Accept WP-0008-T05 for trsl:phase:info-tech-canon-service-surface (history/260805-T05-GoLive-info-tech-canon.md). Finish WP-0013 remission automation and WP-0014 extension/breach/attestation Control Plane UI. Update SCOPE, README, and pilot-candidate notes for pilot Stage 1.
52 lines
2 KiB
Markdown
52 lines
2 KiB
Markdown
---
|
||
policy_id: trsl:policy:linear-longstop-v0@1.0
|
||
title: Linear Longstop v0
|
||
---
|
||
|
||
# Linear Longstop v0
|
||
|
||
Adopted 2026-07-29
|
||
(`workplans/TREV-WP-0007-degeneration-policy-and-canonical-profiles.md`
|
||
T02, maintainer-accepted): confirmed as the v1 norm for the first pilot
|
||
cohort, not merely a Stage 0 pilot placeholder.
|
||
|
||
## Definition
|
||
|
||
- Remission accrues **only** by time toward a declared **Longstop Date**
|
||
(`specs/OpenQuestions-WorkingDefaults.md` Q8).
|
||
- Between Phase activation `t0` and Longstop `tL`,
|
||
|
||
R(t) = T0 × clamp((t − t0)/(tL − t0), 0, 1)
|
||
|
||
with discrete ledger `remission-credit` entries computed on a published
|
||
schedule (e.g. daily or monthly UTC), **or** a single full remission at
|
||
longstop for minimal implementations.
|
||
- Development Credit does not change the remission schedule in v0 (no
|
||
progress-sensitive boost/pause).
|
||
|
||
## Status
|
||
|
||
Automated as of WP-0013 (`src/target_revenue/remission.py`):
|
||
|
||
- Pure cumulative formula: `cumulative_remission(T0, t0, tL, as_of)`.
|
||
- Hosted apply writes the delta
|
||
`max(0, R(as_of) − Σ policy remission-credit already on the ledger)`.
|
||
- **t0** = Trust Service `phase_manifests.registered_at` (no separate
|
||
`activated_at` manifest field in Stage 0).
|
||
- **Cadence**: monthly UTC (1st 00:00) for scheduled batch
|
||
(`POST /remission/run`); on-demand via
|
||
`POST /phases/{id}/remission` or Control Plane "Apply policy remission now".
|
||
- **Actor**: Licensor credential labeled `system:policy-engine`
|
||
(not a human token).
|
||
- Re-runs at the same `as_of` are no-ops (idempotent by cumulative delta).
|
||
|
||
## Superseded / next iteration
|
||
|
||
`specs/TargetDegenerationPolicyResearch.md` (T01) proposes a candidate
|
||
`trsl:policy:progress-paused-longstop-v1` (a 90-day rolling "quiet
|
||
period" pause on Remission Credit during active Development Credit
|
||
periods), research complete but **not adopted**. Explicitly recommends
|
||
*not* adopting a diversity-of-payers factor (no gaming-resistant signal
|
||
exists yet). Named as the next iteration, to be revisited once real
|
||
pilot Development Credit data exists — not required before pilot Phases
|
||
proceed under v0.
|