Maintainer (Bernd) accepted 2026-07-30: estimated_effort_days/daily_rate driven directly by commit-clustered human interaction time; approved_direct_costs from real metered AI token cost (get_token_summary); workplan/task-volume and file/line-size metrics serve only as a sanity check on the human-time estimate, never their own dollar figure; Target Multiple remains a human classification. Candidate B recorded as the considered, not-adopted alternative.
5.3 KiB
| id | type | title | domain | repo | status | owner | topic_slug | created | updated | state_hub_workstream_id |
|---|---|---|---|---|---|---|---|---|---|---|
| TREV-WP-0010 | workplan | Development Effort Calculator | infotech | target-revenue | active | claude | infotech | 2026-07-30 | 2026-07-30 | 2cabf156-dbdf-4e46-a213-fb76800702df |
Development Effort Calculator
Turns measurable repo activity (human interaction time, workplan/task
volume, file/line complexity, AI token cost) into target_basis values
(specs/PhaseManifestSpecification.md), which combined with a human
Target Multiple classification (10x/100x/1000x) produces a proposed
Initial Target via the framework's own existing formula
(specs/TargetRevenueFrameworkCore.md §1.4) — not a new formula. This
calculator is a value-input tool feeding that existing formula, not a
competing valuation methodology.
Split from the former combined TREV-WP-0009-control-plane-and-effort-calculator.md
(2026-07-30) — this deliverable has its own formula decision and
implementation arc, independent of the Target Revenue Control Plane
(workplans/TREV-WP-0009-target-revenue-control-plane.md), even though
the Control Plane's Phase-registration flow is expected to consume this
calculator's output once both exist.
Does not include: declaring any real Phase for any repo, or choosing
a repo's Target Multiple classification unilaterally — per
specs/DevelopmentEffortCalculatorConcept.md §4, that classification
remains a human judgment call the calculator can inform but not make.
Concept: specs/DevelopmentEffortCalculatorConcept.md.
Formula decision (human gate)
id: TREV-WP-0010-T01
status: done
priority: high
human_accept_required: true
human_accepted_by: Bernd
human_accepted_at: "2026-07-30"
state_hub_task_id: "a3e1acbf-8659-4745-b595-ba8c2728f3b5"
specs/DevelopmentEffortCalculatorConcept.md §3 presents two combination
strategies without choosing between them:
- Candidate A (labor-cost-anchored, recommended v0 default) — human
time drives
estimated_effort_days/daily_ratedirectly; AI token cost becomesapproved_direct_costs(a real, metered direct cost); workplan/task-volume and repo-size metrics are a sanity check/adjustment on the human-time estimate, not a separate dollar figure. - Candidate B (composite-index-anchored) — all four metric families scored into one weighted complexity index, converted to dollars via a declared $-per-unit rate.
Confirm one as the adopted v0 approach (or propose a refinement), per the
same human-gate pattern already used for the degeneration policy formula
(workplans/TREV-WP-0007-degeneration-policy-and-canonical-profiles.md T02).
Agents may prepare a recommendation and leave this todo.
Accepted 2026-07-30 by the maintainer (Bernd): Candidate A
(labor-cost-anchored) confirmed as the adopted v0 formula.
estimated_effort_days and daily_rate are driven directly by
commit-clustered human interaction time; AI token cost
(get_token_summary) becomes approved_direct_costs; workplan/task-
volume and file/line-size metrics serve only as a sanity check/adjustment
on the human-time estimate, never their own dollar figure; the Target
Multiple remains a human classification, not computed. T02 implements
this formula, not Candidate B or a hybrid.
Implement the calculator
id: TREV-WP-0010-T02
status: todo
priority: high
state_hub_task_id: "b5fb46ea-b737-495f-82b8-5e10f0032cb5"
Using T01's confirmed formula, implement data collection for each metric
family and the combination formula itself, producing target_basis
field values ready to drop into a Phase Manifest:
- Human interaction time — v0 default: commit-timestamp clustering (session-gap grouping over git history), explicitly a floor estimate, not a true count (concept §2a).
- Workplan/task volume — counts via state hub
list_tasks/list_workplansscoped to the repo, or directworkplans/directory inspection where hub coverage is thin (concept §2b). - File/line complexity — raw counts with generated/vendored-path exclusion (concept §2c's flagged distortion: dependency trees, lockfiles, and generated files must not inflate this signal).
- AI token cost —
get_token_summary(scope="repo", id=...), the strongest, least speculative input since it is a real metered cost, not a proxy (concept §2d).
Output must show its work (which inputs produced which numbers) — a
black-box dollar figure with no visible derivation would undermine the
"transparent, non-gameable" goal (specs/TargetRevenueLicenseConcept.md
§4.6) this whole framework is built around.
Apply calculator to real candidate repos
id: TREV-WP-0010-T03
status: todo
priority: medium
state_hub_task_id: "74a3db97-1b66-4514-895a-bb9c385008aa"
Once T02 is implemented, run it against the real candidates already
identified (specs/PilotPhaseCandidateSurvey.md: net-kingdom's
NK-WP-0002, railiance-apps's vergabe-teilnahme, and
info-tech-canon's service surface) to produce proposed,
calculator-derived target_basis values, replacing the hand-picked
illustrative figures currently in examples/pilot-candidates/*/manifest.json.
This remains draft/non-binding — updating a draft manifest's numbers is
not a Phase declaration, and does not touch
workplans/TREV-WP-0008-governance-and-pilot-rollout.md T05's own gate.