Deliver G1–G9 gate-to-evidence and child-workplan maps, baseline inventory from binky-control, and proposed UPC-WP-0002–0004 for vessel, load, and revenue clusters. Mark foundation finished with DoD-Ok.
4.7 KiB
| id | type | title | domain | repo | status | owner | topic_slug | repo_goal_id | created | updated | quality_dor | quality_dor_at | quality_dor_by | quality_dor_note | quality_dod | quality_dod_at | quality_dod_by | quality_dod_note | state_hub_workstream_id |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| UPC-WP-0001 | workplan | Project foundation and gate map | infotech | prj-unattended-progress-company | finished | bernd | infotech | 79a2b057-b765-47ad-b5d9-c1bbc49eba43 | 2026-08-09 | 2026-08-11 | DoR-Ok | 2026-08-09 | grok | Foundation plan maps GOAL.md gates G1–G9 to evidence and child repos; no production code in this WP. | DoD-Ok | 2026-08-11 | grok | Gate map, baseline inventory, child map, and three next UPC-WP drafts (0002–0004) delivered; residuals are live proposed workplans. | 8dad7f23-9b0a-4b0e-9dfb-c59ae6d9c86f |
Project foundation and gate map
Goal
Stand up this prj- repository as the coordination surface for the active
repo goal: make Binky Hedgehog GmbH a profitable, self-organizing company
with minimal CEO time and governance.
Deliverables of this workplan:
- Project files and State Hub registration are complete and consistent.
- A gate map links every
GOAL.mdsuccess gate (G1–G9) to evidence homes and participating repos — without duplicating child task lists. - A child-workplan map records existing and missing implementation streams
(especially in
binky-control). - The next coordination workplans are scoped so unattended progress can start against open gates.
Implementation remains in participating repositories. This workplan only coordinates.
Register project and establish GOAL as hub goal
id: UPC-WP-0001-T01
status: done
priority: high
state_hub_task_id: "2bec18da-5407-4048-9238-c7998253e580"
Create GOAL.md (prj-flavor), .repo-classification.yaml, SCOPE.md,
AGENTS.md, and genesis history. Register the repo in State Hub and create
the active repo goal from GOAL.md.
Result (2026-08-09):
- Repo slug
prj-unattended-progress-companyregistered (01cc54ec-178d-4547-b17d-24bd97997987), domaininfotech, categoryproject. - Active repo goal
79a2b057-b765-47ad-b5d9-c1bbc49eba43— Profitable self-organizing Binky Hedgehog GmbH with minimal CEO time and governance. - Progress event recorded for registration + goal create.
Build the gate-to-evidence map
id: UPC-WP-0001-T02
status: done
priority: high
state_hub_task_id: "dee415cd-7eb0-4698-98bb-e1d437c27d2e"
Produce architecture/gate-map.md (or inventory/gate-map.yaml if more
machine-friendly) covering every success gate G1–G9.
Result (2026-08-11): architecture/gate-map.md — G1–G9 with owners,
child IDs, evidence pointers, status (open/partial/met), blockers, and
cluster sequencing (vessel / unattended+load / revenue / governance).
Inventory current company state against G1–G9
id: UPC-WP-0001-T03
status: done
priority: high
state_hub_task_id: "34155b30-2ebb-4093-9bed-2d6f590072c2"
From binky-control (and only other repos when the gate demands it), write a
baseline snapshot under inventory/.
Result (2026-08-11): inventory/baseline-g1-g9.md — G1 partial (OH batch);
G2 near met; G3 strong/partial; G4 open (no measurement); G5–G7 open (offer
drafted only); G8 partial; G9 endgame. Top leverage: drain OH batch, then
publish offer, measure load, package G3 acceptance.
Establish the child-workplan map
id: UPC-WP-0001-T04
status: done
priority: high
state_hub_task_id: "26017f0a-9df9-4994-9c2b-fd1963ed460e"
Create architecture/child-workplan-map.md listing existing children, gaps,
and recommended next streams.
Result (2026-08-11): architecture/child-workplan-map.md — BINKY-WP-0001…0007
mapped to gates; OH/AWQ live surfaces; gaps for vessel close-out WP, G4 metric,
offer publish, G3 acceptance pack. SCOPE participating table unchanged.
Scope the next project coordination workplans
id: UPC-WP-0001-T05
status: done
priority: medium
state_hub_task_id: "29f71041-ca6a-4e39-8090-aa59fa1d93d2"
Based on T02–T04, draft the next UPC-WP-* plans for open gate clusters.
Result (2026-08-11): Live proposed workplans (residuals of this foundation):
| ID | Cluster | Status |
|---|---|---|
| UPC-WP-0002 | Company vessel close-out (G1 + residual G2/G8) | proposed |
| UPC-WP-0003 | Unattended dogfood + founder-load (G3–G4) | proposed |
| UPC-WP-0004 | First offer and paid revenue (G5–G6) | proposed |
Done when
- T01 done; hub/file IDs consistent after fix-consistency.
- Gate map, baseline inventory, and child-workplan map cover G1–G9.
- Next UPC-WP-* drafted so foundation leaves no unowned vacuum.
- Residuals are live workplans (0002–0004), not prose-only leftovers.