| id | type | title | domain | repo | status | owner | topic_slug | repo_goal_id | created | updated | quality_dor | quality_dor_at | quality_dor_by | quality_dor_note | state_hub_workstream_id |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| UPC-WP-0002 | workplan | Company vessel close-out (G1 + residual G2/G8) | infotech | prj-unattended-progress-company | active | bernd | infotech | 79a2b057-b765-47ad-b5d9-c1bbc49eba43 | 2026-08-11 | 2026-08-16 | DoR-Ok | 2026-08-11 | grok | Coordinates G1 OH drain and evidence only; no production code; Orange/Red work stays human or batched. | 8d47ba5f-0608-5f83-8b4b-7dee53ada6f6 |
Company vessel close-out (G1 + residual G2/G8)
Goal
Drive G1 (administratively clean) to met or clearly residual-owned, and
shrink the Orange decision surface (G8) by completing the prepared
office-hour batch in binky-control.
Parent repo goal: 79a2b057-b765-47ad-b5d9-c1bbc49eba43
Baseline: inventory/baseline-g1-g9.md, architecture/gate-map.md.
This workplan coordinates and records evidence. Founder executes Red/Orange actions; agents prepare packages and update maps.
Linked child records (do not duplicate tasks)
| Record | Repo | Role |
|---|---|---|
| OH-2026-001 | binky-control | StB mandate JA 2025+ |
| OH-2026-002 | binky-control | DUO backlog / license transition |
| OH-2026-003 | binky-control | Qonto cost/access review |
| OH-2026-004 | binky-control | Handelsregister / address / purpose verify |
| OH-2026-005 | binky-control | Stripe stale webhook cleanup |
| CompanyReactivationPlan.md Phase 1 | binky-control | Checklist authority |
| SuccessMilestones.md S1 | binky-control | Founder milestone mark |
| Optional BINKY-WP-0008 | binky-control | Only if OH campaign needs a durable WP shell |
Track OH batch completion in project evidence
id: UPC-WP-0002-T01
status: progress
priority: high
state_hub_task_id: "ab714cd3-9457-5386-8b3c-056702c234e4"
For each of OH-2026-001…005, record in evidence/g1-oh-batch.md (create when
first item moves): id, date closed or deferred, outcome pointer into
binky-control, residual if any (origin: residual). Do not copy OH body
text.
Progress (2026-08-12): Tracker created at evidence/g1-oh-batch.md with
preflight for all five items (still 0/5 closed). Linked command-day runbook
binky-control/officehour/2026-08-command-day-runbook.md. Update rows as OH
items close in binky-control.
Progress (2026-08-16): Verified against binky-control — all five OH items
still prepared, no commits there since 2026-08-08, so the planned command-day
window (first half of August) lapsed with 0/5 drained. Tracker refreshed to
record the slip explicitly rather than letting a stale date imply progress.
Closed the batch's one prep gap: OH-2026-004 prepared_material was [] and
is now filled — free handelsregister.de retrieval path (no paid reseller),
the four fields to verify, the 2binky/ filing rule keeping personal data out
of repo evidence, and the explicit Orange/Red boundary (reading is Orange, any
notary-lane change is Red and must not be started on the day). All five items
now have usable prep; batch is founder-blocked, not preparation-blocked.
Progress (2026-08-16, later): Founder scheduled the command day for Sunday 2026-08-16 afternoon. Runbook rescheduled and resequenced for a Sunday: the Bohle-Horsmann office is closed, so OH-2026-001 loses its phone option and becomes an email dispatched first (to land Monday morning) rather than an item that closes on the day. Expected result is 4/5 closed + 001 awaiting reply, RISK-006 to “awaiting counterparty” rather than mitigated, with a Tue 2026-08-18 follow-up slot for call-or-fallback. OH-2026-005 was missing from the runbook's must-do list and has been added.
