Commit graph

10 commits

Author SHA1 Message Date
92838e13bd Fill OH-2026-004 prepared_material (Handelsregister verification prep)
All checks were successful
Work Records / validate (push) Successful in 9s
Was the only office-hour item with empty prepared_material. Adds the free
handelsregister.de retrieval path, the four fields to verify, the 2binky/
filing rule that keeps personal data out of repo evidence, and the explicit
Orange/Red boundary (reading is Orange; any notary-lane change is Red).

Prepared for UPC-WP-0002-T01.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-08-16 01:16:18 +02:00
143eef2f0d BINKY-WP-0005 finished: first Qonto pull and CostRunRate v2
All checks were successful
Work Records / validate (push) Successful in 13s
Live custody path tenants/binky/qonto-api (API_KEY/API_USER). First read-only
thirdparty pull (122 txs): desk 297.50 €/mo, Qonto plan 70.80 €/mo, main
balance 2185.94 €. Evidence under finance/; workplan status finished.
2026-07-21 21:42:10 +02:00
892c174b7a BINKY-WP-0005: OH/T05 runbook and lane-scaffold notes for Qonto MCP
Some checks failed
Work Records / validate (push) Has been cancelled
Prepare first-pull path after DEC-2026-004: copy-paste founder provision,
CCR apply, catalog promote, and CostRunRate update steps. T05 still waits
on Red-lane API key provision.
2026-07-21 21:26:25 +02:00
5f5f74c017 CUST-WP-0061-T05: retarget queue closures to WORK-RECORDS.md (generated)
All checks were successful
Work Records / validate (push) Successful in 22s
Convention change, not new code: closing an item now means setting its
terminal status (status: closed/resolved/done + outcome where
applicable) directly on the item's own yaml block in place, instead of
deleting it and hand-writing a bullet in a separate "Completed"/
"Resolved decisions" log. WORK-RECORDS.md (CUST-WP-0061-T04, generated
by fix-consistency's C-33) already lists every closed/resolved/done
record with status/lane/source -- that supersedes the hand-maintained
logs as the going-forward view.

- AutopilotWorkQueue.md: closing note added; "## Completed" relabeled
  "(historical -- pre-canon, 2026-07-21)", frozen as-is, nothing
  migrated or deleted
- DecisionQueue.md: closing note added -- its "## Resolved decisions"
  entries were already structured as in-place yaml blocks with
  status: resolved (ahead of AWQ's convention already), so this only
  clarifies the log is superseded going forward, no structural change
- OfficeHourQueue.md: closing note added -- items already live under
  "## Queued items" with status: queued|prepared|done in place, no
  separate log ever existed here
- OperatingRhythm.md: queue-hygiene checklist updated to describe
  in-place status transitions instead of "moved to the log"; added
  item 5 noting WORK-RECORDS.md needs no hand-maintenance

Re-ran fix-consistency: WORK-RECORDS.md content unchanged (correctly
idempotent -- these were prose-only edits, no yaml block content
changed).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-21 01:54:40 +02:00
ff579be1aa DEC-2026-004 approved: Qonto provisioning scheduled for next office hour
- DecisionQueue: DEC-2026-004 → resolved (approved, Bernd, 2026-07-19);
  hub decision a2a9de69 resolved
- OH-2026-003 enriched with the Red-lane provisioning steps (API key +
  bao kv put per integrations/qonto-mcp.md) for the dashboard visit
- qonto-mcp.md checklist: approval done, provisioning next

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-19 14:31:02 +02:00
06afc317f1 mail triage 2026-07-18 (founder) + AWQ-010 Qonto MCP integration
- E-mail triage log section added: jamesandersons spam resolved by
  founder; IHK Sommerfest invitation (August, founder calendar call);
  Qonto MCP mailing -> actionable
- AWQ-010: Qonto MCP integration prep (read scopes first, ops-warden/
  OpenBao credential lane, no native integrations; complements DUO =
  DATEV Unternehmen Online as main accounting, does not replace it)
- OH-2026-003 enriched: MCP integration is an argument FOR keeping
  Qonto; check API/plan prerequisites while in the dashboard

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-18 17:03:07 +02:00
4fb7cc7726 AWQ-009 done: Stripe webhook failure = stale Blobr preprod endpoint
DNS for api.preprod.blobr.dev (and blobr.dev) no longer resolves; Stripe
has sent monthly failure digests since April. Deletion is a founder
dashboard action, prepared as OH-2026-005 incl. webhook-endpoint
inventory while in the dashboard.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-17 10:54:52 +02:00
364cb35497 Prepare first Office-Hour Command Day runbook; close BINKY-WP-0002
Runbook for early-August command day (StB call, DUO backlog, Qonto review,
HR excerpt); all 4 office-hour items marked prepared; workplan status done
in file and hub (workstream finished).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-16 09:16:43 +02:00
3c2c47f20a Run OK Audit v0 on Binky itself (BINKY-WP-0002-T02)
Findings: filings current through JA 2024; no active StB mandate (RISK-006);
DUO backlog (RISK-007); 4 office-hour items queued; audit template v0 created;
first dogfood evidence entry logged.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-16 09:12:03 +02:00
d6d5cf1a1d Add company canon v0 and bootstrap workplan
Canon: INTENT, CompanyReactivationPlan, EcosystemMap, AutonomyPolicy,
SuccessMilestones, OfferCatalog, DogfoodPolicy, ControlLoopCatalog,
DecisionQueue, OfficeHourQueue, RiskRegister, plus founding exploration
in history/. Workplan BNKY-WP-0001 covers canon ratification, the first
internal audit, ecosystem cartography, flagship offer, and operating rhythm.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-16 02:48:50 +02:00