Updated by fix-consistency on 2026-08-05: - update .custodian-brief.md for target-revenue
101 lines
7.2 KiB
Markdown
101 lines
7.2 KiB
Markdown
# Target Revenue Framework — SCOPE
|
||
|
||
**Status:** Living document for Stage 0
|
||
**Authority:** Describes what is actually in design or delivery *now*.
|
||
**Counterpart:** [`INTENT.md`](INTENT.md) is stable and aspirational. A gap between INTENT and this file is expected and is a maturity signal, not a defect.
|
||
|
||
**Last updated:** 2026-08-05
|
||
**Basis:** SWOT recommendations in `history/260728-SWOT-Assessment.md`; first real Phase declared 2026-08-05 under WP-0008-T05 (`history/260805-T05-GoLive-info-tech-canon.md`).
|
||
|
||
---
|
||
|
||
## 1. Current maturity
|
||
|
||
| Label | Meaning |
|
||
| --- | --- |
|
||
| **Stage 0 — finished** | Concept consolidated (WP-0003); Stage 0 schema/fold foundation finished (WP-0002); TRSL/CUA V1C1 accepted 2026-07-29 as counsel-briefing material (WP-0001) — not yet production legal text. |
|
||
| **Stage 1 — pilot** | First real Phase declared 2026-08-05: `trsl:phase:info-tech-canon-service-surface` on `coulomb/info-tech-canon` (`history/260805-T05-GoLive-info-tech-canon.md`). Hosted Trust Service software finished (WP-0006); public reef deploy still WP-0011. |
|
||
| Trust Service federation | Stages 1–6 from concept §15 are **out of current delivery scope** (design readiness only) — unrelated to this document's "Stage 0/1" labels, which track this repo's own maturity, not the Trust Service's federation roadmap. |
|
||
| Legal TRSL/CUA | Accepted as counsel-briefing material, still **not production legal text**. Pilot Phases operate under the alpha/beta legal-review deferral with an **explicit pilot scope** recorded at T05 (`history/260805-T05-GoLive-info-tech-canon.md` §1). |
|
||
| Alpha/beta legal-review deferral | **Maintainer decision, 2026-07-29**: full specialist legal review of the TRSL/CUA is postponed until out of beta. **T05 (2026-08-05)** confirmed this waiver covers the first pilot Phase only (info-tech-canon service surface), under the jurisdiction/Enforcement Network alpha/beta working defaults — not all product lines forever. |
|
||
| Org-wide license adoption | **Maintainer decision, 2026-07-30**: TRSL V1C1 as preliminary `LICENSE` across the `coulomb` Forgejo org (`history/260730-TRSL-OrgWideLicenseRollout.md`). Distinct from Phase declaration. |
|
||
| First Phase declaration | **Maintainer decision, 2026-08-05**: WP-0008-T05 accepted; first Phase is `trsl:phase:info-tech-canon-service-surface`. |
|
||
|
||
---
|
||
|
||
## 2. In scope now
|
||
|
||
### Documentation and specification
|
||
|
||
- Maintain INTENT, this SCOPE, concept, PRD, TSD, and working defaults.
|
||
- Extract normative core artifacts (PRD Roadmap Phase 1):
|
||
- `specs/TargetRevenueFrameworkCore.md`
|
||
- `specs/PhaseManifestSpecification.md`
|
||
- `specs/TargetLedgerSpecification.md`
|
||
- Prior-art research (archived under `history/260729-TRSL-*.md`) and non-binding `TargetRevenueSourceLicense-V1C1.md` and `TargetRevenueCommercialUseAgreement-V1C1.md` candidates (WP-0001).
|
||
- Provisional answers to conversion-critical open questions (`specs/OpenQuestions-WorkingDefaults.md`).
|
||
- Degeneration policy research artifact (recommended default for Stage 0 pilots).
|
||
- Canonical monetization profiles as documentation (defaults + examples).
|
||
- Lightweight contributor policy (`CONTRIBUTING.md`).
|
||
|
||
### Runnable specification foundation (not a hosted service)
|
||
|
||
- Machine-readable schemas for Phase Manifest, Ledger Entry, Extension Contract, Conversion Attestation.
|
||
- Pure, deterministic Outstanding Target fold and offline conformance validators.