Keep gate map and Reactivation checklist aligned
id: UPC-WP-0002-T02
status: progress
priority: high
state_hub_task_id: "0d10e613-a92e-5f3a-8152-d24e25c8aeae"
After each OH close (or weekly), update architecture/gate-map.md G1/G8 rows
and confirm binky-control/CompanyReactivationPlan.md Phase 1 checkboxes
match evidence. Flag any Red-lane residual explicitly.
Progress (2026-08-12): Gate map G1/G8 evidence column points at
evidence/g1-oh-batch.md and active UPC-WP-0002. Full Reactivation checklist
sync waits on first OH closes.
Request S1 milestone update when vessel is clean enough
id: UPC-WP-0002-T03
status: progress
priority: medium
state_hub_task_id: "ac7e4972-d6bc-5e35-b34e-c51bfbcedf2b"
When G1 evidence supports “administratively clean,” prepare a Yellow decision
package for founder to mark S1 in SuccessMilestones.md (or document residual
exceptions). Link package id from this project.
Progress (2026-08-16): Package drafted at evidence/s1-decision-package.md
(UPC-EVID-S1-PKG-0001, status draft). Structure is complete — decision
question, three named options, evidence table keyed to the five OH ids, and the
gate rule that OH-2026-005 (Stripe hygiene) is not a G1 blocker while 001–004
are. Only the verdict cells are empty; they fill from evidence/g1-oh-batch.md
once the command day runs. Deliberately not presented to the founder yet —
a decision package with an empty evidence column is exactly the open-ended dump
invariant 5 prohibits. T03 stays progress until the batch drains.
Hand off non-G1 residuals
id: UPC-WP-0002-T04
status: progress
priority: medium
state_hub_task_id: "7fff1007-5283-5d3b-8408-d8a504b9542f"
Anything remaining after vessel close-out that is not G1 (domain inventory
AWQ-003, ecosystem cartography, etc.) must become a live residual in
binky-control or a later UPC-WP — not prose-only in this WP.
Progress (2026-08-16) — pre-close-out sweep. Ran the ownership sweep early
(it does not depend on the OH batch) against inventory/baseline-g1-g9.md,
architecture/gate-map.md, and binky-control/CompanyReactivationPlan.md:
| Non-G1 obligation | Owner | Verdict |
|---|---|---|
| Domain inventory, cartography, Eigenentwicklung IP evidence, open-weights retarget | AWQ-003, 006, 002, 012 | Live records already ✔ |
| Website / digital presence | UPC-WP-0004 (linked children) | Owned ✔ |
| G4 load measurement | UPC-WP-0003 (tasks proposed, not activated) | Owned ✔ |
| G3 acceptance evidence pack | UPC-WP-0003 | Owned ✔ |
| Contracts / IP ownership (GmbH vs Bernd privately) | — | Gap → new AWQ-013 |
One real gap. The Reactivation Plan calls IP ownership clarification “needed
before selling ecosystem products,” but it existed only as an unchecked
checklist box with no work record — and it gates G5/G6, the immediate
commercial move after the G1 drain. Now binky-control AWQ-013
(origin: residual, origin_ref: UPC-WP-0002-T04). It is distinct from
AWQ-002: that assembles IP evidence, this is the determination consuming
it. Inventory table is green-lane; the allocation/transfer itself is Red
(contracts, plausibly tax-relevant — worth an StB question once OH-2026-001
lands).
T04 stays progress: the sweep is a pre-pass, and the task closes only after
vessel close-out, when whatever the command day throws off is also routed.
Acceptance evidence expected back here
evidence/g1-oh-batch.mdwith all five OH items closed or residual-owned- Updated gate-map G1 status (
metorpartialwith explicit residuals) - Pointer to S1 decision or residual exceptions
- No open “ask Bernd because unsure” items for Phase 1 admin — only packaged Red/Orange leftovers
Out of scope
- Publishing the OK Audit offer (→ UPC-WP-0004 / binky Yellow package)
- Founder-load 30-day measurement (→ UPC-WP-0003)
- Production code or secret handling in this repo