specs/policies/linear-longstop-v0.md extracted from OpenQuestions-WorkingDefaults.md Q7's prose, with policy_id/title frontmatter -- Q7 now records only the adoption decision, pointing at this file for the formula itself. Six specs/profiles/*.md files extracted from CanonicalMonetizationProfiles.md's per-profile sections (#1-6), each with extension_id/title frontmatter matching the ids already used in real Phase Manifests. CanonicalMonetizationProfiles.md keeps the cross-profile summary and non-goals sections, now pointing at the extracted files instead of containing their content. DevelopmentEffortCalculatorConcept.md gets calculator_id/revision/title frontmatter for consistency, no move (already conformed as one file per model). Checked for stale cross-references before editing -- nothing in the repo links to the removed section anchors. Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
1.6 KiB
| policy_id | title |
|---|---|
| trsl:policy:linear-longstop-v0@1.0 | Linear Longstop v0 |
Linear Longstop v0
Adopted 2026-07-29
(workplans/TREV-WP-0007-degeneration-policy-and-canonical-profiles.md
T02, maintainer-accepted): confirmed as the v1 norm for the first pilot
cohort, not merely a Stage 0 pilot placeholder.
Definition
-
Remission accrues only by time toward a declared Longstop Date (
specs/OpenQuestions-WorkingDefaults.mdQ8). -
Between Phase activation
t0and LongstoptL,R(t) = T0 × clamp((t − t0)/(tL − t0), 0, 1)
with discrete ledger
remission-creditentries computed on a published schedule (e.g. daily or monthly UTC), or a single full remission at longstop for minimal implementations. -
Development Credit does not change the remission schedule in v0 (no progress-sensitive boost/pause).
Status
Not yet automated — see
workplans/TREV-WP-0013-remission-credit-automation.md. Nothing in this
codebase currently computes or writes these entries; this file is the
formula those entries must be checkable against once that workplan lands.
Superseded / next iteration
specs/TargetDegenerationPolicyResearch.md (T01) proposes a candidate
trsl:policy:progress-paused-longstop-v1 (a 90-day rolling "quiet
period" pause on Remission Credit during active Development Credit
periods), research complete but not adopted. Explicitly recommends
not adopting a diversity-of-payers factor (no gaming-resistant signal
exists yet). Named as the next iteration, to be revisited once real
pilot Development Credit data exists — not required before pilot Phases
proceed under v0.