target-revenue/SCOPE.md
tegwick dd7f7d2181 Set up practical implementation workplans (WP-0006/0007/0008)
With WP-0001/0002/0003 finished, PRD Phase 4b (hosted Trust Service) is
unblocked per SCOPE.md's own sequencing rule, and the midterm goal shifts
from framework design to practical application: governing and monetizing
repos across the coulomb Forgejo org's product lines (coulomb-loop,
net-kingdom, helix-forge, the railiance-* family).

- TREV-WP-0006: Trust Service reference implementation (PRD Phase 4b).
  Eight tasks from PRD to conformance-tested hosted service, explicit that
  it builds infrastructure only - no real payments or Phase tracking.
- TREV-WP-0007: Degeneration policy finalization (PRD Phase 5) and the
  full canonical monetization profile catalog (remainder of Phase 3) -
  pilot Phases can't responsibly launch on the placeholder pilot policy
  and one-line profile defaults alone.
- TREV-WP-0008: Governance formalization (PRD Phase 7) and pilot rollout
  preparation. Forces a real design decision the framework never had to
  answer while single-repo-hypothetical: who is "the Licensor" across four
  independent product lines. Produces draft, non-binding Phase Manifests
  as worked examples for one repo per product line, and a CLA draft.

All three explicitly preserve SCOPE.md's existing "no production Phases
until legal review" guardrail rather than overriding it under pressure to
monetize real repos: WP-0008-T05 is a dedicated, human-gated go-live
decision, and no other task in any of the three workplans is permitted to
authorize a real Phase, real Commercial Entitlement sale, or real
Development Credit tracking.

Updates SCOPE.md (new Stage 0/Stage 1 maturity table, revised out-of-scope
table distinguishing "infrastructure in scope" from "going live still
gated"), PRD roadmap (Phase 4b/5/7 now active, pointing at the new
workplans), and README's active-work table accordingly.

Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
2026-07-29 20:27:29 +02:00

6.6 KiB
Raw Blame History

Target Revenue Framework — SCOPE

Status: Living document for Stage 0
Authority: Describes what is actually in design or delivery now.
Counterpart: INTENT.md is stable and aspirational. A gap between INTENT and this file is expected and is a maturity signal, not a defect.

Last updated: 2026-07-29
Basis: SWOT recommendations in history/260728-SWOT-Assessment.md; updated per §6's own trigger ("first hosted Trust Service pilot authorized") now that WP-0001/0002/0003 are finished and WP-0006/0007/0008 have started.


1. Current maturity

Label Meaning
Stage 0 — finished Concept consolidated (WP-0003); Stage 0 schema/fold foundation finished (WP-0002); TRSL/CUA V1C1 accepted 2026-07-29 as counsel-briefing material (WP-0001) — not yet production legal text.
Stage 1 — active Hosted Trust Service (WP-0006), degeneration/canonical-profile finalization (WP-0007), and governance + pilot rollout preparation (WP-0008) across the coulomb Forgejo org's product lines (coulomb-loop, net-kingdom, helix-forge, railiance-*).
Trust Service federation Stages 16 from concept §15 are out of current delivery scope (design readiness only) — unrelated to this document's "Stage 0/1" labels, which track this repo's own maturity, not the Trust Service's federation roadmap.
Legal TRSL/CUA Accepted as counsel-briefing material, still not production legal text — specialist legal review (License/CUA Appendix A condition 1) remains required before any real Phase; see workplans/TREV-WP-0008-governance-and-pilot-rollout.md T05.

2. In scope now

Documentation and specification

  • Maintain INTENT, this SCOPE, concept, PRD, TSD, and working defaults.
  • Extract normative core artifacts (PRD Roadmap Phase 1):
    • specs/TargetRevenueFrameworkCore.md
    • specs/PhaseManifestSpecification.md
    • specs/TargetLedgerSpecification.md
  • Prior-art research (archived under history/260729-TRSL-*.md) and non-binding TargetRevenueSourceLicense-V1C1.md and TargetRevenueCommercialUseAgreement-V1C1.md candidates (WP-0001).
  • Provisional answers to conversion-critical open questions (specs/OpenQuestions-WorkingDefaults.md).
  • Degeneration policy research artifact (recommended default for Stage 0 pilots).
  • Canonical monetization profiles as documentation (defaults + examples).
  • Lightweight contributor policy (CONTRIBUTING.md).

