# Family concept-area seed — 2026-09-05
|
|
|
|
INFO-WP-0023 implements CFED-WP-0001-T13 under accepted ADR-006 R6. The Family
|
|
seed names kinship, guardianship, dependency, care, and legal/biological/social
|
|
parenthood as distinguishing structure; it retains time, interpretation and
|
|
privacy concerns and records unanswered modeling questions.
|
|
|
|
Family is registered separately as a concept-area seed (`family-area`, retrieval
|
|
artifact `concept-area/family`) with status seed and content_status
|
|
seeded-not-authored. It is not a CollectiveActor subtype or a domain model. The
|
|
seed contains no relationship schema, cardinalities, lifecycle/authorization
|
|
rules or implementation requirements. Further modeling requires named demand.
|
|
Household remains organization-owned under T12; original donor text is unchanged.
|
|
|
|
Retrieval reports exactly one Family owner. The domain-model count remains 14;
|
|
the artifact inventory increases by one seed. All 38 protected seed/pre-existing
|
|
workplan files match the adjacent SHA-256 snapshot. Seed links and whitespace
|
|
checks pass. CFED T07 owns corpus disposition, T08 interface cards, and T10 the
|
|
handoff of any demand-backed residual before project closure.
|
|
|
|
Reproduce from InfoTechCanon: `make check` and `git diff --check`. The existing
|
|
inventory tests now expect the additional concept-area-seed artifact, with the
|
|
same model count. Manual scope review verifies that the questions remain open
|
|
and no Family model has been authored. Final receipts follow below.
|
|
|
|
Final verification: **46 tests pass**, generated consistency, canon and small-saas
|
|
profile checks pass. Published InfoTechCanon implementation: `3e31915`.
|
|
Native workplan UUID `52e723a5-c47a-5d46-b82a-e9d27c8c40ea`, both tasks done.
|
|
Both required consistency runs passed with no automation errors or assessment
|
|
failures; existing classification/prefix advisories remain. Progress logged for
|
|
both workplans. Project progress: 9/13, T07 todo. Publication finalized September 6.
|