Maintainer decision, 2026-07-29/30: adopts TRSL V1C1 as the preliminary governing LICENSE across every repo in the coulomb Forgejo org, confirmed explicitly as "every repo, no exceptions" including target-revenue itself and internal tooling repos. This is a license-text adoption, not a Phase declaration - no Initial Target, Trust Service registration, or Development Credit tracking exists for any repo as a result. WP-0008-T05 (real Phase go-live) remains todo and unaccepted. Applies TRSL to this repo's own LICENSE (self-referential wording, since target-revenue is the canonical source) and updates pyproject.toml's license field from MIT-0 to TRSL-0.1. history/260730-TRSL-OrgWideLicenseRollout.md is the full execution record: ~90 repos adopted successfully, 2 committed locally only (no git remote configured: executor-sandbox, executor-worker), and one explicitly flagged exception (the-custodian - carried a pre-existing proprietary/confidential license, deliberately not touched pending separate confirmation, not silently folded into the blanket instruction). scripts/rollout/LICENSE.trsl-v1c1 is the deployed template used across all repos (operative legal text only, points back to this repo's specs/TargetRevenueSourceLicense-V1C1.md for the full candidate-status banner and Appendix A rather than duplicating it ~90 times).
8.3 KiB
Target Revenue Framework — SCOPE
Status: Living document for Stage 0
Authority: Describes what is actually in design or delivery now.
Counterpart: INTENT.md is stable and aspirational. A gap between INTENT and this file is expected and is a maturity signal, not a defect.
Last updated: 2026-07-29
Basis: SWOT recommendations in history/260728-SWOT-Assessment.md; updated per §6's own trigger ("first hosted Trust Service pilot authorized") now that WP-0001/0002/0003 are finished and WP-0006/0007/0008 have started.
1. Current maturity
| Label | Meaning |
|---|---|
| Stage 0 — finished | Concept consolidated (WP-0003); Stage 0 schema/fold foundation finished (WP-0002); TRSL/CUA V1C1 accepted 2026-07-29 as counsel-briefing material (WP-0001) — not yet production legal text. |
| Stage 1 — active | Hosted Trust Service (WP-0006), degeneration/canonical-profile finalization (WP-0007), and governance + pilot rollout preparation (WP-0008) across the coulomb Forgejo org's product lines (coulomb-loop, net-kingdom, helix-forge, railiance-*). |
| Trust Service federation | Stages 1–6 from concept §15 are out of current delivery scope (design readiness only) — unrelated to this document's "Stage 0/1" labels, which track this repo's own maturity, not the Trust Service's federation roadmap. |
| Legal TRSL/CUA | Accepted as counsel-briefing material, still not production legal text — specialist legal review (License/CUA Appendix A condition 1) remains required before any real Phase; see workplans/TREV-WP-0008-governance-and-pilot-rollout.md T05. |
| Alpha/beta legal-review deferral | Maintainer decision, 2026-07-29: full specialist legal review of the TRSL/CUA (condition 1 above) is explicitly postponed until the framework moves out of beta, since legal and commercial exposure during build/alpha is limited and the License/CUA will be revised on stakeholder/customer feedback before the legal framework settles. This closed workplans/TREV-WP-0004-global-jurisdiction-research.md and workplans/TREV-WP-0005-enforcement-network-research.md with a synthesis of alpha/beta working defaults (governing law/arbitration, liability cap, data protection, Enforcement Network fee mechanics) rather than full resolution — see history/260729-TRSL-Jurisdiction-Synthesis.md §3 and history/260729-TREN-Synthesis.md for exactly what is and is not covered by this deferral. It does not waive WP-0008-T05's other preconditions (Licensor identity, hosted Trust Service), and it does not mean the legal framework is finished — only that it is judged sufficient to operate pilot-stage Phases under bounded, known risk. |
| Org-wide license adoption | Maintainer decision, 2026-07-30: TRSL V1C1 adopted as the preliminary LICENSE across every repo in the coulomb Forgejo org (see history/260730-TRSL-OrgWideLicenseRollout.md) — one flagged exception (the-custodian, pre-existing proprietary/confidential license, not touched pending separate confirmation). This is a license-text adoption, not a Phase declaration — no Initial Target, Trust Service registration, or Development Credit tracking exists for any repo as a result; workplans/TREV-WP-0008-governance-and-pilot-rollout.md T05 remains unaccepted. |
2. In scope now
Documentation and specification
- Maintain INTENT, this SCOPE, concept, PRD, TSD, and working defaults.
