gate-house/WORK-RECORDS.md
tegwick 02a1dc1b9a Promote GH-IN-0001 to GH-WP-0002: approval evidence integrity
audit-core raised the intake with a drafted five-task plan and invited us to
promote it verbatim or revise. Adopted close to verbatim, plus a sixth task for
the consumption ordering contract flex-auth raised in the same round.

The omission gap is not accepted for approvals. v0.5 §9.6 distinguishes
load-bearing evidence from attributive; approvals are load-bearing, so emission
atomicity is required and the outbox must be local.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>

Assistant: claude-code
Assistant-Model: opus
Assistant-Process: 2564823@bnt-lap001
Assistant-Session: 2a7ed827-4928-4b9f-8613-9135c9cadfe9
2026-08-29 02:56:11 +02:00

26 lines
1.7 KiB
Markdown

# Work Records — gate-house
> Generated by `statehub fix-consistency` (CUST-WP-0061-T04, work-record
> stage 3). Do not edit by hand — edit the source file/block listed for
> each record and re-run fix-consistency to refresh this index. Archived
> workplans are omitted; closed decisions/intakes/engagements stay listed
> so recently-resolved work is still visible. [auto]
| Kind | ID | Status | Lane | Source |
| --- | --- | --- | --- | --- |
| workplan | GH-WP-0001 | active | — | workplans/GH-WP-0001-foundation.md |
| workplan | GH-WP-0002 | active | — | workplans/GH-WP-0002-approval-evidence-integrity.md |
| task | GH-WP-0001-T01 | done | — | workplans/GH-WP-0001-foundation.md |
| task | GH-WP-0001-T02 | done | — | workplans/GH-WP-0001-foundation.md |
| task | GH-WP-0001-T03 | done | — | workplans/GH-WP-0001-foundation.md |
| task | GH-WP-0001-T04 | todo | — | workplans/GH-WP-0001-foundation.md |
| task | GH-WP-0001-T05 | todo | — | workplans/GH-WP-0001-foundation.md |
| task | GH-WP-0001-T06 | todo | — | workplans/GH-WP-0001-foundation.md |
| task | GH-WP-0002-T01 | done | — | workplans/GH-WP-0002-approval-evidence-integrity.md |
| task | GH-WP-0002-T02 | progress | — | workplans/GH-WP-0002-approval-evidence-integrity.md |
| task | GH-WP-0002-T03 | todo | — | workplans/GH-WP-0002-approval-evidence-integrity.md |
| task | GH-WP-0002-T04 | todo | — | workplans/GH-WP-0002-approval-evidence-integrity.md |
| task | GH-WP-0002-T05 | todo | — | workplans/GH-WP-0002-approval-evidence-integrity.md |
| task | GH-WP-0002-T06 | todo | — | workplans/GH-WP-0002-approval-evidence-integrity.md |
| intake | GH-IN-0001 | closed | red | intakes/intakes.md |
| decision | GH-DEC-2026-001 | resolved | — | decisions/decisions.md |