|
||
- Golden Phase package under `examples/` (concept §23 numbers).
|
||
- Optional thin library/CLI for `validate` / `fold` — **no** requirement for multi-tenant hosting, auth productization, or federation protocol.
|
||
|
||
### Work system
|
||
|
||
- Hub-linked workplans, progress events, and consistency sync for this repo.
|
||
|
||
---
|
||
|
||
## 3. Explicitly out of scope now
|
||
|
||
| Item | Status |
|
||
| --- | --- |
|
||
| Hosted Trust Service *implementation* | **In scope now** — `workplans/TREV-WP-0006-trust-service-implementation.md`, active |
|
||
| Hosted Trust Service *accepting pilot Phase data* | **In scope now** for the T05 pilot Phase (local pilot instance; public reef still WP-0011) |
|
||
| Finalized legal license text and commercial agreements | TRSL/CUA V1C1 still preliminary; pilot operates under alpha/beta waiver + T05 scope record |
|
||
| Final degeneration formula as irreversible norm | v1 norm `linear-longstop-v0` adopted (WP-0007); automation implemented (WP-0013) |
|
||
| Federation Stage 2+ (replication, multi-operator, multi-authority) | PRD Roadmap Phase 6 — still deferred |
|
||
| Governance formalization *document* | Done — `specs/TRSL-Governance.md` (WP-0008-T01) |
|
||
| Tax / statutory revenue recognition | Permanently out of framework core (INTENT boundaries) |
|
||
| Additional product-line Phase declarations beyond the first pilot | **Not auto-authorized** — each further Phase is a deliberate declaration act; T05 named only `info-tech-canon` |
|
||
| Accepting external code into a governed Milestone Release | Until CLA is accepted — draft exists (WP-0008-T04); block remains in `CONTRIBUTING.md` |
|
||
|
||
---
|
||
|
||
## 4. Sequencing rules (binding for workplans)
|
||
|
||
These rules implement SWOT I-05 / I-06 and the PRD roadmap order:
|
||
|
||
1. **Normative extraction (WP-0003) and prior-art research (WP-0001)** proceed in parallel with **schema + pure fold + golden fixture (WP-0002)**.
|
||
2. **Full Trust Service implementation** (Phase Registry service, hosted append API, Metrics product, multi-user operation) **must not** start until:
|
||
- WP-0003 core extract deliverables exist (or are explicitly waived by human decision), and
|
||
- Working defaults for Longstop, currency, recognition, and minimum evidence are published.
|
||
3. **Human accept gates** (recorded in the workplan or a decision note) are required before treating as done:
|
||
- WP-0001-T06 TRSL draft skeleton (legal-sensitive),
|
||
- WP-0002 stack/library ADR (if technology is locked),
|
||
- Any promotion of working defaults into normative core language.
|
||
4. New monetization ideas land as **profiles/extensions**, not core terms, unless they pass the complexity budget (universal / interoperable / trust-critical).
|
||
5. **Real Phase declaration** (a repo's actual License header changed to TRSL, a real Commercial Entitlement sold, real Development Credit tracked) **must not** occur until `workplans/TREV-WP-0008-governance-and-pilot-rollout.md` T05 is explicitly accepted. WP-0006/0007/0008's other tasks (Trust Service implementation, degeneration/profile finalization, governance drafting, draft/non-binding pilot Phase Manifests) may proceed in parallel and do not themselves authorize going live.
|
||
|
||
---
|
||
|
||
## 5. Stage 0 “done enough” signal
|
||
|
||
Stage 0 package is acceptable when:
|
||
|
||
1. A newcomer can explain the five-verb lifecycle from README + core doc alone.
|
||
2. Offline tools validate a golden Phase and recompute Outstanding Target to zero with no network service.
|
||
3. Open questions have provisional defaults or explicit “blocked on legal/research” labels.
|
||
4. WP-0001 research artifact exists; legal draft is marked non-binding and not used in production.
|
||
5. This SCOPE honestly states what is not yet claimed.
|
||
|
||
---
|
||
|
||
## 6. Change policy
|
||
|
||
Update this file when Stage 0 boundaries change (e.g. first hosted Trust Service pilot authorized, first legal review complete). Do **not** weaken INTENT to match short-term delivery; expand SCOPE when INTENT milestones become active work.
|