Record probe-repo retirement and mark T01 complete; T02–T04 remain gated on operator stabilization sign-off and the inter-hub rename sequence.
4.5 KiB
| id | type | title | domain | repo | status | owner | topic_slug | created | updated | state_hub_workstream_id |
|---|---|---|---|---|---|---|---|---|---|---|
| CORE-WP-0007 | workplan | Retire Haskell/IHP infrastructure after Core Hub cutover | infotech | core-hub | active | codex | custodian | 2026-06-27 | 2026-07-07 | a8d66822-e435-4b1e-ad81-37a298d1795e |
Retire Haskell/IHP infrastructure after Core Hub cutover
Remove the Haskell dependency from the production interaction framework after the replacement is proven.
CORE-WP-0005 finished 2026-07-03: hub.coulomb.social ingress now serves Core
Hub; Inter-Hub compatibility, staging import, dual-run smokes, and production
cutover gates are closed. Haskell retirement no longer waits on migration work —
it waits on a short post-cutover stabilization window, operator approval to
retire the Inter-Hub rollback deployment, and the four tasks below.
Retire Probe Repo
id: CORE-WP-0007-T01
status: done
priority: medium
state_hub_task_id: "d3a494a3-dc23-491f-af32-1d19120b3aae"
Rename or archive ihp-railiance-probe (coulomb/ihp-railiance-probe),
preserving INTENT.md and DeploymentBlueprint.md notes about the failed
IHP/GHC/Nix build path. IRP-WP-0001 is already done; this task is
unblocked and can proceed independently of T02–T04.
Rename Production Inter-Hub Repo
id: CORE-WP-0007-T02
status: wait
priority: high
state_hub_task_id: "16eb7ce3-b574-4667-a189-c14ff5d0502b"
Rename inter-hub to inter-hub-haskell after operator stabilization sign-off
and approval to retire the Inter-Hub rollback path. Compatibility, migration,
and production cutover gates from CORE-WP-0005 are satisfied; the Inter-Hub
k8s deployment in namespace inter-hub still runs as rollback-only (ingress
already moved — see k8s/railiance-production/README.md).
Scope when unblocked: Forgejo repo rename, registry/Helm/CI path updates in
railiance-apps and railiance-forge, and eventual scale-down of the
rollback deployment after the stabilization window closes.
Decommission Haskell Build Lane
id: CORE-WP-0007-T03
status: wait
priority: medium
state_hub_task_id: "bea9943c-916f-402f-a6d9-7907bb48137c"
Retire or park haskelseed runner labels, the haskell-build VM profile,
IHP/GHC/Nix/devenv docs, and build-machine workplans after T02 completes and no
active repo still needs Haskell image builds. Primary touchpoints:
railiance-forge runner substrate docs, sand-boxer profile.vm-haskell-build,
and ops-bridge haskelseed tunnel notes.
Update Cross-Repo References
id: CORE-WP-0007-T04
status: wait
priority: medium
state_hub_task_id: "ed7f8e01-5305-465c-8bfc-04bc47bfdf40"
After T02, update docs and workplans in consuming repos so production Inter-Hub
references point to Core Hub and historical Haskell context explicitly names
inter-hub-haskell. Known stale surfaces: ops-hub INTENT/SCOPE/README and
readiness docs; activity-core railiance probes and sink vocabulary;
the-custodian service catalog and drain plans. Core Hub specs and migration
fixtures already use inter-hub-haskell as the bundle source name.
Progress 2026-07-07 — upstream gate cleared
CORE-WP-0005 archived (260703-CORE-WP-0005-data-migration-and-cutover.md).
Production cutover executed 2026-07-03: Core Hub serves hub.coulomb.social;
post-flip reconcile import was idempotent (0 created / 28 updated / 0 errors);
rollback remains one kubectl command while the Inter-Hub deployment stays
running through stabilization.
Revised sequencing:
- T01 — unblocked; archive
ihp-railiance-probefirst (low risk). - T02 — cutover prerequisites met; blocked on operator stabilization sign-off and approval to retire the Inter-Hub rollback deployment.
- T03 — blocked on T02 and confirmation that no repo still schedules Haskell builds through haskelseed.
- T04 — blocked on T02 so references use the final repo name.
Related finished workplans: CORE-WP-0004 (compatibility smokes),
CORE-WP-0005 (migration/cutover), CORE-WP-0008 (deployed ops evidence).
Completion 2026-07-07 — T01 probe repo archived
ihp-railiance-probe retired in-repo:
README.mdmarks the repo archived and points to preserved docsINTENT.mdandSCOPE.mdupdated with retirement contextIRP-WP-0001moved toworkplans/archived/260707-IRP-WP-0001-pipeline-validation.md(status: archived)- Gitea/Forgejo CI workflows switched to
workflow_dispatchonly (no push triggers)
Forgejo repo archive/rename on the forge remains optional; git history and
diagnostic docs are preserved locally and on gitea.coulomb.social.