prj-unattended-progress-com.../workplans/UPC-WP-0001-foundation.md
tegwick 0fb5c7a8b5 Complete UPC-WP-0001 foundation: gate map, inventory, next WPs.
Deliver G1–G9 gate-to-evidence and child-workplan maps, baseline inventory
from binky-control, and proposed UPC-WP-0002–0004 for vessel, load, and
revenue clusters. Mark foundation finished with DoD-Ok.
2026-08-11 02:30:48 +02:00

4.7 KiB
Raw Blame History

id type title domain repo status owner topic_slug repo_goal_id created updated quality_dor quality_dor_at quality_dor_by quality_dor_note quality_dod quality_dod_at quality_dod_by quality_dod_note state_hub_workstream_id
UPC-WP-0001 workplan Project foundation and gate map infotech prj-unattended-progress-company finished bernd infotech 79a2b057-b765-47ad-b5d9-c1bbc49eba43 2026-08-09 2026-08-11 DoR-Ok 2026-08-09 grok Foundation plan maps GOAL.md gates G1G9 to evidence and child repos; no production code in this WP. DoD-Ok 2026-08-11 grok Gate map, baseline inventory, child map, and three next UPC-WP drafts (00020004) delivered; residuals are live proposed workplans. 8dad7f23-9b0a-4b0e-9dfb-c59ae6d9c86f

Project foundation and gate map

Goal

Stand up this prj- repository as the coordination surface for the active repo goal: make Binky Hedgehog GmbH a profitable, self-organizing company with minimal CEO time and governance.

Deliverables of this workplan:

  1. Project files and State Hub registration are complete and consistent.
  2. A gate map links every GOAL.md success gate (G1G9) to evidence homes and participating repos — without duplicating child task lists.
  3. A child-workplan map records existing and missing implementation streams (especially in binky-control).
  4. The next coordination workplans are scoped so unattended progress can start against open gates.

Implementation remains in participating repositories. This workplan only coordinates.

Register project and establish GOAL as hub goal

id: UPC-WP-0001-T01
status: done
priority: high
state_hub_task_id: "2bec18da-5407-4048-9238-c7998253e580"

Create GOAL.md (prj-flavor), .repo-classification.yaml, SCOPE.md, AGENTS.md, and genesis history. Register the repo in State Hub and create the active repo goal from GOAL.md.

Result (2026-08-09):

  • Repo slug prj-unattended-progress-company registered (01cc54ec-178d-4547-b17d-24bd97997987), domain infotech, category project.
  • Active repo goal 79a2b057-b765-47ad-b5d9-c1bbc49eba43Profitable self-organizing Binky Hedgehog GmbH with minimal CEO time and governance.
  • Progress event recorded for registration + goal create.

Build the gate-to-evidence map

id: UPC-WP-0001-T02
status: done
priority: high
state_hub_task_id: "dee415cd-7eb0-4698-98bb-e1d437c27d2e"

Produce architecture/gate-map.md (or inventory/gate-map.yaml if more machine-friendly) covering every success gate G1G9.

Result (2026-08-11): architecture/gate-map.md — G1G9 with owners, child IDs, evidence pointers, status (open/partial/met), blockers, and cluster sequencing (vessel / unattended+load / revenue / governance).

Inventory current company state against G1G9

id: UPC-WP-0001-T03
status: done
priority: high
state_hub_task_id: "34155b30-2ebb-4093-9bed-2d6f590072c2"

From binky-control (and only other repos when the gate demands it), write a baseline snapshot under inventory/.

Result (2026-08-11): inventory/baseline-g1-g9.md — G1 partial (OH batch); G2 near met; G3 strong/partial; G4 open (no measurement); G5G7 open (offer drafted only); G8 partial; G9 endgame. Top leverage: drain OH batch, then publish offer, measure load, package G3 acceptance.

Establish the child-workplan map

id: UPC-WP-0001-T04
status: done
priority: high
state_hub_task_id: "26017f0a-9df9-4994-9c2b-fd1963ed460e"

Create architecture/child-workplan-map.md listing existing children, gaps, and recommended next streams.

Result (2026-08-11): architecture/child-workplan-map.md — BINKY-WP-0001…0007 mapped to gates; OH/AWQ live surfaces; gaps for vessel close-out WP, G4 metric, offer publish, G3 acceptance pack. SCOPE participating table unchanged.

Scope the next project coordination workplans

id: UPC-WP-0001-T05
status: done
priority: medium
state_hub_task_id: "29f71041-ca6a-4e39-8090-aa59fa1d93d2"

Based on T02T04, draft the next UPC-WP-* plans for open gate clusters.

Result (2026-08-11): Live proposed workplans (residuals of this foundation):

ID Cluster Status
UPC-WP-0002 Company vessel close-out (G1 + residual G2/G8) proposed
UPC-WP-0003 Unattended dogfood + founder-load (G3G4) proposed
UPC-WP-0004 First offer and paid revenue (G5G6) proposed

Done when

  • T01 done; hub/file IDs consistent after fix-consistency.
  • Gate map, baseline inventory, and child-workplan map cover G1G9.
  • Next UPC-WP-* drafted so foundation leaves no unowned vacuum.
  • Residuals are live workplans (00020004), not prose-only leftovers.