A blanket "no retargeting in the measuring commit" rule would have been
wrong. CB-WP-0002 moved AC-1 three times in exactly that shape and every
move was correct -- each time a new instrument disproved the old figure.
Four legitimate corrections would have been forbidden to catch one bad
retarget.
The test is mechanical rather than a statement of intent:
correction the target moves and the implementation does not; legal in
the same commit provided the instrument's output is there
retarget the same commit changes both the target and the code the
target measures; requires an ADR stating why the new target
binds on future work
Applied retroactively: AM-4a/AM-4b are UNRATIFIED. They were set after
seeing the measurement, in the commit that produced it, with the
implementation changing too -- a retarget by this test. make dep-weight
is currently enforcing a target no reviewed decision stands behind.
Recorded as an open item; ratifying or changing them is a maintainer
decision, not an implementer's.
Also: specs/InnerLoop.md split into InnerLoop.md (process) and
InnerLoopReference.md (rubric, template, rules, definition of done).
Not a stylistic choice -- `make loop-lint` failed on the commit that
pushed the file to 407 lines against its own ~400 limit. The gate added
this morning to make that rule executable caught its own author within
the hour, which is the cheapest possible demonstration that it works.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
14 KiB
The Inner Loop — Assimilate and Surpass
Status: v1.1 — corrected from CB-WP-0002 (cost accounting) on
2026-07-31. Changes from v1.0: the instrument must exist and emit its own
target; inherited numbers are re-derived before use; every reporting tool
exposes --self-test; cost is in the definition of done. Rationale:
history/260731-cost-accounting-retrospective.md.
v1.0 — survived its first full pass (CB-WP-0001, the GROUND game kernel)
and was corrected from it on 2026-07-31. Changes from v0.2: measurement
validity (the positive control), metric feasibility and instrument naming,
four implementation rules the pass earned, and the requirement that
evidence state what it does not support. Rationale and the failures behind
each: history/260731-inner-loop-retrospective.md.
Normative process for building every Clay-Borg capability. Referenced by all workplans. The loop's own optimization target is agentic efficiency: every artifact it produces must be small enough to load whole, structured enough to act on without interpretation, and falsifiable enough that an agent can judge its own work without a human in the iteration.
The five steps
1 RESEARCH → research/CB-RES-NNNN-<slug>.md (survey, baselines)
2 APPROVE → decision recorded in the ADR (gate: survey complete?)
3 DECIDE → decisions/ADR-NNNN-<slug>.md (assimilate/reimplement/hybrid)
4 SPECIFY → specs/<Capability>.md (contracts + acceptance metrics)
5 CODE LOOP → code + scenarios + benchmarks (iterate until metrics beat baseline)
Hard gate: no implementation code for a capability exists before its ADR (step 3) is committed.
Loop tiers and the chaos roll
Every work packet declares a tier before work starts. The tier sets how heavy steps 1–3 are; steps 4–5 (spec with metrics, code loop with evidence) are never skipped for code-producing work.
| Tier | Weight of steps 1–3 | Structural trigger (forces at least this tier) |
|---|---|---|
| L | Full: separate survey, adversarial review, ADR | Creates a new capability port, or is named a high-leverage pass by the maintainer |
| M | Survey and ADR merged into one document; review optional | Touches a canonical interface, or adds/updates an external dependency |
| S | One provenance paragraph in the commit message | Everything else (utilities, fixes, refactors inside a boundary) |
The chaos roll. After deriving the structural tier, roll d4
(shuf -i 1-4 -n 1). On a 4, the tier is instead picked uniformly at
random (shuf -e S M L -n 1), overriding the structural derivation — up or
down.
Calibration window, opened 2026-07-31 (CB-WP-0003 T06). The rate was d10 and the mechanism never fired: two rolls across two workplans (CB-WP-0001: 9, CB-WP-0002: 2), against ~0.2 expected firings. At d10 and ~2 tier decisions per workplan it would take roughly twenty workplans to observe four overrides, so the mechanism was set at a rate that prevented its own evaluation — the one option T06 ruled out.
Raised to d4 (25%) for the next 12 tier declarations, then evaluated and either kept, returned to d10, or deleted. Expected ~3 firings in the window, which is enough to see whether an overridden tier produces a different outcome than the argued one.
