target-revenue/workplans/TREV-WP-0010-development-effort-calculator.md
tegwick 660761fc71 Accept Candidate A for WP-0010-T01: labor-cost-anchored calculator formula
Maintainer (Bernd) accepted 2026-07-30: estimated_effort_days/daily_rate
driven directly by commit-clustered human interaction time;
approved_direct_costs from real metered AI token cost
(get_token_summary); workplan/task-volume and file/line-size metrics
serve only as a sanity check on the human-time estimate, never their
own dollar figure; Target Multiple remains a human classification.
Candidate B recorded as the considered, not-adopted alternative.
2026-07-30 12:58:53 +02:00

5.3 KiB

id type title domain repo status owner topic_slug created updated state_hub_workstream_id
TREV-WP-0010 workplan Development Effort Calculator infotech target-revenue active claude infotech 2026-07-30 2026-07-30 2cabf156-dbdf-4e46-a213-fb76800702df

Development Effort Calculator

Turns measurable repo activity (human interaction time, workplan/task volume, file/line complexity, AI token cost) into target_basis values (specs/PhaseManifestSpecification.md), which combined with a human Target Multiple classification (10x/100x/1000x) produces a proposed Initial Target via the framework's own existing formula (specs/TargetRevenueFrameworkCore.md §1.4) — not a new formula. This calculator is a value-input tool feeding that existing formula, not a competing valuation methodology.

Split from the former combined TREV-WP-0009-control-plane-and-effort-calculator.md (2026-07-30) — this deliverable has its own formula decision and implementation arc, independent of the Target Revenue Control Plane (workplans/TREV-WP-0009-target-revenue-control-plane.md), even though the Control Plane's Phase-registration flow is expected to consume this calculator's output once both exist.

Does not include: declaring any real Phase for any repo, or choosing a repo's Target Multiple classification unilaterally — per specs/DevelopmentEffortCalculatorConcept.md §4, that classification remains a human judgment call the calculator can inform but not make.

Concept: specs/DevelopmentEffortCalculatorConcept.md.

Formula decision (human gate)

id: TREV-WP-0010-T01
status: done
priority: high
human_accept_required: true
human_accepted_by: Bernd
human_accepted_at: "2026-07-30"
state_hub_task_id: "a3e1acbf-8659-4745-b595-ba8c2728f3b5"

specs/DevelopmentEffortCalculatorConcept.md §3 presents two combination strategies without choosing between them:

  • Candidate A (labor-cost-anchored, recommended v0 default) — human time drives estimated_effort_days/daily_rate directly; AI token cost becomes approved_direct_costs (a real, metered direct cost); workplan/task-volume and repo-size metrics are a sanity check/adjustment on the human-time estimate, not a separate dollar figure.
  • Candidate B (composite-index-anchored) — all four metric families scored into one weighted complexity index, converted to dollars via a declared $-per-unit rate.

Confirm one as the adopted v0 approach (or propose a refinement), per the same human-gate pattern already used for the degeneration policy formula (workplans/TREV-WP-0007-degeneration-policy-and-canonical-profiles.md T02). Agents may prepare a recommendation and leave this todo.

Accepted 2026-07-30 by the maintainer (Bernd): Candidate A (labor-cost-anchored) confirmed as the adopted v0 formula. estimated_effort_days and daily_rate are driven directly by commit-clustered human interaction time; AI token cost (get_token_summary) becomes approved_direct_costs; workplan/task- volume and file/line-size metrics serve only as a sanity check/adjustment on the human-time estimate, never their own dollar figure; the Target Multiple remains a human classification, not computed. T02 implements this formula, not Candidate B or a hybrid.

Implement the calculator

id: TREV-WP-0010-T02
status: todo
priority: high
state_hub_task_id: "b5fb46ea-b737-495f-82b8-5e10f0032cb5"

Using T01's confirmed formula, implement data collection for each metric family and the combination formula itself, producing target_basis field values ready to drop into a Phase Manifest:

  • Human interaction time — v0 default: commit-timestamp clustering (session-gap grouping over git history), explicitly a floor estimate, not a true count (concept §2a).
  • Workplan/task volume — counts via state hub list_tasks/ list_workplans scoped to the repo, or direct workplans/ directory inspection where hub coverage is thin (concept §2b).
  • File/line complexity — raw counts with generated/vendored-path exclusion (concept §2c's flagged distortion: dependency trees, lockfiles, and generated files must not inflate this signal).
  • AI token costget_token_summary(scope="repo", id=...), the strongest, least speculative input since it is a real metered cost, not a proxy (concept §2d).

Output must show its work (which inputs produced which numbers) — a black-box dollar figure with no visible derivation would undermine the "transparent, non-gameable" goal (specs/TargetRevenueLicenseConcept.md §4.6) this whole framework is built around.

Apply calculator to real candidate repos

id: TREV-WP-0010-T03
status: todo
priority: medium
state_hub_task_id: "74a3db97-1b66-4514-895a-bb9c385008aa"

Once T02 is implemented, run it against the real candidates already identified (specs/PilotPhaseCandidateSurvey.md: net-kingdom's NK-WP-0002, railiance-apps's vergabe-teilnahme, and info-tech-canon's service surface) to produce proposed, calculator-derived target_basis values, replacing the hand-picked illustrative figures currently in examples/pilot-candidates/*/manifest.json. This remains draft/non-binding — updating a draft manifest's numbers is not a Phase declaration, and does not touch workplans/TREV-WP-0008-governance-and-pilot-rollout.md T05's own gate.