Declare Engine/PIP machine-readably, publish a total fail-closed PEP stance map, stop minting local decision ids on engine-unavailable DENY, bind allows to a 30s request lifetime, confine the local authorization double, classify evidence and emit a denial/revocation heartbeat, and prove access-control facts remain claims. Assistant: grok Assistant-Session: 01a04cea-f0d6-7ab3-9ffd-881eb6bea6cb
2 KiB
Operability
Diagnostics
Use readiness() for dependency checks and operability_snapshot() for
runtime counters and invariant checks. The snapshot currently reports store
readiness, whether written audit records carry a correlation id, outbox
diagnostic availability, and counts for users, accounts, tenant accounts,
memberships, applications, catalogs, profile values, audit records, and
pending outbox events. Those checks describe the records in hand. They
do not prove that every event that should have been emitted was emitted.
See docs/evidence-classification.md.
Structured Logs
Use structured_log_context(correlation_id=..., tenant=..., actor=...) as the
base log envelope. Adapters should add transport details around that envelope
without dropping correlation id or tenant.
Metrics
GET /metrics exposes Prometheus text containing the binary
user_engine_ready dependency gauge and bounded aggregate
user_engine_records{kind=...} counters. It does not expose identity values,
emails, tenant names, correlation identifiers, credential material, or raw
outbox payloads. Keep this route cluster-internal and authorize ingress only
from the selected monitoring workload.
Outbox Drain
outbox_diagnostics() reports pending event count, event type counts, and the
oldest pending correlation id. A real outbox drain adapter should publish
events idempotently by event_id, retain correlation_id, and only mark
delivery after the sink acknowledges receipt.
Cache Status
ClaimsEnrichmentProjectionCache.status() reports entry count and cached
tenant, application, and user keys. Token issuers must invalidate affected
users after profile, membership, or catalog changes before minting enriched
claims.
Runbook Checks
- Run
make test-conformance. - Confirm
readiness().readyis true. - Confirm
operability_snapshot().issuesis empty. - Confirm pending outbox events are either drained or expected for the local environment.
- Confirm production identity adapters reject local, expired, and missing-tenant claims.