Assess factory backlog and record first implemented delivery
2026-09-08 14:20:48 +02:00

50 lines
3 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

# Factory implementation return — 2026-09-08
The user authorized following through and selected vergabe-teilnahme as the
primary customer service/UI product. The Custodian selected reuse-surface for
the first internal capability: its existing hosted registry offers immediate
utility; Railiance Fabric’s hosted authority still adds prerequisite work.
## Delivered
- **REUSE-WP-0022:** explicit hosted plan-check, bounded/fresh/unwarned source
acceptance, no failure-to-NEW/local fallback, and snapshot provenance. All
208 tests and live Forgejo CI passed. Integrated on main at `998a5ef`, with
image `main-998a5ef` published. [Change](https://forgejo.coulomb.social/coulomb/reuse-surface/pulls/1).
- **VERGABE-WP-0018-T01/T02:** product identity, hosted reuse consumer, container
application gate before publication, missing-template build fix and pinned
BuildKit setup for the actual Railiance runner. All 82 tests passed on SQLite,
disposable PostgreSQL and in the container; live CI and image publication
passed. Integrated at `fa9f082`; image `main-fa9f082` published.
[Change](https://forgejo.coulomb.social/coulomb/vergabe-teilnahme/pulls/1).
- **Portfolio hygiene:** four obsolete human-needed flags now match explicit
published `needs_human: false` in the completed Forgejo migration source.
Task statuses and historical notes were preserved. Thirteen other terminal
flags still require source/residual disposition; none was cleared by counting
it as completed. [Correction evidence](2026-09-08-helixforge-factory/human-flag-corrections.json).
The dedicated local project is
[/home/worsch/prj-helixforge-factory](/home/worsch/prj-helixforge-factory/README.md).
It contains the accepted source-backed decision HFACT-DEC-2026-001, current
workplan, ten exact owner-return records, delivery evidence and an empty
measurement ledger. Hub decision receipt: `21159693-04b7-485e-bbab-1ed8f65aab43`.
The original staged packet is frozen pending project publication.
## Remaining gates
Project creation needs the routed Forgejo admin API credential, which currently
has no caller OpenBao login. Organization push-to-create is disabled. The same
login can record both already-integrated PRs as manually merged; the PR metadata
still says open, although the tested source is on main. There is no secret-value
request or additional token provision in this handoff.
The workplan retains exact native credential/approval/audit receipts through
GLAS-WP-0015, protected runtime placement, natural worker claim/heartbeat/close,
customer deployment/data/access/recovery acceptance and the 14-day observation
window. Today’s attended source delivery does not substitute for those proofs.
Both child workplans were registered and synchronized. The customer repository
has no consistency failures; historical warnings remain. Reuse-surface has three
archived null-ID failures (REUSE-WP-0017/0018/0019), separate from the successfully
registered new plan. HFACT-WP-0001-T02 retains their disposition; CUST-IN-0017
continues to own the pre-existing Custodian historical consistency issues.