Author SHA1 Message Date
8380634f4b Advance UPC-WP-0002: close OH-2026-004 prep gap, draft S1 package, record command-day slip
T01: verified all five OH items still prepared in binky-control (no activity
since 2026-08-08); the first-half-of-August command-day window lapsed at 0/5.
Tracker now records the slip rather than carrying a stale date. OH-2026-004
prep gap closed in binky-control (92838e1) — batch is founder-blocked, not
preparation-blocked.

T02: gate-map G1/G8 evidence columns refreshed.

T03: todo -> progress. Pre-drafted evidence/s1-decision-package.md with the
decision question, three options, and an evidence table keyed to the OH ids;
verdict cells fill once the batch drains. Not presented to the founder yet.

Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
2026-08-16 01:16:24 +02:00
cd53434e18 Activate UPC-WP-0002 and scaffold G1 OH batch evidence.
Promote vessel close-out to active, add evidence/g1-oh-batch.md with preflight
for OH-2026-001–005, and point gate/child maps at the live command-day path.
2026-08-12 00:47:22 +02:00
0fb5c7a8b5 Complete UPC-WP-0001 foundation: gate map, inventory, next WPs.
Deliver G1–G9 gate-to-evidence and child-workplan maps, baseline inventory
from binky-control, and proposed UPC-WP-0002–0004 for vessel, load, and
revenue clusters. Mark foundation finished with DoD-Ok.
2026-08-11 02:30:48 +02:00