Promote GH-IN-0001 to GH-WP-0002: approval evidence integrity
audit-core raised the intake with a drafted five-task plan and invited us to promote it verbatim or revise. Adopted close to verbatim, plus a sixth task for the consumption ordering contract flex-auth raised in the same round. The omission gap is not accepted for approvals. v0.5 §9.6 distinguishes load-bearing evidence from attributive; approvals are load-bearing, so emission atomicity is required and the outbox must be local. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com> Assistant: claude-code Assistant-Model: opus Assistant-Process: 2564823@bnt-lap001 Assistant-Session: 2a7ed827-4928-4b9f-8613-9135c9cadfe9
This commit is contained in:
parent
159283663b
commit
02a1dc1b9a
2 changed files with 98 additions and 1 deletions
|
|
@ -9,11 +9,18 @@
|
|||
| Kind | ID | Status | Lane | Source |
|
||||
| --- | --- | --- | --- | --- |
|
||||
| workplan | GH-WP-0001 | active | — | workplans/GH-WP-0001-foundation.md |
|
||||
| workplan | GH-WP-0002 | active | — | workplans/GH-WP-0002-approval-evidence-integrity.md |
|
||||
| task | GH-WP-0001-T01 | done | — | workplans/GH-WP-0001-foundation.md |
|
||||
| task | GH-WP-0001-T02 | done | — | workplans/GH-WP-0001-foundation.md |
|
||||
| task | GH-WP-0001-T03 | done | — | workplans/GH-WP-0001-foundation.md |
|
||||
| task | GH-WP-0001-T04 | todo | — | workplans/GH-WP-0001-foundation.md |
|
||||
| task | GH-WP-0001-T05 | todo | — | workplans/GH-WP-0001-foundation.md |
|
||||
| task | GH-WP-0001-T06 | todo | — | workplans/GH-WP-0001-foundation.md |
|
||||
| intake | GH-IN-0001 | open | red | intakes/intakes.md |
|
||||
| task | GH-WP-0002-T01 | done | — | workplans/GH-WP-0002-approval-evidence-integrity.md |
|
||||
| task | GH-WP-0002-T02 | progress | — | workplans/GH-WP-0002-approval-evidence-integrity.md |
|
||||
| task | GH-WP-0002-T03 | todo | — | workplans/GH-WP-0002-approval-evidence-integrity.md |
|
||||
| task | GH-WP-0002-T04 | todo | — | workplans/GH-WP-0002-approval-evidence-integrity.md |
|
||||
| task | GH-WP-0002-T05 | todo | — | workplans/GH-WP-0002-approval-evidence-integrity.md |
|
||||
| task | GH-WP-0002-T06 | todo | — | workplans/GH-WP-0002-approval-evidence-integrity.md |
|
||||
| intake | GH-IN-0001 | closed | red | intakes/intakes.md |
|
||||
| decision | GH-DEC-2026-001 | resolved | — | decisions/decisions.md |
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue