Assistant: codex Assistant-Model: gpt-5.6-sol Assistant-Session: 01a05e30-2884-71b0-98d7-7edd16ae737b
5.1 KiB
Conformance reporting contract
Owner: gate-house Executor: whitehat-security Posture observer: kings-guard Finding triage: risk-nexus Status: normative for GH-WP-0001-T06 Version: conformance-reporting.v1 Date: 2026-09-01
1. Purpose
This contract establishes how execution of a Gate House assurance specification returns to doctrine review. It preserves four distinct judgments:
Gate House specifies the invariant and executable target
whitehat-security attacks and reports whether the observed control held
risk-nexus owns finding severity, disclosure, and owner routing
Gate House decides whether the result requires doctrine change
Gate House does not grade its own specification by reinterpreting a whitehat result, assign severity, close an implementation defect, or block delivery.
2. Report envelope
Whitehat-security continues to use whitehat-run/v1 as its native report. For
Gate House conformance return, the report or a value-safe projection must also
make these fields expressible:
schema_version: conformance-reporting.v1
report_id: <stable id>
specification:
id: asm-assurance-targets.v1
test_id: T-03
target:
component: <repo or protected system>
revision: <immutable revision>
environment: <fixture/build/production>
claim:
invariant_ids: [A-14, INV-05]
engagement_id: <whitehat engagement>
authorization_id: <recorded authorization>
run_id: <whitehat run>
outcome: pass | finding | inconclusive | aborted
known_bad_calibration_ref: <evidence ref>
evidence_refs: []
emission_guarantee_refs: []
limitations: []
assurance_statement: <bounded statement>
returned_at: <RFC 3339 UTC>
The projection contains no credential value, secret, unrelated response body, severity, disclosure decision, or exploit detail unsafe for the recipient.
3. Outcome rules
- Every outcome returns, including
pass, because target revision and run date define the freshness of limited assurance. inconclusiveandaborteddo not count as conformance.- A known-bad calibration that has never failed makes the target
inconclusive, even if the real target probe reports no effect. - A changed target revision invalidates any claim that the earlier result is current unless the executor records why the change is immaterial.
- Absence of a report is
not_run, notpass. - A passing report states only that the recorded attacks did not cross the boundary under the recorded conditions.
4. Return transport
The durable coordination envelope is a State Hub inbox message to
gate-house:
Subject: [GH-CONFORMANCE] <test-id> <outcome> <target>@<revision>
Body: report id, safe report/evidence references, specification version,
run and authorization ids, limitations, and requested Gate House action
Large or sensitive evidence remains under whitehat-security/risk-nexus custody; the message carries stable references and a value-safe summary. The emitting repository records the report in its own work structure before sending the message.
5. Finding routes
| Result | Required route |
|---|---|
| Implementation control failed | whitehat-security → risk-nexus → implementation owner; Gate House receives the safe conformance report. |
| Doctrine is ambiguous, contradictory, unsafe, or impossible to test | whitehat-security or kings-guard → Gate House intake/message, citing test and evidence. |
| Target or execution harness gap | whitehat-security owns or promotes the gap in its repository; Gate House records the test as pending. |
| Posture, stream-silence, or live-observation gap | kings-guard owns or promotes the observation gap and returns the safe finding to Gate House. |
| Severity/disclosure question | risk-nexus only. |
One observation may take both the implementation and doctrine routes. The two records cross-reference one another; Gate House does not absorb the owner's remediation task.
6. Gate House review record
For each returned report, Gate House records:
- report, target, revision, test, and invariant identifiers;
- whitehat outcome without changing it;
- doctrine disposition:
no_change,clarify,revise,new_target, orwithdraw_claim; - any Gate House intake, decision, contract revision, or workplan produced;
- implementation/risk-nexus reference where a control failed;
- next review trigger: target revision, cadence date, or finding closure.
A conformance review is complete when the result has an explicit doctrine disposition and every residual has a live owner. Closing a Gate House review does not close the underlying security finding.
7. Cadence and aggregation
Cadence belongs to whitehat-security because the run interval is part of the attacker model and exposure window. Gate House may request a minimum review condition, but it must not label stale evidence current.
Gate House may publish an aggregate conformance view only if it preserves:
- target and revision specificity;
- last executed and next due times;
- outcome and limitations;
- tests that are pending, inapplicable, inconclusive, or not run;
- the audit completeness bound.
An aggregate must not turn missing reports into green cells.