prj-unattended-progress-com.../workplans/UPC-WP-0001-foundation.md

143 lines
4.7 KiB
Markdown
Raw Normal View History

---
id: UPC-WP-0001
type: workplan
title: "Project foundation and gate map"
domain: infotech
repo: prj-unattended-progress-company
status: finished
owner: bernd
topic_slug: infotech
repo_goal_id: "79a2b057-b765-47ad-b5d9-c1bbc49eba43"
created: "2026-08-09"
updated: "2026-08-11"
quality_dor: DoR-Ok
quality_dor_at: "2026-08-09"
quality_dor_by: "grok"
quality_dor_note: "Foundation plan maps GOAL.md gates G1G9 to evidence and child repos; no production code in this WP."
quality_dod: DoD-Ok
quality_dod_at: "2026-08-11"
quality_dod_by: "grok"
quality_dod_note: "Gate map, baseline inventory, child map, and three next UPC-WP drafts (00020004) delivered; residuals are live proposed workplans."
state_hub_workstream_id: "8dad7f23-9b0a-4b0e-9dfb-c59ae6d9c86f"
---
# Project foundation and gate map
## Goal
Stand up this `prj-` repository as the coordination surface for the active
repo goal: make **Binky Hedgehog GmbH** a profitable, self-organizing company
with minimal CEO time and governance.
Deliverables of this workplan:
1. Project files and State Hub registration are complete and consistent.
2. A gate map links every `GOAL.md` success gate (G1G9) to evidence homes and
participating repos — without duplicating child task lists.
3. A child-workplan map records existing and missing implementation streams
(especially in `binky-control`).
4. The next coordination workplans are scoped so unattended progress can start
against open gates.
Implementation remains in participating repositories. This workplan only
coordinates.
## Register project and establish GOAL as hub goal
```task
id: UPC-WP-0001-T01
status: done
priority: high
state_hub_task_id: "2bec18da-5407-4048-9238-c7998253e580"
```
Create `GOAL.md` (prj-flavor), `.repo-classification.yaml`, `SCOPE.md`,
`AGENTS.md`, and genesis history. Register the repo in State Hub and create
the active repo goal from `GOAL.md`.
**Result (2026-08-09):**
- Repo slug `prj-unattended-progress-company` registered
(`01cc54ec-178d-4547-b17d-24bd97997987`), domain `infotech`, category
`project`.
- Active repo goal
`79a2b057-b765-47ad-b5d9-c1bbc49eba43`
*Profitable self-organizing Binky Hedgehog GmbH with minimal CEO time and
governance*.
- Progress event recorded for registration + goal create.
## Build the gate-to-evidence map
```task
id: UPC-WP-0001-T02
status: done
priority: high
state_hub_task_id: "dee415cd-7eb0-4698-98bb-e1d437c27d2e"
```
Produce `architecture/gate-map.md` (or `inventory/gate-map.yaml` if more
machine-friendly) covering every success gate G1G9.
**Result (2026-08-11):** `architecture/gate-map.md` — G1G9 with owners,
child IDs, evidence pointers, status (`open`/`partial`/`met`), blockers, and
cluster sequencing (vessel / unattended+load / revenue / governance).
## Inventory current company state against G1G9
```task
id: UPC-WP-0001-T03
status: done
priority: high
state_hub_task_id: "34155b30-2ebb-4093-9bed-2d6f590072c2"
```
From `binky-control` (and only other repos when the gate demands it), write a
baseline snapshot under `inventory/`.
**Result (2026-08-11):** `inventory/baseline-g1-g9.md` — G1 partial (OH batch);
G2 near met; G3 strong/partial; G4 open (no measurement); G5G7 open (offer
drafted only); G8 partial; G9 endgame. Top leverage: drain OH batch, then
publish offer, measure load, package G3 acceptance.
## Establish the child-workplan map
```task
id: UPC-WP-0001-T04
status: done
priority: high
state_hub_task_id: "26017f0a-9df9-4994-9c2b-fd1963ed460e"
```
Create `architecture/child-workplan-map.md` listing existing children, gaps,
and recommended next streams.
**Result (2026-08-11):** `architecture/child-workplan-map.md` — BINKY-WP-0001…0007
mapped to gates; OH/AWQ live surfaces; gaps for vessel close-out WP, G4 metric,
offer publish, G3 acceptance pack. SCOPE participating table unchanged.
## Scope the next project coordination workplans
```task
id: UPC-WP-0001-T05
status: done
priority: medium
state_hub_task_id: "29f71041-ca6a-4e39-8090-aa59fa1d93d2"
```
Based on T02T04, draft the next `UPC-WP-*` plans for open gate clusters.
**Result (2026-08-11):** Live proposed workplans (residuals of this foundation):
| ID | Cluster | Status |
| --- | --- | --- |
| UPC-WP-0002 | Company vessel close-out (G1 + residual G2/G8) | proposed |
| UPC-WP-0003 | Unattended dogfood + founder-load (G3G4) | proposed |
| UPC-WP-0004 | First offer and paid revenue (G5G6) | proposed |
## Done when
- [x] T01 done; hub/file IDs consistent after fix-consistency.
- [x] Gate map, baseline inventory, and child-workplan map cover G1G9.
- [x] Next UPC-WP-* drafted so foundation leaves no unowned vacuum.
- [x] Residuals are live workplans (00020004), not prose-only leftovers.