T01: verified all five OH items still prepared in binky-control (no activity since 2026-08-08); the first-half-of-August command-day window lapsed at 0/5. Tracker now records the slip rather than carrying a stale date. OH-2026-004 prep gap closed in binky-control (92838e1) — batch is founder-blocked, not preparation-blocked. T02: gate-map G1/G8 evidence columns refreshed. T03: todo -> progress. Pre-drafted evidence/s1-decision-package.md with the decision question, three options, and an evidence table keyed to the OH ids; verdict cells fill once the batch drains. Not presented to the founder yet. Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
72 lines
2.9 KiB
Markdown
72 lines
2.9 KiB
Markdown
---
|
||
id: UPC-EVID-S1-PKG-0001
|
||
type: evidence
|
||
repo: prj-unattended-progress-company
|
||
parent_workplan: UPC-WP-0002
|
||
parent_task: UPC-WP-0002-T03
|
||
status: draft
|
||
created: "2026-08-16"
|
||
updated: "2026-08-16"
|
||
as_of: "2026-08-16"
|
||
---
|
||
|
||
# S1 decision package — "vessel administratively clean"
|
||
|
||
**Lane:** Yellow (prepared for founder review; approve/reject, not open-ended).
|
||
**Decision owner:** Bernd (CEO/GF).
|
||
**Target record:** `binky-control/SuccessMilestones.md` → mark **S1** or record
|
||
explicit residual exceptions.
|
||
|
||
**Status: DRAFT — not yet decidable.** This package is pre-built so that the
|
||
moment the G1 OH batch drains it can be filled from
|
||
`evidence/g1-oh-batch.md` and put in front of the founder in one pass, rather
|
||
than assembled from scratch after the fact. Do not present it while the
|
||
evidence column below is empty.
|
||
|
||
## Decision asked
|
||
|
||
> Is Binky Hedgehog GmbH **administratively clean** — Handelsregister, address,
|
||
> tax/StB mandate, bookkeeping workflow, and banking access current and usable
|
||
> for ordinary operations?
|
||
|
||
Answer is one of:
|
||
|
||
- **A — Mark S1.** All five evidence rows green; no residual blocks ordinary ops.
|
||
- **B — Mark S1 with named exceptions.** Rows green enough to operate; each
|
||
remaining gap has a live work record outside this project (G9 condition).
|
||
- **C — Do not mark.** At least one row blocks ordinary operations; name it and
|
||
the next action.
|
||
|
||
Option B is the expected outcome, not a compromise — G1 is defined as
|
||
"current and usable for ordinary operations", not "zero open items".
|
||
|
||
## Evidence required (fill from `evidence/g1-oh-batch.md`)
|
||
|
||
| G1 element | Source OH | Evidence pointer | Verdict |
|
||
| --- | --- | --- | --- |
|
||
| Handelsregister / address / purpose | OH-2026-004 | _(pending)_ | _(pending)_ |
|
||
| Tax / StB mandate (JA 2025+) | OH-2026-001 | _(pending)_ | _(pending)_ |
|
||
| Bookkeeping workflow (DUO) | OH-2026-002 | _(pending)_ | _(pending)_ |
|
||
| Banking access usable | OH-2026-003 | _(pending)_ | _(pending)_ |
|
||
| Payment infra noise cleared | OH-2026-005 | _(pending)_ | _(pending)_ |
|
||
|
||
**Gate rule:** elements 1–4 must be green for A or B. Element 5 is hygiene, not
|
||
a G1 blocker — a stale Stripe webhook does not make the vessel unclean.
|
||
|
||
## Residual exceptions (for option B)
|
||
|
||
| Gap | Owning repo | Live record | Lane |
|
||
| --- | --- | --- | --- |
|
||
| _(fill: e.g. notary purpose amendment)_ | binky-control | _(id)_ | Red |
|
||
| _(fill: e.g. DUO multi-week receipt backlog)_ | binky-control | _(id)_ | Orange |
|
||
|
||
Every row here must point at a **live work record**, not prose. A gap with no
|
||
record is not an exception, it is an unfinished handoff — route it through
|
||
UPC-WP-0002-T04 first.
|
||
|
||
## After the decision
|
||
|
||
1. Founder marks S1 (or records exceptions) in `binky-control/SuccessMilestones.md`.
|
||
2. Update `architecture/gate-map.md` G1 row → `met` or `partial` + explicit residuals.
|
||
3. Update `evidence/g1-oh-batch.md` gate-impact table.
|
||
4. Close UPC-WP-0002-T03; hand remaining non-G1 residuals to T04.
|