the-custodian/docs/assessments/2026-09-08-helixforge-factory-followthrough.md
codex 389f7e7f1d
All checks were successful
CI Smoke / host-smoke (push) Successful in 0s
CI Smoke / container-smoke (push) Successful in 1s
Assess factory backlog and record first implemented delivery
2026-09-08 14:20:48 +02:00

3 KiB
Raw Blame History

Factory implementation return — 2026-09-08

The user authorized following through and selected vergabe-teilnahme as the primary customer service/UI product. The Custodian selected reuse-surface for the first internal capability: its existing hosted registry offers immediate utility; Railiance Fabric’s hosted authority still adds prerequisite work.

Delivered

  • REUSE-WP-0022: explicit hosted plan-check, bounded/fresh/unwarned source acceptance, no failure-to-NEW/local fallback, and snapshot provenance. All 208 tests and live Forgejo CI passed. Integrated on main at 998a5ef, with image main-998a5ef published. Change.
  • VERGABE-WP-0018-T01/T02: product identity, hosted reuse consumer, container application gate before publication, missing-template build fix and pinned BuildKit setup for the actual Railiance runner. All 82 tests passed on SQLite, disposable PostgreSQL and in the container; live CI and image publication passed. Integrated at fa9f082; image main-fa9f082 published. Change.
  • Portfolio hygiene: four obsolete human-needed flags now match explicit published needs_human: false in the completed Forgejo migration source. Task statuses and historical notes were preserved. Thirteen other terminal flags still require source/residual disposition; none was cleared by counting it as completed. Correction evidence.

The dedicated local project is /home/worsch/prj-helixforge-factory. It contains the accepted source-backed decision HFACT-DEC-2026-001, current workplan, ten exact owner-return records, delivery evidence and an empty measurement ledger. Hub decision receipt: 21159693-04b7-485e-bbab-1ed8f65aab43. The original staged packet is frozen pending project publication.

Remaining gates

Project creation needs the routed Forgejo admin API credential, which currently has no caller OpenBao login. Organization push-to-create is disabled. The same login can record both already-integrated PRs as manually merged; the PR metadata still says open, although the tested source is on main. There is no secret-value request or additional token provision in this handoff.

The workplan retains exact native credential/approval/audit receipts through GLAS-WP-0015, protected runtime placement, natural worker claim/heartbeat/close, customer deployment/data/access/recovery acceptance and the 14-day observation window. Today’s attended source delivery does not substitute for those proofs.

Both child workplans were registered and synchronized. The customer repository has no consistency failures; historical warnings remain. Reuse-surface has three archived null-ID failures (REUSE-WP-0017/0018/0019), separate from the successfully registered new plan. HFACT-WP-0001-T02 retains their disposition; CUST-IN-0017 continues to own the pre-existing Custodian historical consistency issues.