Assess factory backlog and record first implemented delivery
All checks were successful
CI Smoke / host-smoke (push) Successful in 0s
CI Smoke / container-smoke (push) Successful in 1s

This commit is contained in:
codex 2026-09-08 14:20:48 +02:00
parent 4df570ac79
commit 389f7e7f1d
21 changed files with 4709 additions and 0 deletions

View file

@ -0,0 +1,50 @@
# Factory implementation return — 2026-09-08
The user authorized following through and selected vergabe-teilnahme as the
primary customer service/UI product. The Custodian selected reuse-surface for
the first internal capability: its existing hosted registry offers immediate
utility; Railiance Fabric’s hosted authority still adds prerequisite work.
## Delivered
- **REUSE-WP-0022:** explicit hosted plan-check, bounded/fresh/unwarned source
acceptance, no failure-to-NEW/local fallback, and snapshot provenance. All
208 tests and live Forgejo CI passed. Integrated on main at `998a5ef`, with
image `main-998a5ef` published. [Change](https://forgejo.coulomb.social/coulomb/reuse-surface/pulls/1).
- **VERGABE-WP-0018-T01/T02:** product identity, hosted reuse consumer, container
application gate before publication, missing-template build fix and pinned
BuildKit setup for the actual Railiance runner. All 82 tests passed on SQLite,
disposable PostgreSQL and in the container; live CI and image publication
passed. Integrated at `fa9f082`; image `main-fa9f082` published.
[Change](https://forgejo.coulomb.social/coulomb/vergabe-teilnahme/pulls/1).
- **Portfolio hygiene:** four obsolete human-needed flags now match explicit
published `needs_human: false` in the completed Forgejo migration source.
Task statuses and historical notes were preserved. Thirteen other terminal
flags still require source/residual disposition; none was cleared by counting
it as completed. [Correction evidence](2026-09-08-helixforge-factory/human-flag-corrections.json).
The dedicated local project is
[/home/worsch/prj-helixforge-factory](/home/worsch/prj-helixforge-factory/README.md).
It contains the accepted source-backed decision HFACT-DEC-2026-001, current
workplan, ten exact owner-return records, delivery evidence and an empty
measurement ledger. Hub decision receipt: `21159693-04b7-485e-bbab-1ed8f65aab43`.
The original staged packet is frozen pending project publication.
## Remaining gates
Project creation needs the routed Forgejo admin API credential, which currently
has no caller OpenBao login. Organization push-to-create is disabled. The same
login can record both already-integrated PRs as manually merged; the PR metadata
still says open, although the tested source is on main. There is no secret-value
request or additional token provision in this handoff.
The workplan retains exact native credential/approval/audit receipts through
GLAS-WP-0015, protected runtime placement, natural worker claim/heartbeat/close,
customer deployment/data/access/recovery acceptance and the 14-day observation
window. Today’s attended source delivery does not substitute for those proofs.
Both child workplans were registered and synchronized. The customer repository
has no consistency failures; historical warnings remain. Reuse-surface has three
archived null-ID failures (REUSE-WP-0017/0018/0019), separate from the successfully
registered new plan. HFACT-WP-0001-T02 retains their disposition; CUST-IN-0017
continues to own the pre-existing Custodian historical consistency issues.