target-revenue/SCOPE.md
tegwick 4496244bb8 Adapt specs and workplans to SWOT Stage 0 sequencing
Introduce SCOPE, expanded README, CONTRIBUTING, and provisional open-question
defaults. Rescope Trust Service work to offline schemas/fold/fixtures, add
normative core extraction workplan, and split PRD roadmap Phase 4 into
foundation vs hosted service. Sync workplans with State Hub.
2026-07-28 18:34:10 +02:00

4.8 KiB
Raw Blame History

Target Revenue Framework — SCOPE

Status: Living document for Stage 0
Authority: Describes what is actually in design or delivery now.
Counterpart: INTENT.md is stable and aspirational. A gap between INTENT and this file is expected and is a maturity signal, not a defect.

Last updated: 2026-07-28
Basis: SWOT recommendations in history/260728-SWOT-Assessment.md


1. Current maturity

Label Meaning
Stage 0 Concept consolidated; product/tech orientation specs exist; no production legal text; no production Trust Service
Trust Service federation Stages 16 from concept §15 are out of current delivery scope (design readiness only)
Legal TRSL Research and non-binding draft skeleton only; specialist review required before any real Phase

2. In scope now

Documentation and specification

  • Maintain INTENT, this SCOPE, concept, PRD, TSD, and working defaults.
  • Extract normative core artifacts (PRD Roadmap Phase 1):
    • specs/TargetRevenueFrameworkCore.md
    • specs/PhaseManifestSpecification.md
    • specs/TargetLedgerSpecification.md
  • Prior-art research and non-binding TargetRevenueSourceLicense-Draft.md skeleton (WP-0001).
  • Provisional answers to conversion-critical open questions (specs/OpenQuestions-WorkingDefaults.md).
  • Degeneration policy research artifact (recommended default for Stage 0 pilots).
  • Canonical monetization profiles as documentation (defaults + examples).
  • Lightweight contributor policy (CONTRIBUTING.md).

Runnable specification foundation (not a hosted service)

  • Machine-readable schemas for Phase Manifest, Ledger Entry, Extension Contract, Conversion Attestation.
  • Pure, deterministic Outstanding Target fold and offline conformance validators.
  • Golden Phase package under examples/ (concept §23 numbers).
  • Optional thin library/CLI for validate / foldno requirement for multi-tenant hosting, auth productization, or federation protocol.

Work system

  • Hub-linked workplans, progress events, and consistency sync for this repo.

3. Explicitly out of scope now

Item Deferred to
Production Trust Service (registries, hosted ledger API, metrics product) After Phase 1 normative docs + schema foundation; dedicated Trust Service PRD
Finalized legal license text and commercial agreements Specialist legal review post draft skeleton
Final degeneration formula as irreversible norm Research + pilot learning
Federation Stage 2+ (replication, multi-operator, multi-authority) PRD Roadmap Phase 6
Multi-stakeholder governance institutions PRD Roadmap Phase 7 (lightweight draft only if needed)
Tax / statutory revenue recognition Permanently out of framework core (INTENT boundaries)
Governing third-party product Phases in production After legal + Stage 0 package ready
Accepting external code into a governed Milestone Release Until contributor-rights instrument exists

4. Sequencing rules (binding for workplans)

These rules implement SWOT I-05 / I-06 and the PRD roadmap order:

  1. Normative extraction (WP-0003) and prior-art research (WP-0001) proceed in parallel with schema + pure fold + golden fixture (WP-0002).
  2. Full Trust Service implementation (Phase Registry service, hosted append API, Metrics product, multi-user operation) must not start until:
    • WP-0003 core extract deliverables exist (or are explicitly waived by human decision), and
    • Working defaults for Longstop, currency, recognition, and minimum evidence are published.
  3. Human accept gates (recorded in the workplan or a decision note) are required before treating as done:
    • WP-0001-T06 TRSL draft skeleton (legal-sensitive),
    • WP-0002 stack/library ADR (if technology is locked),
    • Any promotion of working defaults into normative core language.
  4. New monetization ideas land as profiles/extensions, not core terms, unless they pass the complexity budget (universal / interoperable / trust-critical).

5. Stage 0 “done enough” signal

Stage 0 package is acceptable when:

  1. A newcomer can explain the five-verb lifecycle from README + core doc alone.
  2. Offline tools validate a golden Phase and recompute Outstanding Target to zero with no network service.
  3. Open questions have provisional defaults or explicit “blocked on legal/research” labels.
  4. WP-0001 research artifact exists; legal draft is marked non-binding and not used in production.
  5. This SCOPE honestly states what is not yet claimed.

6. Change policy

Update this file when Stage 0 boundaries change (e.g. first hosted Trust Service pilot authorized, first legal review complete). Do not weaken INTENT to match short-term delivery; expand SCOPE when INTENT milestones become active work.