gate-house/WORK-RECORDS.md
tegwick 02a1dc1b9a Promote GH-IN-0001 to GH-WP-0002: approval evidence integrity
audit-core raised the intake with a drafted five-task plan and invited us to
promote it verbatim or revise. Adopted close to verbatim, plus a sixth task for
the consumption ordering contract flex-auth raised in the same round.

The omission gap is not accepted for approvals. v0.5 §9.6 distinguishes
load-bearing evidence from attributive; approvals are load-bearing, so emission
atomicity is required and the outbox must be local.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>

Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 2564823@bnt-lap001
Assistant-Session: 2a7ed827-4928-4b9f-8613-9135c9cadfe9
2026-08-29 02:56:11 +02:00

1.7 KiB

Work Records — gate-house

Generated by statehub fix-consistency (CUST-WP-0061-T04, work-record stage 3). Do not edit by hand — edit the source file/block listed for each record and re-run fix-consistency to refresh this index. Archived workplans are omitted; closed decisions/intakes/engagements stay listed so recently-resolved work is still visible. [auto]

Kind ID Status Lane Source
workplan GH-WP-0001 active workplans/GH-WP-0001-foundation.md
workplan GH-WP-0002 active workplans/GH-WP-0002-approval-evidence-integrity.md
task GH-WP-0001-T01 done workplans/GH-WP-0001-foundation.md
task GH-WP-0001-T02 done workplans/GH-WP-0001-foundation.md
task GH-WP-0001-T03 done workplans/GH-WP-0001-foundation.md
task GH-WP-0001-T04 todo workplans/GH-WP-0001-foundation.md
task GH-WP-0001-T05 todo workplans/GH-WP-0001-foundation.md
task GH-WP-0001-T06 todo workplans/GH-WP-0001-foundation.md
task GH-WP-0002-T01 done workplans/GH-WP-0002-approval-evidence-integrity.md
task GH-WP-0002-T02 progress workplans/GH-WP-0002-approval-evidence-integrity.md
task GH-WP-0002-T03 todo workplans/GH-WP-0002-approval-evidence-integrity.md
task GH-WP-0002-T04 todo workplans/GH-WP-0002-approval-evidence-integrity.md
task GH-WP-0002-T05 todo workplans/GH-WP-0002-approval-evidence-integrity.md
task GH-WP-0002-T06 todo workplans/GH-WP-0002-approval-evidence-integrity.md
intake GH-IN-0001 closed red intakes/intakes.md
decision GH-DEC-2026-001 resolved decisions/decisions.md