Target Revenue Framework — SCOPE
Status: Living document for Stage 0
Authority: Describes what is actually in design or delivery now.
Counterpart: INTENT.md is stable and aspirational. A gap between INTENT and this file is expected and is a maturity signal, not a defect.
Last updated: 2026-07-28
Basis: SWOT recommendations in history/260728-SWOT-Assessment.md
1. Current maturity
| Label | Meaning |
|---|---|
| Stage 0 | Concept consolidated; product/tech orientation specs exist; no production legal text; no production Trust Service |
| Trust Service federation | Stages 1–6 from concept §15 are out of current delivery scope (design readiness only) |
| Legal TRSL | Research and non-binding draft skeleton only; specialist review required before any real Phase |
2. In scope now
Documentation and specification
- Maintain INTENT, this SCOPE, concept, PRD, TSD, and working defaults.
- Extract normative core artifacts (PRD Roadmap Phase 1):
specs/TargetRevenueFrameworkCore.mdspecs/PhaseManifestSpecification.mdspecs/TargetLedgerSpecification.md
- Prior-art research and non-binding
TargetRevenueSourceLicense-Draft.mdskeleton (WP-0001). - Provisional answers to conversion-critical open questions (
specs/OpenQuestions-WorkingDefaults.md). - Degeneration policy research artifact (recommended default for Stage 0 pilots).
- Canonical monetization profiles as documentation (defaults + examples).
- Lightweight contributor policy (
CONTRIBUTING.md).
Runnable specification foundation (not a hosted service)
- Machine-readable schemas for Phase Manifest, Ledger Entry, Extension Contract, Conversion Attestation.
- Pure, deterministic Outstanding Target fold and offline conformance validators.
- Golden Phase package under
examples/(concept §23 numbers). - Optional thin library/CLI for
validate/fold— no requirement for multi-tenant hosting, auth productization, or federation protocol.
Work system
- Hub-linked workplans, progress events, and consistency sync for this repo.
3. Explicitly out of scope now
| Item | Deferred to |
|---|---|
| Production Trust Service (registries, hosted ledger API, metrics product) | After Phase 1 normative docs + schema foundation; dedicated Trust Service PRD |
| Finalized legal license text and commercial agreements | Specialist legal review post draft skeleton |
| Final degeneration formula as irreversible norm | Research + pilot learning |
| Federation Stage 2+ (replication, multi-operator, multi-authority) | PRD Roadmap Phase 6 |
| Multi-stakeholder governance institutions | PRD Roadmap Phase 7 (lightweight draft only if needed) |
| Tax / statutory revenue recognition | Permanently out of framework core (INTENT boundaries) |
| Governing third-party product Phases in production | After legal + Stage 0 package ready |
| Accepting external code into a governed Milestone Release | Until contributor-rights instrument exists |
4. Sequencing rules (binding for workplans)
These rules implement SWOT I-05 / I-06 and the PRD roadmap order:
- Normative extraction (WP-0003) and prior-art research (WP-0001) proceed in parallel with schema + pure fold + golden fixture (WP-0002).
- Full Trust Service implementation (Phase Registry service, hosted append API, Metrics product, multi-user operation) must not start until:
- WP-0003 core extract deliverables exist (or are explicitly waived by human decision), and
- Working defaults for Longstop, currency, recognition, and minimum evidence are published.
- Human accept gates (recorded in the workplan or a decision note) are required before treating as done:
- WP-0001-T06 TRSL draft skeleton (legal-sensitive),
- WP-0002 stack/library ADR (if technology is locked),
- Any promotion of working defaults into normative core language.
- New monetization ideas land as profiles/extensions, not core terms, unless they pass the complexity budget (universal / interoperable / trust-critical).
5. Stage 0 “done enough” signal
Stage 0 package is acceptable when:
- A newcomer can explain the five-verb lifecycle from README + core doc alone.
- Offline tools validate a golden Phase and recompute Outstanding Target to zero with no network service.
- Open questions have provisional defaults or explicit “blocked on legal/research” labels.
- WP-0001 research artifact exists; legal draft is marked non-binding and not used in production.
- This SCOPE honestly states what is not yet claimed.
6. Change policy
Update this file when Stage 0 boundaries change (e.g. first hosted Trust Service pilot authorized, first legal review complete). Do not weaken INTENT to match short-term delivery; expand SCOPE when INTENT milestones become active work.