• Joined on 2026-07-04
tegwick pushed to main at coulomb/clay-borg 2026-07-31 16:25:23 +00:00
dfd0d6d56b Activate CB-WP-0006; T01 in progress
tegwick pushed to main at coulomb/clay-borg 2026-07-31 16:08:37 +00:00
245d7fd3e5 Condense CB-WP-0005 T02's note to a pointer at CB-EV-0004
tegwick pushed to main at coulomb/clay-borg 2026-07-31 16:07:34 +00:00
3f3d437417 Fix a fabricated UUID suffix in CB-WP-0005 T06
tegwick pushed to main at coulomb/clay-borg 2026-07-31 16:06:23 +00:00
592cd23836 chore: mark CB-WP-0005 T07/T08 done; workplan closed
2fe577213c CB-WP-0005 T08: attribution note — one commit, one task id
fd19f4e878 CB-WP-0005 T07/T08: control loop, retrospective, InnerLoop v1.4
Compare 3 commits »
tegwick pushed to main at coulomb/clay-borg 2026-07-31 15:58:39 +00:00
e2a2957b3a Fix loadability, and put the deferred analysis where the work is
tegwick pushed to main at coulomb/clay-borg 2026-07-31 15:56:58 +00:00
56c0c34d2c Sync hub IDs for CB-WP-0006; T04-T06 cancel not deferred
tegwick pushed to main at coulomb/clay-borg 2026-07-31 15:56:37 +00:00
74d9b8ef73 CB-WP-0006: instrument the acceptance table, then implement
ed91ec198e chore: mark CB-WP-0005 T03 done (measured: 7 responses, $1.49, opus-5)
145611e3b6 CB-WP-0005 T03: correct the record, and defer Phase C
Compare 3 commits »
tegwick pushed to main at coulomb/clay-borg 2026-07-31 15:27:33 +00:00
4e8d89f482 chore: mark CB-WP-0005 T02 done
e25bac3af3 CB-WP-0005 T02: M-D1-MUT — 4 of 14 acceptance rows are enforced
Compare 2 commits »
tegwick pushed to main at coulomb/clay-borg 2026-07-31 14:54:27 +00:00
235412423a chore: mark CB-WP-0005 T01 done (measured: 29 responses, $7.42, opus-5)
bb35fcb168 CB-WP-0005 T01: spec->code link over every numbered spec and every crate
Compare 2 commits »
tegwick pushed to main at coulomb/clay-borg 2026-07-31 12:25:57 +00:00
bd4423a8e4 Sync hub IDs for CB-WP-0005 and work-record index
tegwick pushed to main at coulomb/clay-borg 2026-07-31 12:25:46 +00:00
1bbbfc846f ADR-0005 + CB-WP-0005: count assertions, not names
923c2038be CB-RES-0004: the instruments count names, not assertions
Compare 2 commits »
tegwick pushed to main at coulomb/clay-borg 2026-07-31 08:29:20 +00:00
59b73c3e3d chore: regenerate WORK-RECORDS.md (fix-consistency C-33)
tegwick pushed to main at coulomb/clay-borg 2026-07-31 08:29:03 +00:00
c15d627aa0 chore: mark T03-T06 done (measured: $0.79 + $2.14 + $1.05 + $0.44, opus-5)
7b4d9e359f CB-WP-0004 T06: retrospective — what actually predicted the outcome
7a374d37d2 CB-WP-0004 T05: control loop — 6 points recovered, not 25-30
53c460c992 CB-WP-0004 T04: fact registry and make facts-check — DFD gets a gate
6281cd546e CB-WP-0004 T03: make status — one-shot orientation
Compare 8 commits »
tegwick pushed to main at coulomb/clay-borg 2026-07-31 07:50:25 +00:00
578dcbea78 Sync hub IDs for CB-WP-0004; drop duplicate frontmatter key
tegwick pushed to main at coulomb/clay-borg 2026-07-31 07:50:10 +00:00
7e21df378a CB-RES-0003 + CB-WP-0004: 38% of pass cost is mechanical turns
0c1eb9ecba ADR-0004: ratify AM-4a and AM-4b (maintainer decision)
Compare 2 commits »
tegwick pushed to main at coulomb/clay-borg 2026-07-31 07:31:57 +00:00
50f06a4d69 chore(consistency): refresh WORK-RECORDS.md
tegwick pushed to main at coulomb/clay-borg 2026-07-31 07:31:43 +00:00
0da376f7df T10: InnerLoop v1.2 — hardening does not converge, so optimize correction
e3d0df6690 T08: give provisional defaults an owner, a date, and a visible age
4580438f1c Replace the inlined price sheet with a pointer to the live file
9e30bbb2b3 T09: close the spec->code link mechanically (M-D1-LNK)
4fd6322e17 T03: point review at the harness, and state what review cannot catch
Compare 13 commits »
tegwick pushed to main at coulomb/clay-borg 2026-07-31 07:11:20 +00:00
06b3df6eca Revise CB-WP-0003 from CB-WP-0002's findings
tegwick pushed to main at coulomb/clay-borg 2026-07-31 06:54:38 +00:00
85b86e3805 chore(consistency): refresh WORK-RECORDS.md
tegwick pushed to main at coulomb/clay-borg 2026-07-31 06:54:23 +00:00
42180fbc57 T07: InnerLoop v1.1 — the instrument must emit its own target
2f086d26b6 T06: wire cost into the loop
c0eef604e8 T05: CB-EV-0002 — all 9 metrics met, and /compact measured at 3.1x
e008b1e787 T04: tools/cb-cost.py — and its positive control fires on first contact
900467017f T03: correct stale targets in the workplan ($92.87, AC-1)
Compare 10 commits »