prj-unattended-progress-com.../inventory/baseline-g1-g9.md
tegwick 0fb5c7a8b5 Complete UPC-WP-0001 foundation: gate map, inventory, next WPs.
Deliver G1–G9 gate-to-evidence and child-workplan maps, baseline inventory
from binky-control, and proposed UPC-WP-0002–0004 for vessel, load, and
revenue clusters. Mark foundation finished with DoD-Ok.
2026-08-11 02:30:48 +02:00

5.5 KiB
Raw Permalink Blame History

id type repo parent_workplan created as_of
UPC-INV-0001 inventory prj-unattended-progress-company UPC-WP-0001 2026-08-11 2026-08-11

Baseline inventory — company state vs G1G9

Snapshot of Binky Hedgehog GmbH operating state for the unattended-progress project. Prefer pointers into binky-control over rewriting canon.

Source root: /home/worsch/binky-control (hub slug binky-control).

G1 — Administratively clean (S1 / Phase 1)

Area Snapshot Pointer
Legal vessel Exists since 2019 (S0 done) SuccessMilestones.md S0
Handelsregister / address / purpose Verify pending (OH prepared) OfficeHourQueue.md OH-2026-004; CompanyReactivationPlan.md Legal
StB mandate JA 2025+ In progress — inquiry Bohle-Horsmann; follow-up prepared OH-2026-001; RISK-006
Filings history Current through JA 2024 Reactivation Plan Tax checklist
Bookkeeping / DATEV DUO Transition + receipt backlog open OH-2026-002; RISK-007
Banking Qonto active; cost/access review prepared OH-2026-003; BINKY-WP-0005 evidence
Cost / run-rate Table v2 with Qonto-verified rows finance/CostRunRate.md, finance/qonto-first-pull-2026-07-21.json
Domains / email binky-hedgehog.com owned; company email exists; NK/OpenBao integration residual AWQ-003, AWQ-007 history; Reactivation digital presence
Website Minimal public page missing Reactivation digital presence
Contracts / IP ownership Inventory incomplete; needed before selling ecosystem products Reactivation Contracts & IP

Verdict: partial. Orange-lane OH batch is the main G1 execution path.

G2 — Company OS active (S2)

Artefact State Pointer
Company canon v1.0 ratified 2026-07-16 (DEC-2026-001) INTENT.md, DecisionQueue
Autonomy policy Present; lanes used in queues/WPs AutonomyPolicy.md
Decision queue Live; recent decisions resolved DecisionQueue.md
Office-hour queue Live; 5 prepared items OfficeHourQueue.md
Autopilot queue Live; high-leverage items largely closed/promoted AutopilotWorkQueue.md
Operating rhythm Daily brief + queue hygiene defined; briefs through early Aug 2026 OperatingRhythm.md, briefs/
Control loops / dogfood policy Present ControlLoopCatalog.md, DogfoodPolicy.md
State Hub integration Bootstrap done BINKY-WP-0001

Verdict: partial → near met operationally. Reactivation Plan still lists some governance checkboxes open; treat as checklist lag vs lived OS.

G3 — Dogfood loop closed (S3)

Loop State Pointer
OK Audit dogfood v0 run on Binky 2026-07-16 audits/OK-Audit-v0-binky.md
Autopilot + rhythm WPs 0003 finished BINKY-WP-0003
Workstation-independent executor Finished 2026-07-21 BINKY-WP-0004
Railiance llm-connect rhythm (no host coding agent) Finished BINKY-WP-0006
Weekly founder review via llm-connect Production proof 2026-08-08 AWQ-011 → REIN-A-0003; ops_run ad0b05c4-8ad8-40c7-9985-75481728ae30
Qonto as agent-readable finance Integration finished BINKY-WP-0005, BINKY-WP-0007

Verdict: partial / strong. Unattended loops exist with evidence; S3 milestone not yet founder-marked; project still needs a single acceptance evidence pack under evidence/ when claiming G3 met.

G4 — Founder load within budget

Item State
Target envelope 13 h/day outside business hours + ~2 OH days/month (GOAL.md, INTENT.md)
Measurement Gap — no sustained time log or automated load KPI for ≥30 days
Qualitative signal Office-hour batching and decision packaging reduce random interrupts; load not proven

Verdict: open.

G5G7 — Profitability path

Gate State Pointer
G5 Offer published Flagship Operational Knowledge Audit drafted; status drafted — publish is Yellow OfferCatalog.md
G6 First paid revenue No booked external sale of the offer; incidental/sublet credits ≠ product revenue CostRunRate “Known recurring income”
G7 Repeatable path Not started as productized delivery

Verdict: G5G7 open; G5 is the immediate commercial unlock after G1 OH drain and publish decision.

G8 — Decision surface thin

Queue Open surface (as of scan)
DecisionQueue Template allows prepared/resolved/deferred; recent structured decisions resolved
OfficeHourQueue 5 prepared (StB, DUO, Qonto, Handelsregister, Stripe webhook) — correctly Orange-batched
AutopilotWorkQueue Optional/open residuals: AWQ-012, AWQ-002, AWQ-003, AWQ-006 (low urgency cartography/domain)

Verdict: partial. Surface is packaged (not ad-hoc), but G1 OH load means the company is not yet “thin” on founder business-hour demand.

G9 — Residuals owned outside project

Not claimable until project retirement. Residual pattern is already established in binky-control (AWQ intakes with origin: residual + origin_ref). Each finishing UPC-WP must hand residuals as live records.

Top leverage (baseline conclusion)

  1. Drain prepared OH batch (G1 / G8) — highest leverage for vessel clean + thinner founder surface.
  2. Yellow decision: publish OK Audit offer (G5) — once vessel is credible.
  3. Define G4 measurement — so “minimal CEO time” is evidence, not aspiration.
  4. Package G3 acceptance — declare S3 with linked ops_run/audit evidence.