Stated cost: a chaos-L override on work that would have been S buys a full survey, adversarial review, and ADR. Measured comparable: CB-WP-0001 T03 (a tier-L survey) cost $9.91. At 25% over 12 declarations the window is expected to cost $20–30. That is the price of finding out whether the mechanism is worth keeping, and it is cheaper than carrying an unevaluated ritual indefinitely. Both rolls are recorded in the tier declaration (
tier: M (structural L, chaos 10→M)). Record the roll every time, including when it changes nothing (tier: L (structural L, chaos 4)), so a mechanism that never fires is visible rather than assumed. Purpose: an occasional random reweighting keeps the classification honest — arguing everything into S stops paying off when audits can compare argued tiers against the random sample — and occasionally forces a deep look at something "obviously trivial", which is where local optima hide.
Chaos limits: a rolled-down tier relaxes process weight only. Invariants (zero foreign types in canonical interfaces, determinism, passing conformance suites) bind at every tier, and a rolled-down pass touching a canonical interface still requires the interface change to be flagged in the commit for retrospective review.
Step 1 — Research
Identify the best implementation in existence for this capability. Produce
research/CB-RES-NNNN-<slug>.md following the survey template (below).
The survey is done when it can name, per dimension, a concrete
benchmark-to-beat: a number, a property, or a reproducible comparison —
not an impression.
Runnable-baseline option. For passes judged high-leverage (declared by
the maintainer or proposed in the survey and confirmed in the ADR), cited
numbers are not enough: the survey must ship a reproducible baseline
harness that runs the leading candidate on our machine against our
workload — the same scenario files where feasible. The harness ships with a
fidelity note stating what was and wasn't faithfully reproduced, so a
hastily wired competitor setup cannot silently inflate our advantage.
Where the option is not invoked (or the candidate isn't practically
runnable), comparisons against cited-only numbers are directional: the
evidence verdict for those rows caps at parity, never better.
Step 2 — Approve (adversarial review)
For tier-L passes, approval is earned through an adversarial review: a separate session (or agent), given only the survey document, attempts to break it — an omitted candidate, a stale or unverifiable benchmark, an unmeasured claim presented as measured. Exactly one round: challenge, then response. The survey is approvable only when every challenge is either answered with evidence or conceded and folded into the survey.
Documentation requirement: the research process, the challenge, and the
resulting improvements to the research are each documented in timestamped
markdown files under history/:
history/YYMMDD-<slug>-research.md # how the survey was conducted: sources,
# queries, what was measured vs cited, dead ends
history/YYMMDD-<slug>-challenge.md # the adversarial attack, verbatim
history/YYMMDD-<slug>-response.md # answers/concessions and what changed in the survey
The polished survey artifact remains research/CB-RES-NNNN-<slug>.md; the
history files preserve the unpolished trail so a later reader can judge how
hard the survey was actually tested. For tier-M passes the review is
optional but, when performed, follows the same format. If not approvable
after the round, the loop returns to step 1 with the named gaps.
Step 3 — Decide
decisions/ADR-NNNN-<slug>.md: assimilate behind a port, reimplement, or
hybrid — with the expected advantage stated per dimension (see rubric).
An honest "worse here, better there, and why that trade is right" beats a
claimed sweep of all four dimensions.
Step 4 — Specify
specs/<Capability>.md: the contracts, invariants, and — mandatory — the
acceptance metrics table, each row tied to a baseline from step 1.
A spec without measurable acceptance criteria is not done. Metrics follow
the conventions in MetricsAndScenarios.md,
including the rule that metric selection itself passes through a mini
research step (metric provenance).
Every metric names its instrument, and is checked reachable. A row in the acceptance table carries the command that produces its number. A metric with no named instrument is a wish, not a metric.
The instrument must exist, and the target must come out of it.
Naming a command is not the same as running one. A target computed by
hand and merely labelled with a command is the same defect the rule
was written to stop, one level down. Where the instrument is built later
in the pass, the target is marked provisional: until the instrument
emits it, and the spec is amended to whatever the instrument returns.
(v1.1, from CB-WP-0002: specs/CostAccounting.md AC-1 named
cb-cost --pin fc76445 before that tool existed, and set the target to
a hand-computed $92.87. When the tool was built it returned $93.32 —
the hand computation carried a dedup bug the tool's own positive control
caught. The metric satisfied v1.0's rule completely and was still
wrong.)
A number inherited from earlier work is re-derived before it is used as a target, or it is cited as unverified. Quoting is not measuring.
(v1.1, from CB-WP-0002: the workplan opened with $248.46, inherited from a prior pass. Re-derivation put it at $92.21 — the quoted figure double-counted transcript lines and priced a three-model session at one model's rate. Neither error was of the harness-does-nothing class; both sums ran over real data, and a positive control would have passed them.)
