Reef Production Readiness Contract

Date: 2026-07-26 Status: Adopted for the second implementation wave

Purpose

Prevent a topology declaration from being mistaken for permission to run a critical workload.

hosts_rail and binds_rapp describe intended composition. Production use requires explicit readiness evidence.

Admission States

Every hosted rail and bound rapp uses:

  • declared
  • installed
  • verified
  • production-approved
  • deprecated

Promotion is monotonic only while its evidence remains current. Failed or expired evidence returns the binding to the last proven state.

Required Reef Evidence

Before a rail becomes verified, the reef must provide machine-readable evidence for:

  • substrate and Kubernetes version compatibility
  • control-plane and workload capacity with documented headroom
  • ingress, DNS, and certificate path
  • storage and stateful-workload constraints
  • workload identity and approved secret-delivery path
  • network isolation and egress enforcement
  • logs, metrics, traces, alerting, and audit delivery
  • backup, restore, and rollback path
  • upgrade and maintenance ownership
  • failure-domain and recovery assumptions

Critical Workload Gate

Before a critical, internet-facing, or high-value-credential workload becomes production-approved, its binding must additionally record:

  • threat-model reference
  • availability, cold-start, and recovery objectives
  • identity, secret revocation, and audit evidence
  • negative authorization and network tests
  • rollback and temporary-fallback rules
  • accepted residual risks and their owner

The single-server and shared-control-plane risks of reef-railiance must be explicitly accepted or mitigated for rapp-qonto; the reef name or high criticality label is not evidence by itself.

Mixed-Rail Rule

reef-railiance may host rail-kubernetes and rail-knative during the second wave, while rail-kubernetes remains primary.

Reassess or split the reef when any of these triggers occurs:

  • incompatible maintenance or upgrade windows
  • inability to meet a critical workload recovery objective
  • control-plane or workload resource contention
  • materially different network or tenant-isolation requirements
  • independent scaling or availability requirements
  • failure in one rail cannot be contained from the other
  • premium-security or regulatory policy requires a separate boundary

Automation Requirement

Readiness evidence should be produced by idempotent probes and stored as source-linked, timestamped records. Agents may execute and reconcile the probes. Human approval should consume the evidence only where policy requires explicit risk acceptance; it should not be used as a substitute for tests.