Runnable specification foundation (not a hosted service)

  • Machine-readable schemas for Phase Manifest, Ledger Entry, Extension Contract, Conversion Attestation.
  • Pure, deterministic Outstanding Target fold and offline conformance validators.
  • Golden Phase package under examples/ (concept §23 numbers).
  • Optional thin library/CLI for validate / foldno requirement for multi-tenant hosting, auth productization, or federation protocol.

Work system

  • Hub-linked workplans, progress events, and consistency sync for this repo.

3. Explicitly out of scope now

Item Status
Hosted Trust Service implementation In scope nowworkplans/TREV-WP-0006-trust-service-implementation.md, active
Hosted Trust Service accepting real production data Still out of scope until WP-0008-T05
Finalized legal license text and commercial agreements TRSL/CUA V1C1 accepted as counsel-briefing material (WP-0001); specialist legal review still outstanding
Final degeneration formula as irreversible norm In scope nowworkplans/TREV-WP-0007-degeneration-policy-and-canonical-profiles.md, active
Federation Stage 2+ (replication, multi-operator, multi-authority) PRD Roadmap Phase 6 — still deferred
Governance formalization document In scope nowworkplans/TREV-WP-0008-governance-and-pilot-rollout.md T01, active
Tax / statutory revenue recognition Permanently out of framework core (INTENT boundaries)
Governing third-party product Phases in production (real Phase declarations, real Commercial Entitlements sold) Still out of scope — gated behind workplans/TREV-WP-0008-governance-and-pilot-rollout.md T05 (legal review + Licensor governance decision)
Accepting external code into a governed Milestone Release Until contributor-rights instrument exists — draft in progress, workplans/TREV-WP-0008-governance-and-pilot-rollout.md T04

4. Sequencing rules (binding for workplans)

These rules implement SWOT I-05 / I-06 and the PRD roadmap order:

  1. Normative extraction (WP-0003) and prior-art research (WP-0001) proceed in parallel with schema + pure fold + golden fixture (WP-0002).
  2. Full Trust Service implementation (Phase Registry service, hosted append API, Metrics product, multi-user operation) must not start until:
    • WP-0003 core extract deliverables exist (or are explicitly waived by human decision), and
    • Working defaults for Longstop, currency, recognition, and minimum evidence are published.
  3. Human accept gates (recorded in the workplan or a decision note) are required before treating as done:
    • WP-0001-T06 TRSL draft skeleton (legal-sensitive),
    • WP-0002 stack/library ADR (if technology is locked),
    • Any promotion of working defaults into normative core language.
  4. New monetization ideas land as profiles/extensions, not core terms, unless they pass the complexity budget (universal / interoperable / trust-critical).
  5. Real Phase declaration (a repo's actual License header changed to TRSL, a real Commercial Entitlement sold, real Development Credit tracked) must not occur until workplans/TREV-WP-0008-governance-and-pilot-rollout.md T05 is explicitly accepted. WP-0006/0007/0008's other tasks (Trust Service implementation, degeneration/profile finalization, governance drafting, draft/non-binding pilot Phase Manifests) may proceed in parallel and do not themselves authorize going live.

5. Stage 0 “done enough” signal

Stage 0 package is acceptable when:

  1. A newcomer can explain the five-verb lifecycle from README + core doc alone.
  2. Offline tools validate a golden Phase and recompute Outstanding Target to zero with no network service.
  3. Open questions have provisional defaults or explicit “blocked on legal/research” labels.
  4. WP-0001 research artifact exists; legal draft is marked non-binding and not used in production.
  5. This SCOPE honestly states what is not yet claimed.

6. Change policy

Update this file when Stage 0 boundaries change (e.g. first hosted Trust Service pilot authorized, first legal review complete). Do not weaken INTENT to match short-term delivery; expand SCOPE when INTENT milestones become active work.