tegwick-control/agent-tasks/binky-surface-critical-path.md
tegwick d4080de393 Complete TEGWICK-WP-0002 personal project intake scaffold
Establish the capture-to-commitment pipeline with INTAKE.md, structured
agent-tasks/ and decisions/ layouts, and seed the first prioritized
workstream (TEGWICK-WP-0003 Binky critical path visibility).
2026-06-24 15:25:54 +02:00

72 lines
No EOL
2.3 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

# Agent Task: Surface Binky critical path
Status: ready
Workplan: TEGWICK-WP-0003
Area: binky
## Goal
Populate `areas/binky-company.md` with an initial critical-path view: open
obligations, survival risks, business model options, and the next visible
surfaces — without making legal, tax, or financial conclusions.
## Context
Binky is A3 Critical in `PROJECT_LANDSCAPE.md`. The area card is still seed
content. TEGWICK-WP-0003 breaks visibility work into structured tasks. This
agent task covers the drafting pass across T01T03.
Human must supply or confirm factual details (dates, amounts, filing status).
Use `[NEEDS HUMAN INPUT]` markers where facts are unknown.
## Inputs
- `areas/binky-company.md`
- `PROJECT_LANDSCAPE.md`
- `WORKPLAN.md` (Phase 2)
- `workplans/TEGWICK-WP-0003-binky-critical-path.md`
- `INTAKE.md`, `AGENT_RULES.md`
## Allowed Changes
The agent may:
- edit `areas/binky-company.md` (Current State, Commitments, Options, Risks,
Open Decisions, Next Surface);
- add clearly marked placeholders for unknown facts;
- propose draft entries for `TASKS.md` (T04, T05) as commented suggestions in
the area card, not as live commitments.
## Forbidden Changes
The agent must not:
- state legal, tax, or accounting conclusions as facts;
- create payment, filing, or contract instructions;
- add secrets, credentials, or private account data;
- mark items as commitments in `TASKS.md` without explicit human approval;
- change Binky's activation level;
- create or modify other repositories.
## Expected Output
Updated `areas/binky-company.md` containing:
1. **Open obligations** — legal, tax, accounting (with unknowns marked).
2. **Survival risks** — ranked by urgency where possible.
3. **Business model options** — separated from commitments.
4. **Next surface** — what human review should tackle first.
## Acceptance Criteria
- Area card is no longer generic seed text in the critical-path sections.
- Options and commitments are clearly separated.
- No item is presented as resolved fact without source or human confirmation.
- TEGWICK-WP-0003 T01T03 can be marked done after human review of the draft.
## Human Approval Required For
- Converting any draft item into a `TASKS.md` commitment;
- Changing activation level;
- Any statement presented as legal, tax, or financial fact;
- Contacting advisors, authorities, or third parties.