the-custodian/docs/proposals/prj-helixforge-factory/history/2026-09-08-genesis.md

25 lines
1.3 KiB
Markdown
Raw Normal View History

# Genesis — 2026-09-08
The operator asked the Custodian to assess the Coulomb, HelixForge and Railiance
ecosystem, especially blocked/open workplan load, and provide a plan for an
agentic software factory.
The pre-proposal Hub snapshot contained 98 open workplan rows. Four explicitly
retired identities reduced the canonical baseline to 94 plans, 27 blocked,
containing 264 open tasks. All 94 matched local source workplan status. The
direct execution cohort contained nine plans and fifteen open tasks; much of
the remaining dependency load concerned identity/custody/audit and Railiance.
The proposal consumes existing GLAS-WP-0015 coordination and implementation
work. Its distinct deliverable is a useful, repeatable capability delivery loop
on Railiance with operating evidence and measurable human load. This avoids
mistaking either source-complete components or the HelixForge publication
programme for a functioning software factory.
Source assessment:
`the-custodian/docs/assessments/2026-09-08-helixforge-factory.md`.
Captured baseline and provenance live beside that report. This packet remains a
draft in the Custodian until HFACT-WP-0001-T01 establishes its dedicated project
source and verifies the prefix with the registrar. No factory work was activated
and no owner was contacted by this assessment.