- Extract normative core artifacts (PRD Roadmap Phase 1):
specs/TargetRevenueFrameworkCore.mdspecs/PhaseManifestSpecification.mdspecs/TargetLedgerSpecification.md
- Prior-art research (archived under
history/260729-TRSL-*.md) and non-bindingTargetRevenueSourceLicense-V1C1.mdandTargetRevenueCommercialUseAgreement-V1C1.mdcandidates (WP-0001). - Provisional answers to conversion-critical open questions (
specs/OpenQuestions-WorkingDefaults.md). - Degeneration policy research artifact (recommended default for Stage 0 pilots).
- Canonical monetization profiles as documentation (defaults + examples).
- Lightweight contributor policy (
CONTRIBUTING.md).
Runnable specification foundation (not a hosted service)
- Machine-readable schemas for Phase Manifest, Ledger Entry, Extension Contract, Conversion Attestation.
- Pure, deterministic Outstanding Target fold and offline conformance validators.
- Golden Phase package under
examples/(concept §23 numbers). - Optional thin library/CLI for
validate/fold— no requirement for multi-tenant hosting, auth productization, or federation protocol.
Work system
- Hub-linked workplans, progress events, and consistency sync for this repo.
3. Explicitly out of scope now
| Item | Status |
|---|---|
| Hosted Trust Service implementation | In scope now — workplans/TREV-WP-0006-trust-service-implementation.md, active |
| Hosted Trust Service accepting real production data | Still out of scope until WP-0008-T05 |
| Finalized legal license text and commercial agreements | TRSL/CUA V1C1 accepted as counsel-briefing material (WP-0001); specialist legal review still outstanding |
| Final degeneration formula as irreversible norm | In scope now — workplans/TREV-WP-0007-degeneration-policy-and-canonical-profiles.md, active |
| Federation Stage 2+ (replication, multi-operator, multi-authority) | PRD Roadmap Phase 6 — still deferred |
| Governance formalization document | In scope now — workplans/TREV-WP-0008-governance-and-pilot-rollout.md T01, active |
| Tax / statutory revenue recognition | Permanently out of framework core (INTENT boundaries) |
| Governing third-party product Phases in production (real Phase declarations, real Commercial Entitlements sold) | Still out of scope — gated behind workplans/TREV-WP-0008-governance-and-pilot-rollout.md T05 (legal review + Licensor governance decision) |
| Accepting external code into a governed Milestone Release | Until contributor-rights instrument exists — draft in progress, workplans/TREV-WP-0008-governance-and-pilot-rollout.md T04 |
4. Sequencing rules (binding for workplans)
These rules implement SWOT I-05 / I-06 and the PRD roadmap order:
- Normative extraction (WP-0003) and prior-art research (WP-0001) proceed in parallel with schema + pure fold + golden fixture (WP-0002).
- Full Trust Service implementation (Phase Registry service, hosted append API, Metrics product, multi-user operation) must not start until:
- WP-0003 core extract deliverables exist (or are explicitly waived by human decision), and
- Working defaults for Longstop, currency, recognition, and minimum evidence are published.
- Human accept gates (recorded in the workplan or a decision note) are required before treating as done:
- WP-0001-T06 TRSL draft skeleton (legal-sensitive),
- WP-0002 stack/library ADR (if technology is locked),
- Any promotion of working defaults into normative core language.
- New monetization ideas land as profiles/extensions, not core terms, unless they pass the complexity budget (universal / interoperable / trust-critical).
- Real Phase declaration (a repo's actual License header changed to TRSL, a real Commercial Entitlement sold, real Development Credit tracked) must not occur until
workplans/TREV-WP-0008-governance-and-pilot-rollout.mdT05 is explicitly accepted. WP-0006/0007/0008's other tasks (Trust Service implementation, degeneration/profile finalization, governance drafting, draft/non-binding pilot Phase Manifests) may proceed in parallel and do not themselves authorize going live.
5. Stage 0 “done enough” signal
Stage 0 package is acceptable when:
- A newcomer can explain the five-verb lifecycle from README + core doc alone.
- Offline tools validate a golden Phase and recompute Outstanding Target to zero with no network service.
- Open questions have provisional defaults or explicit “blocked on legal/research” labels.
- WP-0001 research artifact exists; legal draft is marked non-binding and not used in production.
- This SCOPE honestly states what is not yet claimed.
6. Change policy
Update this file when Stage 0 boundaries change (e.g. first hosted Trust Service pilot authorized, first legal review complete). Do not weaken INTENT to match short-term delivery; expand SCOPE when INTENT milestones become active work.