prj-unattended-progress-com.../workplans/UPC-WP-0001-foundation.md
tegwick 0fb5c7a8b5 Complete UPC-WP-0001 foundation: gate map, inventory, next WPs.
Deliver G1–G9 gate-to-evidence and child-workplan maps, baseline inventory
from binky-control, and proposed UPC-WP-0002–0004 for vessel, load, and
revenue clusters. Mark foundation finished with DoD-Ok.
2026-08-11 02:30:48 +02:00

142 lines
4.7 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters

This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.

---
id: UPC-WP-0001
type: workplan
title: "Project foundation and gate map"
domain: infotech
repo: prj-unattended-progress-company
status: finished
owner: bernd
topic_slug: infotech
repo_goal_id: "79a2b057-b765-47ad-b5d9-c1bbc49eba43"
created: "2026-08-09"
updated: "2026-08-11"
quality_dor: DoR-Ok
quality_dor_at: "2026-08-09"
quality_dor_by: "grok"
quality_dor_note: "Foundation plan maps GOAL.md gates G1G9 to evidence and child repos; no production code in this WP."
quality_dod: DoD-Ok
quality_dod_at: "2026-08-11"
quality_dod_by: "grok"
quality_dod_note: "Gate map, baseline inventory, child map, and three next UPC-WP drafts (00020004) delivered; residuals are live proposed workplans."
state_hub_workstream_id: "8dad7f23-9b0a-4b0e-9dfb-c59ae6d9c86f"
---
# Project foundation and gate map
## Goal
Stand up this `prj-` repository as the coordination surface for the active
repo goal: make **Binky Hedgehog GmbH** a profitable, self-organizing company
with minimal CEO time and governance.
Deliverables of this workplan:
1. Project files and State Hub registration are complete and consistent.
2. A gate map links every `GOAL.md` success gate (G1G9) to evidence homes and
participating repos — without duplicating child task lists.
3. A child-workplan map records existing and missing implementation streams
(especially in `binky-control`).
4. The next coordination workplans are scoped so unattended progress can start
against open gates.
Implementation remains in participating repositories. This workplan only
coordinates.
## Register project and establish GOAL as hub goal
```task
id: UPC-WP-0001-T01
status: done
priority: high
state_hub_task_id: "2bec18da-5407-4048-9238-c7998253e580"
```
Create `GOAL.md` (prj-flavor), `.repo-classification.yaml`, `SCOPE.md`,
`AGENTS.md`, and genesis history. Register the repo in State Hub and create
the active repo goal from `GOAL.md`.
**Result (2026-08-09):**
- Repo slug `prj-unattended-progress-company` registered
(`01cc54ec-178d-4547-b17d-24bd97997987`), domain `infotech`, category
`project`.
- Active repo goal
`79a2b057-b765-47ad-b5d9-c1bbc49eba43`
*Profitable self-organizing Binky Hedgehog GmbH with minimal CEO time and
governance*.
- Progress event recorded for registration + goal create.
## Build the gate-to-evidence map
```task
id: UPC-WP-0001-T02
status: done
priority: high
state_hub_task_id: "dee415cd-7eb0-4698-98bb-e1d437c27d2e"
```
Produce `architecture/gate-map.md` (or `inventory/gate-map.yaml` if more
machine-friendly) covering every success gate G1G9.
**Result (2026-08-11):** `architecture/gate-map.md` — G1G9 with owners,
child IDs, evidence pointers, status (`open`/`partial`/`met`), blockers, and
cluster sequencing (vessel / unattended+load / revenue / governance).
## Inventory current company state against G1G9
```task
id: UPC-WP-0001-T03
status: done
priority: high
state_hub_task_id: "34155b30-2ebb-4093-9bed-2d6f590072c2"
```
From `binky-control` (and only other repos when the gate demands it), write a
baseline snapshot under `inventory/`.
**Result (2026-08-11):** `inventory/baseline-g1-g9.md` — G1 partial (OH batch);
G2 near met; G3 strong/partial; G4 open (no measurement); G5G7 open (offer
drafted only); G8 partial; G9 endgame. Top leverage: drain OH batch, then
publish offer, measure load, package G3 acceptance.
## Establish the child-workplan map
```task
id: UPC-WP-0001-T04
status: done
priority: high
state_hub_task_id: "26017f0a-9df9-4994-9c2b-fd1963ed460e"
```
Create `architecture/child-workplan-map.md` listing existing children, gaps,
and recommended next streams.
**Result (2026-08-11):** `architecture/child-workplan-map.md` — BINKY-WP-0001…0007
mapped to gates; OH/AWQ live surfaces; gaps for vessel close-out WP, G4 metric,
offer publish, G3 acceptance pack. SCOPE participating table unchanged.
## Scope the next project coordination workplans
```task
id: UPC-WP-0001-T05
status: done
priority: medium
state_hub_task_id: "29f71041-ca6a-4e39-8090-aa59fa1d93d2"
```
Based on T02T04, draft the next `UPC-WP-*` plans for open gate clusters.
**Result (2026-08-11):** Live proposed workplans (residuals of this foundation):
| ID | Cluster | Status |
| --- | --- | --- |
| UPC-WP-0002 | Company vessel close-out (G1 + residual G2/G8) | proposed |
| UPC-WP-0003 | Unattended dogfood + founder-load (G3G4) | proposed |
| UPC-WP-0004 | First offer and paid revenue (G5G6) | proposed |
## Done when
- [x] T01 done; hub/file IDs consistent after fix-consistency.
- [x] Gate map, baseline inventory, and child-workplan map cover G1G9.
- [x] Next UPC-WP-* drafted so foundation leaves no unowned vacuum.
- [x] Residuals are live workplans (00020004), not prose-only leftovers.