Retargeting: the instrument may move a target, the implementation may not. A metric's target changes in only two ways, and they are not treated alike:
| trigger | requirement | |
|---|---|---|
| corrected | the instrument disproved the target — the target was computed by hand, or by an earlier tool with a defect | legitimate in the same commit, provided the instrument's output is in that commit |
| retargeted | the implementation missed the target and the target moves to accommodate it | requires an ADR: old target, the measurement, and why the new target binds on future work rather than merely passing present work |
The distinction is not the implementer's self-report of intent. It is mechanical: a correction is one where the target moves and the implementation does not. If the same commit changes both the target and the code the target measures, it is a retarget and needs the ADR.
(v1.1, from CB-WP-0002/0003: AM-4's targets were measured at 246,250 and set at 250,000 in one commit by the implementer after seeing the number — the structure this rule exists to stop. But CB-WP-0002 then moved AC-1 three times, correctly, each time because a new instrument disproved the old figure ($92.21 → $92.87 → $93.32 → $93.15). A blanket prohibition would have forbidden four legitimate corrections to catch one bad retarget.)
Applied retroactively: AM-4a and AM-4b are unratified until an ADR
is written or they are changed. They were set by the implementer after
seeing the measurement, in the commit that produced it, and the
implementation changed in that same commit — a retarget by the test above.
Tracked as an open item in history/260731-inner-loop-rule-audit.md.
A metric is checked against the contracts in its own spec. If a contract makes a target unreachable, one of the two is wrong and the conflict is resolved when it is noticed, not at the acceptance run. Re-check the table whenever a contract is added.
(v1.0, from CB-WP-0001: AM-4's ≤20-crate target was made unreachable by the K5 and K7 contracts written after it, and AM-12's cost metric was fully specified and never instrumented, so it could not be computed.)
Step 5 — Code loop
Implement iteratively. Each iteration:
change → cb-check (fmt, clippy, tests) → scenarios → benchmarks
→ compare against acceptance table → evidence row appended
Done when every acceptance metric meets or beats its baseline and the
comparison numbers are committed as an evidence file
(evidence/CB-EV-NNNN-<slug>.md). A failed scenario must yield a replay
artifact an agent can re-execute locally.
Measurement validity — the positive control
Every benchmark and harness must assert that it performed the work it reports. Completing without error is not evidence of having done anything: a loop whose commands are all rejected runs fast and reports a throughput for work that never happened.
Concretely, a measurement harness must, on every run:
- assert the unit of work produced its expected effect (events applied, rows written, moves accepted) — not merely that the call returned;
- fail loudly rather than report a number when that assertion fails;
- state the divisor used to convert raw timings into the metric's unit, pinned by a test so a workload change cannot silently rescale it.
A number from a run that cannot prove it did the work is void and must not reach an evidence file.
Every tool that reports a number exposes --self-test, and that
self-test runs before the number is produced (make cost depends on
make cost-test). The assertion must name a failure it detects, not
merely exercise the happy path.
(v1.0+, from CB-WP-0002: cb-cost's dedup assertion fired on its first
run against real data and aborted, catching a rule that was verified on
206/206 groups of the main transcript and false in the 8-response
subagent tree. The generalization that failed — a property confirmed on
the largest sample assumed to hold on the smallest — is not one review
catches, because both the survey and the adversarial reviewer checked
the same large sample.)
(v1.0, from CB-WP-0001: both serious errors in the first pass were of exactly this shape. A JS harness reported 8.4s for 100k moves while every move was being rejected, and a Rust benchmark reported 9.3M events/s — a 93× beat — while most rounds never completed because a stress gate rejected one player's action. The corrected figure was 5.6× lower. Adversarial review caught neither; both were claims about numbers, and review reads prose.)
Evidence states what it does not support
An evidence file that compares across runtimes, languages, or feature sets names the disanalogies explicitly, in the same section as the number. The reader must not have to infer that a ratio is not like-for-like. This is the parity-cap rule applied to the write-up: state the claim you will defend, and the claim you are not making.
Reference material
The four-dimension rubric, the survey template, the implementation rules each pass earned, the agentic-efficiency requirements, and the definition of done live in InnerLoopReference.md. They are normative; they are separated only so both files load whole.
(Split 2026-07-31: this file reached 407 lines against its own ~400-line
loadability rule, and make loop-lint — added the same day to make that
rule executable — failed on the commit that pushed it over. The rule
caught its own author within an hour of being written.)