the-custodian/docs/proposals/prj-helixforge-factory/history/2026-09-08-genesis.md
codex 389f7e7f1d
All checks were successful
CI Smoke / host-smoke (push) Successful in 0s
CI Smoke / container-smoke (push) Successful in 1s
Assess factory backlog and record first implemented delivery
2026-09-08 14:20:48 +02:00

1.3 KiB

Genesis — 2026-09-08

The operator asked the Custodian to assess the Coulomb, HelixForge and Railiance ecosystem, especially blocked/open workplan load, and provide a plan for an agentic software factory.

The pre-proposal Hub snapshot contained 98 open workplan rows. Four explicitly retired identities reduced the canonical baseline to 94 plans, 27 blocked, containing 264 open tasks. All 94 matched local source workplan status. The direct execution cohort contained nine plans and fifteen open tasks; much of the remaining dependency load concerned identity/custody/audit and Railiance.

The proposal consumes existing GLAS-WP-0015 coordination and implementation work. Its distinct deliverable is a useful, repeatable capability delivery loop on Railiance with operating evidence and measurable human load. This avoids mistaking either source-complete components or the HelixForge publication programme for a functioning software factory.

Source assessment: the-custodian/docs/assessments/2026-09-08-helixforge-factory.md. Captured baseline and provenance live beside that report. This packet remains a draft in the Custodian until HFACT-WP-0001-T01 establishes its dedicated project source and verifies the prefix with the registrar. No factory work was activated and no owner was contacted by this assessment.