Updated by fix-consistency on 2026-08-05: - update .custodian-brief.md for target-revenue
7.2 KiB
Target Revenue Framework — SCOPE
Status: Living document for Stage 0
Authority: Describes what is actually in design or delivery now.
Counterpart: INTENT.md is stable and aspirational. A gap between INTENT and this file is expected and is a maturity signal, not a defect.
Last updated: 2026-08-05
Basis: SWOT recommendations in history/260728-SWOT-Assessment.md; first real Phase declared 2026-08-05 under WP-0008-T05 (history/260805-T05-GoLive-info-tech-canon.md).
1. Current maturity
| Label | Meaning |
|---|---|
| Stage 0 — finished | Concept consolidated (WP-0003); Stage 0 schema/fold foundation finished (WP-0002); TRSL/CUA V1C1 accepted 2026-07-29 as counsel-briefing material (WP-0001) — not yet production legal text. |
| Stage 1 — pilot | First real Phase declared 2026-08-05: trsl:phase:info-tech-canon-service-surface on coulomb/info-tech-canon (history/260805-T05-GoLive-info-tech-canon.md). Hosted Trust Service software finished (WP-0006); public reef deploy still WP-0011. |
| Trust Service federation | Stages 1–6 from concept §15 are out of current delivery scope (design readiness only) — unrelated to this document's "Stage 0/1" labels, which track this repo's own maturity, not the Trust Service's federation roadmap. |
| Legal TRSL/CUA | Accepted as counsel-briefing material, still not production legal text. Pilot Phases operate under the alpha/beta legal-review deferral with an explicit pilot scope recorded at T05 (history/260805-T05-GoLive-info-tech-canon.md §1). |
| Alpha/beta legal-review deferral | Maintainer decision, 2026-07-29: full specialist legal review of the TRSL/CUA is postponed until out of beta. T05 (2026-08-05) confirmed this waiver covers the first pilot Phase only (info-tech-canon service surface), under the jurisdiction/Enforcement Network alpha/beta working defaults — not all product lines forever. |
| Org-wide license adoption | Maintainer decision, 2026-07-30: TRSL V1C1 as preliminary LICENSE across the coulomb Forgejo org (history/260730-TRSL-OrgWideLicenseRollout.md). Distinct from Phase declaration. |
| First Phase declaration | Maintainer decision, 2026-08-05: WP-0008-T05 accepted; first Phase is trsl:phase:info-tech-canon-service-surface. |
2. In scope now
Documentation and specification
- Maintain INTENT, this SCOPE, concept, PRD, TSD, and working defaults.
- Extract normative core artifacts (PRD Roadmap Phase 1):
specs/TargetRevenueFrameworkCore.mdspecs/PhaseManifestSpecification.mdspecs/TargetLedgerSpecification.md
- Prior-art research (archived under
history/260729-TRSL-*.md) and non-bindingTargetRevenueSourceLicense-V1C1.mdandTargetRevenueCommercialUseAgreement-V1C1.mdcandidates (WP-0001). - Provisional answers to conversion-critical open questions (
specs/OpenQuestions-WorkingDefaults.md). - Degeneration policy research artifact (recommended default for Stage 0 pilots).
- Canonical monetization profiles as documentation (defaults + examples).
- Lightweight contributor policy (
CONTRIBUTING.md).
Runnable specification foundation (not a hosted service)
- Machine-readable schemas for Phase Manifest, Ledger Entry, Extension Contract, Conversion Attestation.
- Pure, deterministic Outstanding Target fold and offline conformance validators.
- Golden Phase package under
examples/(concept §23 numbers). - Optional thin library/CLI for
validate/fold— no requirement for multi-tenant hosting, auth productization, or federation protocol.
Work system
- Hub-linked workplans, progress events, and consistency sync for this repo.
3. Explicitly out of scope now
| Item | Status |
|---|---|
| Hosted Trust Service implementation | In scope now — workplans/TREV-WP-0006-trust-service-implementation.md, active |
| Hosted Trust Service accepting pilot Phase data | In scope now for the T05 pilot Phase (local pilot instance; public reef still WP-0011) |
| Finalized legal license text and commercial agreements | TRSL/CUA V1C1 still preliminary; pilot operates under alpha/beta waiver + T05 scope record |
| Final degeneration formula as irreversible norm | v1 norm linear-longstop-v0 adopted (WP-0007); automation implemented (WP-0013) |
| Federation Stage 2+ (replication, multi-operator, multi-authority) | PRD Roadmap Phase 6 — still deferred |
| Governance formalization document | Done — specs/TRSL-Governance.md (WP-0008-T01) |
| Tax / statutory revenue recognition | Permanently out of framework core (INTENT boundaries) |
| Additional product-line Phase declarations beyond the first pilot | Not auto-authorized — each further Phase is a deliberate declaration act; T05 named only info-tech-canon |
| Accepting external code into a governed Milestone Release | Until CLA is accepted — draft exists (WP-0008-T04); block remains in CONTRIBUTING.md |
4. Sequencing rules (binding for workplans)
These rules implement SWOT I-05 / I-06 and the PRD roadmap order:
- Normative extraction (WP-0003) and prior-art research (WP-0001) proceed in parallel with schema + pure fold + golden fixture (WP-0002).
- Full Trust Service implementation (Phase Registry service, hosted append API, Metrics product, multi-user operation) must not start until:
- WP-0003 core extract deliverables exist (or are explicitly waived by human decision), and
- Working defaults for Longstop, currency, recognition, and minimum evidence are published.
- Human accept gates (recorded in the workplan or a decision note) are required before treating as done:
- WP-0001-T06 TRSL draft skeleton (legal-sensitive),
- WP-0002 stack/library ADR (if technology is locked),
- Any promotion of working defaults into normative core language.
- New monetization ideas land as profiles/extensions, not core terms, unless they pass the complexity budget (universal / interoperable / trust-critical).
- Real Phase declaration (a repo's actual License header changed to TRSL, a real Commercial Entitlement sold, real Development Credit tracked) must not occur until
workplans/TREV-WP-0008-governance-and-pilot-rollout.mdT05 is explicitly accepted. WP-0006/0007/0008's other tasks (Trust Service implementation, degeneration/profile finalization, governance drafting, draft/non-binding pilot Phase Manifests) may proceed in parallel and do not themselves authorize going live.
5. Stage 0 “done enough” signal
Stage 0 package is acceptable when:
- A newcomer can explain the five-verb lifecycle from README + core doc alone.
- Offline tools validate a golden Phase and recompute Outstanding Target to zero with no network service.
- Open questions have provisional defaults or explicit “blocked on legal/research” labels.
- WP-0001 research artifact exists; legal draft is marked non-binding and not used in production.
- This SCOPE honestly states what is not yet claimed.
6. Change policy
Update this file when Stage 0 boundaries change (e.g. first hosted Trust Service pilot authorized, first legal review complete). Do not weaken INTENT to match short-term delivery; expand SCOPE when INTENT milestones become active work.