding - WP-0008-T05 unaffected.
5 new tests (20 -> now covering since/until scoping and the
archived-subdirectory fix). Full suite: 84 passing offline.
src/target_revenue/effort_calculator.py implements Candidate A
(labor-cost-anchored, accepted T01): commit-timestamp session-gap
clustering for human interaction time, workplan/task-volume counts via
direct workplans/ directory parsing (no state-hub dependency, works
uniformly on any repo using this repo's own convention), file/line
counts with generated/vendored-path exclusion, and caller-supplied
token-cost pricing. estimate_target_basis() combines these and returns
a derivation dict (every input shown) plus a warnings list - never a
black-box dollar figure.
1-day manual-work floor, as requested: any raw commit-clustered
estimate below 1.0 day is floored and flagged with a warning that this
is very likely a measurement gap (commit-clustering is a floor
estimate by design) that should usually be compensated for by manual
override, not trusted at face value. A second, independent
sanity-check warning fires when finished-workplan/task volume is
substantial but the time estimate is still low, even above the floor -
demonstrated live against target-revenue's own history (7 finished
workplans, 57 tasks correctly flagged a 2.38-day estimate as
under-counted).
scripts/effort_calculator_cli.py: CLI wrapper printing JSON, following
the same offline-first, no-Phase-declaration pattern as
scripts/trf_onboard.py. tests/test_effort_calculator.py (15
deterministic tests, throwaway git repos/tmp_path fixtures) covers
commit clustering, workplan/task parsing, size-metric exclusion,
token-cost pricing, the floor-and-warning behavior, the sanity-check
warning, and an end-to-end smoke test. No new hard dependency.