prj-canon-federation/docs/evidence/2026-09-05-family-seed.md
tegwick 4da13c85cc Record Family seed completion and ready corpus distribution
Assistant: codex
Assistant-Model: gpt-6-astra
Assistant-Session: 01a070b5-4994-7271-bd8b-7c3dbcedec4b
2026-09-06 00:26:42 +02:00

1.9 KiB

Family concept-area seed — 2026-09-05

INFO-WP-0023 implements CFED-WP-0001-T13 under accepted ADR-006 R6. The Family seed names kinship, guardianship, dependency, care, and legal/biological/social parenthood as distinguishing structure; it retains time, interpretation and privacy concerns and records unanswered modeling questions.

Family is registered separately as a concept-area seed (family-area, retrieval artifact concept-area/family) with status seed and content_status seeded-not-authored. It is not a CollectiveActor subtype or a domain model. The seed contains no relationship schema, cardinalities, lifecycle/authorization rules or implementation requirements. Further modeling requires named demand. Household remains organization-owned under T12; original donor text is unchanged.

Retrieval reports exactly one Family owner. The domain-model count remains 14; the artifact inventory increases by one seed. All 38 protected seed/pre-existing workplan files match the adjacent SHA-256 snapshot. Seed links and whitespace checks pass. CFED T07 owns corpus disposition, T08 interface cards, and T10 the handoff of any demand-backed residual before project closure.

Reproduce from InfoTechCanon: make check and git diff --check. The existing inventory tests now expect the additional concept-area-seed artifact, with the same model count. Manual scope review verifies that the questions remain open and no Family model has been authored. Final receipts follow below.

Final verification: 46 tests pass, generated consistency, canon and small-saas profile checks pass. Published InfoTechCanon implementation: 3e31915. Native workplan UUID 52e723a5-c47a-5d46-b82a-e9d27c8c40ea, both tasks done. Both required consistency runs passed with no automation errors or assessment failures; existing classification/prefix advisories remain. Progress logged for both workplans. Project progress: 9/13, T07 todo. Publication finalized September 6.