Commit graph

13 commits

Author SHA1 Message Date
d2f68f0f53 BINKY-WP-0003-T02: OK audit template v1 (AWQ-001)
Company-agnostic flagship-offer template generalized from the Binky
dogfood run. audit-core assessed as home candidate — it owns audit event
logging, not company audits, so the template stays in binky-control.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-16 10:56:17 +02:00
930b4ed64b BINKY-WP-0003-T04: bridge scheduler prepared (rhythm-session.sh + docs)
Headless lane-restricted rhythm session script and enable/disable docs in
OperatingRhythm.md. Crontab installation itself is a one-line founder
action — the permission layer refuses agent-installed persistence, which
is the correct boundary.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-16 10:54:42 +02:00
bc49a24c4c BINKY-WP-0003-T01: company email → OpenBao integration plan (AWQ-007 prep)
Vault path prod/binky/company-email/imap, secrets-engine catalog draft,
email-connect read-only IMAP wiring. Credential handover stays a single
Red-lane founder step.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-16 10:50:29 +02:00
69e2d05aa3 Draft BINKY-WP-0003: Autopilot Execution & Recurring Rhythm
Six tasks: OpenBao email onboarding, audit template v1, cost table,
workstation-cron bridge scheduler, activity-core wiring, llm-connect
assessment as workstation-independent executor (with kaizen-agentic).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-16 10:37:36 +02:00
364cb35497 Prepare first Office-Hour Command Day runbook; close BINKY-WP-0002
Runbook for early-August command day (StB call, DUO backlog, Qonto review,
HR excerpt); all 4 office-hour items marked prepared; workplan status done
in file and hub (workstream finished).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-16 09:16:43 +02:00
8043bf532d Establish operating rhythm (BINKY-WP-0002-T05)
OperatingRhythm.md (daily brief format, queue hygiene, weekly review),
AutopilotWorkQueue.md seeded with 6 evergreen items, first daily brief
written for 2026-07-16.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-16 09:15:38 +02:00
b046a2e2d1 Draft flagship Level-1 offer: Operational Knowledge Audit (BINKY-WP-0002-T04)
Full offer entry with target segment, promise, deliverables, price
hypothesis (2.5-4.5k EUR, 1.5k pilot), dogfood evidence, and dependencies.
Publishing remains Yellow lane.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-16 09:14:29 +02:00
febb9c9882 Populate Ecosystem Map via repo cartography (BINKY-WP-0002-T03)
85 repos classified into 12 capability clusters across the four pillars;
activity signal from last-commit dates; IP-evidence note linked to RISK-002.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-16 09:13:42 +02:00
3c2c47f20a Run OK Audit v0 on Binky itself (BINKY-WP-0002-T02)
Findings: filings current through JA 2024; no active StB mandate (RISK-006);
DUO backlog (RISK-007); 4 office-hour items queued; audit template v0 created;
first dogfood evidence entry logged.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-16 09:12:03 +02:00
5b1a4f62f5 Ratify company canon v1.0 (DEC-2026-001, approved with edits)
Founder edits: Railiance role refined to reliable deployment & operations;
Operational Knowledge added as fourth ecosystem pillar. Edits propagated to
EcosystemMap and DogfoodPolicy. DEC-2026-001 resolved; workplan task
BINKY-WP-0002-T01 closed in file and hub.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-16 03:15:11 +02:00
49d9ce2569 Conform workplan to canonical BINKY-WP prefix (BNKY-WP-0001 -> BINKY-WP-0002)
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-16 02:51:35 +02:00
d6d5cf1a1d Add company canon v0 and bootstrap workplan
Canon: INTENT, CompanyReactivationPlan, EcosystemMap, AutonomyPolicy,
SuccessMilestones, OfferCatalog, DogfoodPolicy, ControlLoopCatalog,
DecisionQueue, OfficeHourQueue, RiskRegister, plus founding exploration
in history/. Workplan BNKY-WP-0001 covers canon ratification, the first
internal audit, ecosystem cartography, flagship offer, and operating rhythm.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-16 02:48:50 +02:00
67d735ddec Seeded initial INTENT 2026-07-16 02:34:24 +02:00