prj-unattended-progress-com.../architecture/child-workplan-map.md
tegwick cd53434e18 Activate UPC-WP-0002 and scaffold G1 OH batch evidence.
Promote vessel close-out to active, add evidence/g1-oh-batch.md with preflight
for OH-2026-001–005, and point gate/child maps at the live command-day path.
2026-08-12 00:47:22 +02:00

3.9 KiB
Raw Blame History

id type repo parent_workplan created reviewed
UPC-CHILD-MAP-0001 child-workplan-map prj-unattended-progress-company UPC-WP-0001 2026-08-11 2026-08-11

Child-workplan map

Cross-repo implementation streams that advance GOAL.md gates. This project links them; it does not copy their tasks.

Existing child workplans (binky-control)

ID Title Status Gates advanced Notes
BINKY-WP-0001 Bootstrap State Hub integration done G2 Control-plane hub wiring
BINKY-WP-0002 Operating Kernel Bootstrap done G1G3, G5 prep Canon, audit dogfood, offer draft, rhythm
BINKY-WP-0003 Autopilot Execution & Recurring Rhythm done G2G3, G8 Email custody prep, costs, cron bridge → activity-core
BINKY-WP-0004 Workstation-Independent Executor finished G3 Removes laptop from critical path
BINKY-WP-0005 Qonto MCP integration finished G1, G6 readiness Bank as agent-readable source
BINKY-WP-0006 Railiance rhythm (llm-connect) finished G3 Unattended rhythm without host coding agent
BINKY-WP-0007 Qonto Governed Assistant Phase 1 finished G1, G6 readiness Policy kernel + REST

Live queues / loops (not workplans, still child work)

Record Repo Gates Role
OH-2026-001…005 binky-control G1, G8 Prepared Orange batch — primary G1 execution surface
AWQ-002,003,006,012 binky-control G1G2 residual, G5 prep Open/optional autopilot residual
Daily/weekly briefs binky-control G2G3, G8 Operating rhythm evidence
REIN-A-0003 / ops_run weekly review railiance / activity-core G3 Production unattended proof
Repo Role for this project Gate touch
binky-control Company canon + control plane All
ops-warden Tenant secret custody (e.g. company email) G2G3, G8
activity-core / llm-connect / Railiance Unattended execution substrate G3G4
the-custodian Fleet standards (prj-flavor, work records) G9 / process
state-hub Coordination index only G2
fin-hub (if finance steward expands) Cash/runway stewardship G1, G6G7

No change required to SCOPE.md participating table for this snapshot; ops-warden and ecosystem pillars already listed.

Gaps (no live child workplan)

Gap Gates Recommended child stream (owning repo)
Phase 1 admin close-out as explicit WP (or OH campaign completion record) G1 binky-control: either mark OH campaign done with evidence or open BINKY-WP-0008 “Phase 1 vessel close-out”
Founder-load measurement (≥30 days) G4 binky-control: light metric + brief annotation convention; optional activity-core signal later
Offer publish decision package + public surface G5 binky-control: DecisionQueue Yellow package + website/domain residual
First paid engagement delivery G6G7 Product/service repo or binky delivery WP after publish
G3 formal acceptance pack G3 This project evidence/ + founder S3 mark in SuccessMilestones
  1. binky-control — vessel close-out: finish OH-2026-001…005 with evidence; update Reactivation Plan Phase 1 / S1.
  2. binky-control — publish OK Audit: Yellow decision package + public one-pager.
  3. binky-control — founder-load log: 30-day envelope measurement for G4.
  4. This project — G3 evidence pack: link audit + ops_run + rhythm WPs; request S3 status flip.

Project coordination workplans

ID Status Cluster
UPC-WP-0001 finished Foundation (this map)
UPC-WP-0002 active Company vessel close-out (G1 + residual G2/G8); evidence evidence/g1-oh-batch.md
UPC-WP-0003 proposed Unattended dogfood + founder-load (G3G4)
UPC-WP-0004 proposed First offer + paid revenue (G5G6)