Assistant: codex Assistant-Model: gpt-6-astra Assistant-Session: 01a13590-a16f-7f60-be60-fd71627bc99d
3.2 KiB
| id | type | title | domain | repo | topic_slug | status | flavor | owner | created | updated | reuse_check | state_hub_workstream_id |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| RAPP-PLAYWRIGHT-WP-0001 | workplan | Establish intent, delivery plans and State Hub integration | infotech | rapp-playwright | stack | finished | planning | codex | 2026-10-13 | 2026-10-13 | Extend capability.infotech.headless-browser with a provider; preserve existing source-reuse evidence. | a97c6998-4d20-5929-a9b1-8c396f679607 |
Establish the provider planning baseline
The requested stopping point is documentation, registration and notification. Service implementation belongs to the subsequent proposed workplans.
Review demand and establish intent
id: RAPP-PLAYWRIGHT-WP-0001-T01
status: done
priority: high
state_hub_task_id: "3f004442-f597-5305-8055-93b3d36c4864"
Reviewed CONTENT-WP-0000-T04, REUSE-IN-0001 and the existing capability record.
Recorded evidence and adopted sibling structures in docs/demand-and-reuse.md.
Authored INTENT.md and SCOPE.md with delivery ownership, consumer boundaries,
testable success criteria and planned availability. Sent the initial
reuse-surface update; no runtime availability was claimed.
Establish integration files and staged workplans
id: RAPP-PLAYWRIGHT-WP-0001-T02
status: done
priority: high
state_hub_task_id: "4f62cfc3-2886-5edc-8354-40caab59d239"
Review registration-generated AGENTS.md and offline brief. Document the actual planning-only developer workflow. Verify the three proposed workplans cover contract, reproducible service/package, and independent consumer proof with dependencies and acceptance criteria. Validate links, work-record shape and absence of unresolved template placeholders.
Completed 2026-10-13: reviewed generated integration files and added the actual planning-only workflow to AGENTS.md. Classification validation, all Markdown links, four workplan frontmatters and 13 fenced task records passed checks. The consistency audit regenerated WORK-RECORDS.md and the offline brief.
Register, verify projection and notify reuse-surface
id: RAPP-PLAYWRIGHT-WP-0001-T03
status: done
priority: high
state_hub_task_id: "24dd7ac3-ae89-5530-8b85-1673e9ac247a"
Register rapp-playwright under infotech/stack with its actual checkout and Forge
remote. Synchronize all four workplans and their tasks, and verify repository,
host path and work records in State Hub. Notify reuse-surface with provider docs,
workplan references and the planned-only availability boundary. Retain receipts
in docs/evidence/. Stop after this handoff.
Completed 2026-10-13: repository 23355f26-7ee1-4036-8c63-3ae78e3072bf registered
under infotech/stack with tooling classification, Forge remote and host path.
Repo Manager published and reconciled source revision 7331360 on primary
railiance01; separate API readback verified all four plans and 13 task states.
State Hub notification b6a965ed-c02b-49f2-9272-c234e7c8f6a1 persisted the final
reuse-surface handoff after the earlier TAMQ message remained pending.
See docs/evidence/2026-10-13-bootstrap.md and the notification receipt.
WP-0002 through WP-0004 retain the unstarted delivery work; there is no runtime
claim and no transfer of content-explorer's task ownership.